Loading...
HomeMy WebLinkAbout13120RESOLUTION NO. 13120 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $3,197 TO CORTEZ CONSTRUCTION CO., INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR IN THE ALLEY BEHIND 1209 NORTH MAIN STREET AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and WHEREAS, the point repair work was awarded to Cortez Construction Co., Inc., under the 2013-2014 multi-year point repair contract ; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. This contract is for repair of the sanitary sewer main in the alley behind 1209 North Main Street. Contract Agreement for Sanitary Sewer Repair with Cortez Construction Co., Inc., Project No. 13-012 (WWAN03) is hereby awarded to said bidder in the amount of $3,197. SECTION 2. Funds for Project 13-021 (WWAN03) shall be from the Sewer User Fund. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to effectuate the transactions described therein. Furthermore, all actions previously taken by officers and staff of the City consistent with the contract including any payments authorized under the contract are hereby ratified. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: November 24, 2014 BY: Eva Montoya City Clerk’s Office Item # M-19 Background Paper for Proposed Resolution COUNCIL MEETING DATE: November 24, 2014 TO: President Stephen G. Nawrocki and Members of City Council CC: Sam Azad, City Manager VIA: Gina Dutcher, City Clerk From: Gene Michael, Wastewater Director SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $3,197 TO CORTEZ CONSTRUCTION CO., INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR IN THE ALLEY BEHIND 1209 NORTH MAIN STREET AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME SUMMARY: Attached is a resolution awarding a construction contract to Cortez Construction Co., Inc. for emergency sanitary sewer point repair in the alley behind 1209 North Main Street. PREVIOUS COUNCIL ACTION : None BACKGROUND : On August 29, 2014, the Wastewater Department discovered that the 8-inch main in the alley behind 1209 North Main Street had an obstruction which was causing the sewer line cleaning head to get stuck in the line. Therefore, after a televised inspection was completed and reviewed, a large break with a visible void and a large joint offset had caused the 8-inch main to act more as a 4-inch line. Due to the problem, soil was entering the main. Eventually, the break and separation would potentially lead to back- ups as the raw sewage would collect and be unable to drain properly. The break in the sewer main was approximately 37 linear feet from the upstream manhole, putting it directly in the middle of Main Street. Therefore, it was determined that the break and offset joint in the line needed to be repaired. Cortez Construction Co., Inc. was asked to install a new section of 8-inch pipe to ensure backups did not occur and to ensure public health and safety. The quote for the unit prices for the work by Cortez Construction Co., Inc. and the change order for the project are attached. This work was performed under the Sanitary Sewer Point Repair multi-year contract under which nine (9) contractors were qualified via competitive bid. During the project the costs were modified by actual field quantities as noted on the attached change order. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Remove & Replace 8" PVC < 8' $552.00 Traffic Control Plus 15% Per Contract $555.45 Mobilization $747.50 58% Subtotal: $1,854.95 Surface Improvement-related Asphalt Patch $569.25 Deliver and Place Flowfill Plus 15% Per Contract $772.80 42% Subtotal: $1,342.05 TOTAL: $3,197.00 FINANCIAL IMPLICATIONS : Funding for this project will come from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding was available and had been budgeted, appropriated and allocated to Project No. 13-012 (WWAN03). BOARD/COMMISSION RECOMMENDATION : Not applicable STAKEHOLDER PROCESS : None ALTERNATIVES : Alternative No. 1 – No Action Under this alternative, the City would make no improvements to the existing sanitary system and the 8-inch main would continue to hold water. This would eventually lead to raw sewage exiting the main, increased risk of backups, and increasing the risk for collapse in the middle of Main Street. Alternative No. 2 – Place the 8-inch Main on the Rehabilitation List Under this alternative, the City would make no immediate improvements to the existing sanitary system. The 8-inch main would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation projects. Again, there would be a risk that raw sewage continue exiting the main, increased risk of backups, and increasing the risk for collapse in the middle of Main Street. RECOMMENDATION : Approval of the Resolution. Attachments : Bid Summary Sheet Change Order Site Location Map CONTRACT CHANGE ORDER CITY OF PUEBLO DEPARTMENT OF WASTEWATER Project Number: 13-012 Change Order No. : ONE 9/16/2014 Page 1 of 1 Project Name: 1209 N. MAIN ST. Contractor: CORTEZ CONSTRUCTION CO., INC. You are hereby requested to comply with the following changes from the plans&specifications: Bid Item Description of Changes Decrease Increase No. Contract By Contract By 1 R&R 8"PVC PIPE LESS THAN 12' ($1,127.00) 2 ASPHALT PATCH-4"ON 6"CLASS 6 ABC ($1,449.00) 3 ASPHALT PATCH $569.25 4 R&R 8"PVC PIPE LESS THAN 8' $552.00 5 DELIVER AND PLACE FLOWFILL+ 15% PER CONTRACT $772.80 6 TRAFFIC CONTROL+ 15%PER CONTRACT $555.45 TOTAL (Decrease)/Increase ($2,576.00) $2,449.50 Net Adjustment This Change Order $ (126.50) Amount of Previous Change Order(s) $ 0.00 Original Contract Amount $ 3,323.50 Total Adjusted Contract Amount To Date $ 3,197.00 Reason For Change: Actual Field Quantities. The time provided for completion of the contract is unchanged by by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: Date: Associate Engineer II Reviewed by: Date: Wastewater Engineering Supervisor Accepted by: Date: Contractor's Representative If this Change Order causes an increase from the original contract price, signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: Date: Director of Wastewater FORM CO100.1299