HomeMy WebLinkAbout13145RESOLUTION NO. 13145
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT
IN THE AMOUNT OF $46,589.70 TO PARKER EXCAVATING
INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR IN
THE ALLEY BEHIND 1600 VAN BUREN STREET AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and
WHEREAS, the point repair work was awarded to Parker Excavating Inc., under the
2013-2014 multi-year point repair contract ; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer main in the alley behind 1600 Van Buren
Street. Contract Agreement for Sanitary Sewer Repair with Parker Excavating Inc., Project No.
13-012 (WWAN03) is hereby awarded to said bidder in the amount of $46,589.70.
SECTION 2.
Funds for Project 13-012 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: _ January 12, 2015
BY: Ami Nawrocki
City Clerk’s Office Item # M-4
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: January 12, 2015
TO: President Stephen G. Nawrocki and Members of City Council
CC: Sam Azad, City Manager
VIA: Gina Dutcher, City Clerk
From: Gene Michael, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE
AMOUNT OF $46,589.70 TO PARKER EXCAVATING INC., FOR
EMERGENCY SANITARY SEWER POINT REPAIR IN THE ALLEY
BEHIND 1600 VAN BUREN STREET. AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
Attached is a resolution awarding a construction contract to Parker Excavating Inc., for
emergency sanitary sewer repair in the alley behind 1600 Van Buren Street.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On October 14, 2014, the Wastewater Department reviewed a TVI report and video
which was flagged for review due to a large hole/void which was found in the main. After
further investigation, it was found that the large hole/void had actually become larger
and was creating a dangerous situation to anyone commuting through the alley.
Pressure from the vehicles above could have caused collapse. In addition, the main had
several sags at more than 20% capacity of the pipe. Therefore, it was determined that
the hole/void should be repaired immediately. In addition, due the overall poor condition
of the entire main, it was decided to remove and replace the main in its entirety. Parker
Excavating Inc. was asked to remove and replace the 335 linear feet of 8-inch pipe to
ensure collapse did not occur and to ensure public health and safety.
The quote for the unit prices for the work by Parker Excavating Inc. and the change
order for the project are attached. This work was performed under the Sanitary Sewer
Point Repair multi-year contract under which nine (9) contractors were qualified via
competitive bid. During the project the costs were modified by actual field quantities as
noted on the attached change order.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Remove & Replace 8-inch PVC < 8' $18,760.00
Reinstate Services $2,000.00
Remove and Replace 48” Manhole $8,850.00
Traffic Control $5,000.00
Mobilization $800.00
76%
Subtotal: $35,410.00
Surface Improvement-related
Remove & Replace 7” Reinforced
Concrete $2,502.00
Remove and Replace 6” Concrete $1,966.50
Remove and Replace Standard Curb
and Gutter $675.00
Asphalt Patch – 4” on 6” Class 6 ABC $4,060.00
Flowfill $1,976.20
24%
Subtotal: $11,179.70
TOTAL: $46,589.70
FINANCIAL IMPLICATIONS
:
Funding for this project will come from the sanitary sewer rehabilitation budget funded
by the Sewer User Fund. Funding is available and has been budgeted, appropriated
and allocated to Project No. 13-012 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would make no improvements to the existing sanitary
system and the large hole/void would remain in the 8-inch sewer main. This could cause
the ground above to collapse which would create a serious health and safety issue to the
public.
Alternative No. 2 – Place the 8-inch Main on the Rehabilitation List
Under this alternative, the City would make no immediate improvements to the existing
sanitary system. The 8-inch main would be put on a rehabilitation list and prioritized by
the level of importance for future rehabilitation projects. Again, the hole/void would
remain in the main and there would be a risk that the above ground would collapse and
create a serious health and safety issue to the public.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF WASTEWATER
Project Number; 13-012 Change Order No. : ONE 12/19/2014 Page 1 of 1
Project Name : 1600 VAN BUREN
Contractor: PARKER EXCAVATING, INC.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. , Contract By Contract By
1 R&R 8"PVC PIPE LESS THAN 8' $280.00
2 ASPHALT PATCH-4"ON 6"CLASS 6 ABC (21-100') $116.00
3 R&R 7"REINFORCED CONCRETE ($270.00)
4 R&R 6"CONCRETE $1,111.50
5 R&R STANDARD CURB AND GUTTER $25.00
6 R&R 48"MANHOLE $2,950.00
7 FLOWFILL $1,976.20
8 TRAFFIC CONTROL $5,000.00
TOTAL (Decrease)/Increase ($270.00)II $11,458.70
Net Adjustment This Change Order $ 11,188.70
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 35,401.00
Total Adjusted Contract Amount To Date $ 46,589.70
Reason For Change: Actual Field Quantities.
The time provided for completion of the contract is unchanged by by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Associate Engineer If
Reviewed by: Date:
Wastewater Engineering Supervisor
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Wastewater Director
FORM CO100.1299
r
r
r +: I$ : q ` 3, * ,ilk=,. ire r i
,,, „is,„„ssiii �,
' Y BEHIN401,
D' 16OO VAN BUREN T. -1 F.
v '
rALLE�
: EMERGENCY REPAIR ' ' r. 1 .:-' �"
* tt.1 ,; ... tea.
fr � �
v Northern Ave I '
'ri { ''.
114
y
r.'- �$ir
Ar ` . ,- .
,f �• � _r- ,x.1
�,,a At .:„
a� '
or-4
$, 1, .+
i � 1.06,04
i t
� �(DanforthAe) ....
, , , 0 1 . ar �`aiAl , ,i * ,'rn r
it,
, li
Sill
imr
4
z
{ ,i�1:3flItI1T1 /�ilr ► ,^ .r l ""
b s_,.
' /J �I1� Ave) 1x.11yy�
,}z li}Ei` py}, w Corwin tl )� } 1 - '� r1
1
rte- 7 i ,7 rt)
I j �~ ,..,_„ - r L Cx ,
`A� IP
3 � i
'* ,I Y I flo - . , /Al° ) mill I.,' ,:.,.-.,....,1
." a) �_. ..v. 0.---
c:111 a 1
r
1°4ir► 4. i aY 1 ►� " 1....s..,
a,,A ,
T 11,
li
:11:4114. ,
*411 e...
ate 'lube x}, . R l�1 f"�'"°" °' *14...0446:::"
I.�
I
h
4 4,
,.a - ....... M. ....,.moi �- r.
b
in
et Y 0-
q�Y
Pli‘s"—Poom 70"
4011/
iri s,
,.,�I �.J' ,�.
OM ,ov
1�� ....7 ' Inr. 1,...,1 I .r.,*..,„: ,fi ',9s. '�
mor7,4741100 Il...7,0,i--,'
i t a, VI. r ' 1.0 i:pt. r- ,.
a
' Ifilleh f+ ` ,. ,4° 1 11''''44. r"''' 411" ,-/res:. -": ' ' * oip , * 4 4
klifell:' (1)" '..: - , ill :1004010., , '4, ,.,.. , ":„... -**t:'-"*, ''''''' -2. ;'' .... 4 , „ -j REPAIR LUCAT
r
ar
Uyy�
�. ...,...m.., � Gu 4 � r .al,yr� .e -rr- d P"
.../-;-**' , ,.
d
r aw 8 t
�i* c a r x
s
"
, M - ►(Fty`-)1711e Avt
ii' 4 � -E,: 4 .mow. . S. +' _,.�- T044 -_.
1.:>, lit .,na '~ '^.-;*AT .� 4.4..'
""" r r ..vim � ,' 1n`"
a
albA 1AI �ir.. . %4 "( uv{Ilr, iinly I I)(al Iit° Ii�sliyhilt in;Ilion al
I '