HomeMy WebLinkAbout13223RESOLUTION NO. 13223
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT
IN THE AMOUNT OF $31,452.75 TO CORTEZ CONSTRUCTION
CO., INC., FOR EMERGENCY SANITARY SEWER POINT
REPAIR IN THE ALLEY BEHIND 816 MINNEQUA AVENUE AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and
WHEREAS, the point repair work was awarded to Cortez Construction Co., Inc., under
the 2015-2016 multi-year point repair contract ; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer main in the alley behind 816 Minnequa
Street. Contract Agreement for Sanitary Sewer Repair with Cortez Construction Co., Inc.,
Project No. 14-067 (WWAN03) is hereby awarded to said bidder in the amount of $31,452.75.
SECTION 2.
Funds for Project 14-067 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: _ May 11, 2015
BY: Ed Brown
City Clerk’s Office Item # M-2
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: May 11, 2015
TO: President Stephen G. Nawrocki and Members of City Council
CC: Sam Azad, City Manager
VIA: Gina Dutcher, City Clerk
From: Gene Michael, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $31,452.75 TO CORTEZ CONSTRUCTION CO., INC., FOR EMERGENCY
SANITARY SEWER POINT REPAIR IN THE ALLEY BEHIND 816 MINNEQUA
AVENUE AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
SUMMARY:
Attached is a resolution awarding a construction contract to Cortez Construction Co., Inc. for
emergency sanitary sewer point repair in the alley behind 816 Minnequa Avenue.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
A collapsed sewer main caused a severe backup into 816 Minnequa Avenue on March 16,
2015. The sewer main is located in the alley running behind 816 Minnequa Avenue. The sewer
main that failed was a 6-inch diameter main. A sewer cleaning head became stuck in the main,
200 feet of hose had to be abandoned over the weekend, and the resident needed to move out
of the house pending remediation of the backup due to the odor inside the house.
The quote for the unit prices for the work by Cortez Construction Co., Inc. and the change order
for the project are attached. This work was performed under the Sanitary Sewer Point Repair
multi-year contract under which four (4) contractors were qualified via competitive bid. During
the project the costs were modified by actual field quantities as noted on the attached change
order.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Remove & Replace 8" PVC < 12' $4,025.00
Remove & Replace 48-inch Manhole $4,600.00
Traffic Control Plus 15% Per Contract $868.50
Reinstate Service $517.50
Mobilization $833.75
34%
Subtotal: $10,844.75
Surface Improvement-related
Asphalt Patch $20,608.00
66%
Subtotal: $20,608.00
TOTAL: $31,452.75
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to
Project No. 14-067 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would make no improvements to the existing sanitary system and
the collapsed sewer main would remain. This would lead to backups into other properties served
by the collapsed sewer main, or sanitary sewer overflows releasing untreated sewage into the
environment. Backups cause a serious health and safety concern to the public.
Alternative No. 2 – Place the Main on the Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The
main would be put on a rehabilitation list and prioritized by the level of importance for future
rehabilitation projects. In addition, the collapsed main would remain and could cause backups of
raw sewage into the adjacent properties, or could cause sanitary sewer overflows releasing
untreated sewage into the environment. Due to this risk of backup or sanitary sewer overflow, a
serious health and safety issue would still be present to the public.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF WASTEWATER
Project Number: 13-012 Change Order No. : ONE 3/26/2015 Page 1 of 1
Project Name : 816 Minnequa Ave.
Contractor: Cortez Construction
You are hereby requested to comply with the following changes from the plans&specifications:
•
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 Remove and Replace 8"PVC<8' ($287.50)
2 Asphalt Patch 4"on 6" $13,765.50
4 Reinstate Services ($1,035.00)
EW-1 Traffic Control $868.50
TOTAL (Decrease)/Increase ($1,322.50) $14,634.00
Net Adjustment This Change Order $ 13,311.50
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 18,141.25
Total Adjusted Contract Amount To Date $ 31,452.75
Reason For Change: Actual Field Quantities.
The time provided for completion of the contract is unchanged by by 0 calendar days.
This document shall become an amendment to the contract and all •rovisions of the contract a••I hereto.
Prepared by: Date:
Wastewater Inspector
Reviewed by: Date:
Wastewater Engineering Supervisor
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
816 Minnequa Avenue
Emergency Repair Location Map
;,•-",For r - _...,,,. _ , , . . , -,,, , - 0 ,..„- .. , tr - ,, . .,
, . .r rii ,-. ..,,...
,,.._ . _ , , r----' . r"'", I
.... ._,t ` - r
MINIS ,
0111.
- Lakeview Ave n "`- r � " + !: ^-.� ' { � ' �.;iM
1
tri,----001,,,,N,..-
� ` --�`a o , . , , .�.. nM -
V ItW.9.; ;.1. 1 , .
,, , .. „,,,t, ,,,,,,,, „ . „. i it... ,r.0---4 I,- . , , ....***-111br ,... 'z,,,,,*,
^� •, _ 0Emerson Ave -
O
; 4-11 r - . r "!'I�'�
pro-1.
tr.—ries Aiiii -. 1
11,'
so
.. 1 ,•I•••• i Yit *Al
a� ..c `I` .. -8` r, d
„*_ ` ..,. O. war $ tby
ton
wr� p A'P
• r .. ff, _
-
- 46414
� — ir- �,° REPAIR LOCATION* ' ' ,. .
Y. '�, - " ,.• .,
C7
ittralite ..1**-11112P3/4.i ........
tsk r.— ... ...... ,
. — ti„6,1)
% k
r.."' 'J.:4%} " tP � - uywr '
I
.x
'i �„, .- $ 4 , Fr ar— , _ ..j, r. ,ikAta,
t
,•.a * - ' •-ice -- ..
.. _ ._� �►
+w .r 40,117 , +� rim*
Pueblo County EDGIS;'Pi ometry International