Loading...
HomeMy WebLinkAbout13161RESOLUTION NO. 13161 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $76,595.06 TO PARKER EXCAVATING INC., FOR EMERGENCY STORMWATER SEWER REPAIR IN THE th INTERSECTION OF NORTH ERIE AVENUE AND EAST 7 STREET AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, an emergency storm sewer repair was authorized by the Pueblo City Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and WHEREAS, the repair work was awarded to Parker Excavating Inc., under the 2013-2014 multi-year point repair contract ; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. This contract is for repair of the storm sewer main in the intersection of North Erie Avenue th and East 7 Street. Contract Agreement for Stormwater Sewer Repair with Parker Excavating Inc., Project No. 13-012 (SW0603) is hereby awarded to said bidder in the amount of $76,595.06. SECTION 2. Funds for Project 13-012 (SW0603) shall be from the Stormwater Utility funds. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to effectuate the transactions described therein. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: _ February 9, 2015 BY: Ed Brown City Clerk’s Office Item # M-1 Background Paper for Proposed Resolution COUNCIL MEETING DATE: February 9, 2015 TO: President Stephen G. Nawrocki and Members of City Council CC: Sam Azad, City Manager VIA: Gina Dutcher, City Clerk From: Earl Wilkinson, Public Works Director SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $76,595.06 TO PARKER EXCAVATING INC., FOR EMERGENCY STORMWATER SEWER REPAIR IN THE INTERSECTION OF NORTH ERIE AVENUE AND EAST th 7 STREET AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME SUMMARY: Attached is a resolution awarding a construction contract to Parker Excavating Inc., for emergency th storm sewer repair in the intersection of North Erie Avenue and East 7 Street. PREVIOUS COUNCIL ACTION : None BACKGROUND : On October 16, 2014, the Stormwater Enterprise was contacted by the Board of Water Works (BOWW) to inspect 2 storm laterals that had been damaged during their rerouting project for the El Centro del Quinto Sol Park and Trails Project. BOWW needed to complete their project before freezing weather set in and the storm laterals had to be replaced before stormwater could have a chance of undermining and damaging utilities and the roadway in the area. After further investigation, it was found that a new manhole and inlet would be required to assure there would be no conflicts with the new and existing waterlines. Therefore, it was determined that the repair should be completed immediately. The quote for the unit prices for the work by Parker Excavating Inc. and the change order for the project are attached. This work was performed under the Sanitary Sewer Point Repair multi-year contract under which nine (9) contractors were qualified viacompetitive bid. During the project the costs were modified by actual field quantities as noted on the attached change order. The cost breakdown for the project is as follows: Remove & Replace 15” RCP < 8' $4,176.00 Remove & Replace 60” Manhole $4,800.00 Remove & Replace 6” Reinforced Conc. $2,934.00 Remove & Replace Stand. Curb & Gutter $925.00 Remove & Replace Type S Inlet $4,800.00 Flowfill $1,383.34 Extra Concrete $486.72 Cut and Grout Inlet Box $1,440.00 Modify Manhole $2,560.00 Asphalt Patch – 4” on 6” Class 6 ABC $52,290.00 Mobilization $800.00 TOTAL: $76,595.06 FINANCIAL IMPLICATIONS : Funding for this project will come from the Stormwater Utility funds. Funding is available and has been budgeted, appropriated and allocated to Project No. 13-012 (SW0603). BOARD/COMMISSION RECOMMENDATION : Not applicable STAKEHOLDER PROCESS : None ALTERNATIVES : Alternative No. 1 – No Action Under this alternative, the City would make no improvements to the damaged storm sewer which will begin causing undermining of nearby utilities and possibly collapsing the street creating a serious health and safety issue to the public. RECOMMENDATION : Approval of the Resolution. Attachments : Change Order Bid Summary Sheet CONTRACT CHANGE ORDER CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS Project Number: 13-012 Change Order No. : ONE 1/1212015 Page 1 of 1 Project Name: Intersection of North Erie Avenue and East 7th Street Contractor: Parker Excavating,Inc. You are hereby requested to comply with the following changes from the plans&specifications: Bid Item Description of Changes Decrease Increase No. Contract By Contract By 1 Remove&Replace 8"PVC Less than 8' ($3,008.00) 2 Asphalt Patch-4"on 6"Class ABC $1,450.00 3 Remove&Replace 6"Reinforced Cone $1,584.00 4 Remove&Replace Standard Curb and Gutter $50.00 5 Remove&Replace 48"Diameter Manhole ($2,950.00) 6 Flowfill $1,383.34 7 Type S Inlet $4,800.00 8 Asphalt Patch-4"-Waterline $48,114.00 9 Redo Manhole $2,560.00 10 Extra Concrete $486.72 11 Re-cut and Grout Inlet Box $1,440.00 12 Remove&Replace 15"RCP Less than 8' $4,176.00 13 Remove&Replace 60"Diameter Manhole $4,800.00 TOTAL (Decrease Tlncrease {$5,958.00y,' $70,844.b6 Net Adjustment This Change Order $ 64,886.06 Amount of Previous Change Order(s) $ 0.00 Original Contract Amount $ 11,709.00 Total Adjusted Contract Amount To Date $ 76,595.06 Reason For Change: Actual Field Quantities. Extra work needed to com lets ro act. the time provided for comptetlon of the contract"Is unchanged by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: Date: Associate Engineer II Reviewed by: Date: ACM for Stormweler Accepted by: Date: Contractors Representative If this Change Order causes an increase from the original contract price,signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: Date: Stormwator Director FORM CO100.1299