Loading...
HomeMy WebLinkAbout13121RESOLUTION NO. 13121 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $3,593.75 TO CORTEZ CONSTRUCTION CO., INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR IN THE ALLEY BEHIND 1706 BRAGDON AVENUE AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and WHEREAS, the point repair work was awarded to Cortez Construction Co., Inc., under the 2013-2014 multi-year point repair contract ; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. This contract is for repair of the sanitary sewer main in the alley behind 1706 Bragdon Avenue. Contract Agreement for Sanitary Sewer Repair with Cortez Construction Co., Inc., Project No. 13-012 (WWAN03) is hereby awarded to said bidder in the amount of $3,685.75. SECTION 2. Funds for Project 13-021 (WWAN03) shall be from the Sewer User Fund. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to effectuate the transactions described therein. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: November 24, 2014 BY: Eva Montoya City Clerk’s Office Item # M-20 Background Paper for Proposed Resolution COUNCIL MEETING DATE: November 24, 2014 TO: President Stephen G. Nawrocki and Members of City Council CC: Sam Azad, City Manager VIA: Gina Dutcher, City Clerk From: Gene Michael, Wastewater Director SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $3,593.75 TO CORTEZ CONSTRUCTION CO., INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR IN THE ALLEY BEHIND 1706 BRAGDON AVENUE AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME SUMMARY: Attached is a resolution awarding a construction contract to Cortez Construction Co., Inc. for emergency sanitary sewer point repair in the alley behind 1706 Bragdon Avenue. PREVIOUS COUNCIL ACTION : None BACKGROUND : On October 22, 2014, the Wastewater Department was informed that the 8-inch main in the alley behind 1706 Bragdon Avenue was broken and there were 1-inch diameter roots coming from the tap into the main. The problem was discovered after a telephone call from Patterson Plumbing was reinstating a tap for the customer at 1706 Bragdon Avenue and in digging the trench, found the break in the main. Patterson Plumbing called us immediately to have us come and repair the main. Due to the structural issues in the sewer main, soil was allowed to enter the main and wastewater to exit. As raw sewage exits the main, it can potentially enter the groundwater, causing a serious public health and safety concern. In addition, since Patterson Plumbing already had a trench dug, the hole left in the alley would also pose a public safety problem. Therefore, it was determined that the break in the main needed to be repaired and the tap reinstated. Cortez Construction Co., Inc. was asked to install a new section of 8-inch pipe to ensure raw wastewater did not exit the main and to ensure public health and safety. The quote for the unit prices for the work by Cortez Construction Co., Inc. and the change order for the project are attached. This work was performed under the Sanitary Sewer Point Repair multi-year contract under which nine (9) contractors were qualified via competitive bid. During the project the costs were modified by actual field quantities as noted on the attached change order. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Remove & Replace 8" PVC < 8' $414.00 Reinstate Service $862.50 Mobilization $747.50 56% Subtotal: $2,024.00 Surface Improvement-related Asphalt Patch – 4-inch Depth (20-100’) $1,293.75 Deliver and Place 1 Load Class 6 Plus 15% Per Contract $276.00 44% Subtotal: $1,569.75 TOTAL: $3,593.75 FINANCIAL IMPLICATIONS : Funding for this project will come from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding is available and has been budgeted, appropriated and allocated to Project No. 13-012 (WWAN03). BOARD/COMMISSION RECOMMENDATION : Not applicable STAKEHOLDER PROCESS : None ALTERNATIVES : Alternative No. 1 – No Action Under this alternative, the City would make no improvements to the existing sanitary system and the 8-inch main would continue to release raw sewage into the groundwater. In addition, the trench created in the alley would not be filled back in. This creates a serious health and safety issue to the public. Alternative No. 2 – Place the 8-inch Main on the Rehabilitation List Under this alternative, the City would make no immediate improvements to the existing sanitary system. The 8-inch main would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation projects. Again, there would be a risk that raw sewage continues exiting the main, and a serious health and safety issue would still be present to the public. RECOMMENDATION : Approval of the Resolution. Attachments : Bid Summary Sheet Change Order Site Location Map CONTRACT CHANGE ORDER CITY OF PUEBLO DEPARTMENT OF WASTEWATER Project Number: 13-012 Change Order No. : ONE 11/5/2014 Page 1 of 1 Project Name : 1706 BRAGDON • Contractor: CORTEZ CONSTRUCTION CO., INC. You are hereby requested to comply with the following changes from the plans&specifications: Bid Item Description of Changes Decrease Increase No. Contract By Contract By 1 R&R 8"PVC PIPE LESS THAN 8' $69.00 2 ASPHALT PATCH -4"ON 6"CLASS 6 ABC(1-20') ($442.75) 4 REINSTATE SERVICE $862.50 5 DELIVER&PLACE 1 LOAD CLASS 6+ 15% PER CONTRACT $276.00 6 ASPHALT PATCH 4"DEPTH (21-100') $1,293.75 TOTAL (Decrease)/Increase I ($442.75) $2,501.25 , Net Adjustment This Change Order $ 2,058.50 Amount of Previous Change Order(s) $ 0.00 Original Contract Amount $ 1,535.25 Total Adjusted Contract Amount To Date $ 3,593.75 Reason For Change: Actual Field Quantities. The time provided for completion of the contract is unchanged by by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: Date: Associate Engineer II Reviewed by: Date: Wastewater Engineering Supervisor Accepted by: Date: Contractor's Representative If this Change Order causes an increase from the original contract price, signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: Date: Wastewater Director FORM CO100.1299