Background Paper for Proposed
ORDINANCE
DATE:August 26, 2013 AGENDA ITEM # R-3
DEPARTMENT: Wastewater Department
Gene Michael, Director
TITLE
AN ORDINANCE APPROVING AN INTERGOVERNMENTAL AGREEMENT
BETWEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND OTHER
GOVERNMENTAL ENTITIES RELATING TO THE ARKANSAS RIVER FOUNTAIN
CREEK COALITION FOR URBAN/RURAL RIVER EVALUATION PROJECT AND
AUTHORIZING THE PRESIDENT OF THE CITY COUNCIL TO EXECUTE SAME
ISSUE
Should Council approve an intergovernmental agreement between the City of Pueblo, a
Municipal Corporation, and other governmental entities relating to the Arkansas River
Fountain Creek Coalition for Urban/Rural River Evaluation (“AF CURE”) Project to
address water quality matters of concern to the participants?
RECOMMENDATION
Approve the Ordinance.
BACKGROUND
Current members of the Pikes Peak Regional Water Authority and other entities
propose to form the AF CURE Project to address water quality matters of concern to the
participants. These matters will include, but are not limited to coordinated monitoring,
sampling, analysis and reporting of discharges and stream water quality within and
connected to the watershed areas of the Fountain Creek, Chico Creek, as well as the
Arkansas River from the Pueblo Reservoir to the John Martin Reservoir where the
participants have discharges. The activities will initially focus on compliance with Water
Quality Control Commission Regulation 85, related to nutrients. Other matters
determined by the AF CURE Project committee to be of mutual concern or interest to
AF CURE may be pursued as well.
The Ordinance approves the attached AF CURE Project Participation Agreement and
the City’s participation therein. In addition, the Ordinance appoints the Wastewater
Department Director, or his or her designee, as the City’s representative.
FINANCIAL IMPACT
Pursuant to the Participation Agreement, participants of the AF CURE must be
members or associates of the Pikes Peak Regional Water Authority (“Authority”) and
may become associates of the Authority solely for the purpose of participating in the AF
CURE Project.
Cost for membership as an associate in the Authority is $650. In addition, each
participant shall share in the AF CURE Project expenses as it relates to benefit provided
to the participant, as determined by the AF CURE Committee.
The City of Pueblo’s Wastewater Department currently undertakes studies that
specifically address issues facing the City’s Wastewater Treatment Facility. The AF
CURE Project will allow the sharing of resources where issues are common to the
participants.
The cost of membership and the City’s share of AF CURE Project expenses shall be
paid from the Sewer User Fund.
ORDINANCE NO. 8626
AN ORDINANCE APPROVING AN INTERGOVERNMENTAL
AGREEMENT BETWEEN THE CITY OF PUEBLO, A
MUNICIPAL CORPORATION, AND OTHER
GOVERNMENTAL ENTITIES RELATING TO THE
ARKANSAS RIVER FOUNTAIN CREEK COALITION FOR
URBAN/RURAL RIVER EVALUATION PROJECT AND
AUTHORIZING THE PRESIDENT OF THE CITY COUNCIL
TO EXECUTE SAME
WHEREAS, the following entities wish to establish the Arkansas River Fountain
Creek Coalition for Urban/Rural River Evaluation (“AF CURE”) Project: Pikes Peak
Regional Water Authority, Upper Monument Creek Regional Wastewater Treatment
Facility, Cherokee Metropolitan District, Security Sanitation District, Widefield Water and
Sanitation District, Fountain Sanitation District, City of Pueblo (“City”), Pueblo West
Metropolitan District, Colorado Springs Utilities, Lower Fountain Metropolitan Sewage
Disposal District, Tri Lakes Wastewater Treatment Facility, and Woodmen Hills
Metropolitan District (“Participants”) ; and
WHEREAS, the AF CURE Project area includes watershed portions of the
Fountain Creek, Chico Creek, as well as the Arkansas River from the Pueblo Reservoir
to the John Martin Reservoir where the Participates have discharges; and
WHEREAS, the AF CURE Project will address water quality matters of concern
to the Participants; and
WHEREAS, the AF CURE Project Committee shall consist of one representative
appointed by each Participant and each Participant shall appoint an alternate
representative; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
The Intergovernmental Agreement by and between the City of Pueblo and other
governmental entities concerning the AF CURE Project dated June 25, 2013 (“AF
CURE Project Participation Agreement”), a true copy of which is attached hereto and
incorporated herein by reference, having been approved as to form by the City Attorney,
is hereby approved.
SECTION 2.
The City’s Wastewater Department Director, or his or her designee, is hereby
appointed the City’s representative as a Participant in the AF CURE Project.
SECTION 3.
The President of the City Council is hereby authorized to execute the AF CURE
Project Participation Agreement, and the City Clerk is directed to affix the seal of the
City thereto and attest same.
SECTION 4.
The officers of the City are directed and authorized to perform any and all acts
consistent with the intent of this Ordinance and the attached AF CURE Project
Participation Agreement to effectuate the policies and procedures described therein.
SECTION 5.
This Ordinance shall become effective immediately upon passage and approval.
INTRODUCED: August 26, 2013
BY: Ami Nawrocki
PASSED AND APPROVED: September 9, 2013
Final
June 25, 2013
ARKANSAS RIVER FOUNTAIN CREEK COALITION FOR
URBAN /RURAL RIVER EVALUATION (AF CURE)
PROJECT PARTICIPATION AGREEMENT
PIKES PEAK REGIONAL WATER AUTHORITY
This AF CURE Project Participation Agreement ( "Agreement ") is made June 25, 2013,
by and among the Pikes Peak Regional Water Authority ( "Authority ") and the following eleven
participating members and associates of the Authority ( "Participants "): Upper Monument Creek
Regional Wastewater Treatment Facility, Cherokee Metropolitan District, Security Sanitation
District, Widefield Water and Sanitation District, Fountain Sanitation District, City of Pueblo,
Pueblo West Metropolitan District, Colorado Springs Utilities, an enterprise of the City of
Colorado Springs, a home rule city and municipal corporation, Lower Fountain Metropolitan
Sewage Disposal District, Tri Lakes WWTF, and Woodmen Hills Metropolitan District. The
Authority and the Participants may individually be referred to as a "party" and collectively as the
"parties."
This Agreement is made pursuant and subject to the Second Amended Establishing
Contract for El Paso County Water Authority and Name Change to Pikes Peak Regional Water
Authority ( "Establishing Contract "). It shall be effective upon execution by the Authority and
all Participants.
1. Project Area defined. The "watershed area" or "watershed" will include portions of the
Fountain Creek and Chico Creek watersheds as well as the Arkansas River from the Pueblo
Reservoir to the John Martin Reservoir where the Participants have discharges.
2. AF CURE Project defined. The "AF CURE Project" or "Project" includes all activities
authorized by the AF CURE Project Committee to address water quality matters of concern to
the Participants, including, but not limited to: coordinated monitoring, sampling, analysis and
reporting of discharges and stream water quality within and connected to the watershed, initially
focused on, but not limited to, compliance with Water Quality Control Commission Regulation
85; water quality data compilation and management; joint participation in activities of the Water
Quality Control Commission and Water Quality Control Division or water quality efforts;
participation in regulatory hearings; additional monitoring to develop site specific standards for
water quality parameters within the watershed; conducting water quality studies; joint financing
of water quality studies; sharing of news and information; and development of a web site to share
information; other matters determined by the AF CURE Project Committee to be of mutual
concern or interest to AF CURE.
3. Participants. Participants must be Members or Associates of the Authority, and may
become Associates of the Authority solely for the purpose of participating in the Project. The
Pikes Peak Area Council of Governments and Pueblo Area Council of Governments, who are not
a party to this agreement, may designate a non - voting observer to participate in meetings of the
AF CURE Project Committee.
PPRWA
AF CURE Project Participation Agreement
Page 2
4. AF CURE Project Committee. The AF CURE Project Committee shall consist of one
representative appointed by each Participant. Each Participant shall also appoint an alternate
representative. The Project Committee shall act as the board of directors for and govern the
affairs of the Project.
5. Delegation of Powers. The Project Committee shall have all the powers of the Authority
under the Establishing Contract with regard to the Project, and shall be subject to the
Establishing Contract, except as modified by this Agreement. In the case of any conflict
between this Agreement and the Establishing Contract, this Agreement shall control. Subject to
this Agreement, the Project Committee shall have all the powers with respect to the Project that
the Authority board of directors has with respect to the Authority.
6. Action by Project Committee. A majority of Project Committee directors shall constitute
a quorum for the transaction of Project business. The Project Committee shall act by motion or
resolution approved by a majority of Participants present, provided a quorum is present. The
Project Committee may allow members to participate in meetings by telephone or other
electronic means.
7. Addition of Participants. New Participants may be added with the approval of all
existing Participants. New Participants shall execute an addendum to this Agreement. The
Project Committee may prescribe terms and conditions for the addition of a new Participant,
which may include reimbursement of a reasonable share of expenses previously incurred and
assumption of a fair portion of the outstanding liabilities of the Project as determined by the
Project Committee. Such terms and conditions shall be included in the addendum executed by
the new Participant.
8. Only Participants Obligated. The Project Committee can obligate only those members of
the Authority which are Participants. Neither the Authority nor any members of the Authority
which are not Participants shall have any rights or liabilities with regard to the Project, nor shall
the Authority attempt to direct or control the Project.
9. Contributions and assessments. The Project Committee may assess each Participant for
its share of Project expenses and reserves as the Committee determines. Assessments for work
that benefits fewer than all Participants or that benefits Participants to different extents may
account for such differences, and need not be uniform.
10. Default and cure. A Participant shall continue to be eligible to participate in the Project
only if it regularly pays its assessments and other obligations when such assessments and other
obligations become due. A Participant is under no obligation to pay any particular assessment it
does not wish to pay, however, payment of all assessments shall be a condition of continued
participation in the Project. In the event any such assessment or other obligation is not paid
when due, that Participant shall be in default and shall not be entitled to participate further in the
Project, provided however, that said Participant shall have thirty (30) days after written notice
from the Project Committee in which to cure such default, but in no event shall it be relieved of
its obligation to make any payments for which it shall be legally responsible and which shall
remain due and payable. Continued participation, after default, by any such Participant in the
PPRWA
AF CURE Project Participation Agreement
Page 3
Project shall only be upon such terms and conditions as the Project Committee then deems
appropriate.
11. Amendment of this Agreement. This Agreement may be amended only by affirmative
vote of all the Participants.
12. Withdrawal of Participants. Any Participant may withdraw from the Project by giving
written notice thereof to the Project Committee at least thirty (30) days in advance. A
withdrawing Participant shall pay all of its assessments and obligations hereunder that have
accrued as of the effective date of its withdrawal; however, a withdrawing Participant's
responsibility for paying such accrued assessments and obligations shall survive withdrawal.
Failure to pay an assessment or other obligations and failure to cure default of the same within
the time limits provided in Article X of the Establishing Contract may be deemed intent of that
defaulting Participant to withdraw from the Project, or may be considered as grounds for
expulsion. A withdrawing or defaulting Participant shall have no right to refund of any
assessments paid prior to withdrawal or default.
13. Expulsion of Participants. A Participant may be expelled from a Project pursuant to
Article VI, section 3 of the Establishing Contract by two- thirds majority vote of all the other
Participants.
14. Dissolution and Winding Up of Project. The Project and this Agreement shall continue
in effect until dissolved by vote of a majority of the then - active Participants. Upon dissolution,
the assets of the Project shall be conveyed to the then - active Participants in proportion to the
contributions each has made to the Project.
15. Notices. Notices required by this Agreement shall be in writing, delivered by hand, by
first -class mail or by tracked delivery service (such as Federal Express) addressed to:
The Authority: Pikes Peak Regional Water Authority
2 North Cascade Avenue, Suite 1280
Colorado Springs, CO 80903
UMC: c/o Donala Water and Sanitation District
15850 Holbein Dr.
Colorado Springs, CO 80921
Cherokee: Cherokee Metropolitan District
6250 Palmer Park Blvd
Colorado Springs, CO 80915
Colorado Springs Colorado Springs Utilities, Environmental Services
Utilities: c/o Ginny Johnson
121 S. Tejon St.
P.O. Box 1103, Mail Code 940
Colorado Springs, CO 80947 -0940
PPRWA
AF CURE Project Participation Agreement
Page 4
Security: Security Sanitation District
231 Security Blvd
Colorado Springs, CO 80911
Fountain: Fountain Sanitation District
901 S Santa Fe Ave,
Fountain, CO 80817
Lower Fountain: Lower Fountain Metropolitan Sewage Disposal District
901 S Santa Fe Ave,
Fountain, CO 80817
Pueblo: City of Pueblo Water Reclamation Facility
1300 South Queens Ave
Pueblo, CO 81001
Pueblo West: Pueblo West Metropolitan District
109 East Industrial Boulevard
Pueblo West, CO 81007
Widefield: Widefield Water and Sanitation District
37 Widefield Blvd
Colorado Springs, CO 80911
Tri- Lakes: Tri -Lakes Wastewater Treatment Facility
c/o Monument Sanitation Districxt
130 2nd St, Monument, CO 80132
Monument, CO 80132
Woodmen Hills: Woodmen Hills Metropolitan District
8046 Eastonville Road,
Falcon, CO 80831.
16. No assignment. No party's rights or obligations under this Agreement shall be assigned
without the prior written consent of the other parties, and any attempted assignment without such
consent shall be void. Notwithstanding anything herein to the contrary, upon written notice to
the Project Committee and all other Participants, Colorado Springs Utilities (Utilities) may
assign this Agreement without consent to the City of Colorado Springs, Colorado.
17. Severability. If any provision of this Agreement is held void or unenforceable, such
provision shall be deemed stricken, and all remaining provisions shall continue in force.
18. Subject to Appropriations. In accord with the Colorado Constitution and/or the organic
laws of the respective governmental entities or enterprises of a governmental entity, that are
Participants, performance of such Participant's obligations under this Agreement is expressly
PPRWA
AF CURE Project Participation Agreement
Page 5
subject to appropriation of funds by the respective governing body of each such Participant .
Nothing herein shall constitute, nor be deemed to constitute, the creation of a debt or multi -year
fiscal obligation or an obligation of future appropriations by such Participants contrary to Article
X, § 20, Colorado Constitution, or any other constitutional, statutory, or charter limitation.
Notwithstanding any other provision of this Agreement, with respect to any financial obligation
of such Participants which may arise under this Agreement in any fiscal year after the year of
execution, in the event the budget or other means of appropriation for any such year fails to
provide funds in sufficient amounts to discharge such obligation, such Participants will have no
liability for compensation or damages to the other Parties in excess of the Participant's
authorized appropriation for this Agreement, and upon such failure (i) the Participant shall not be
entitled to participate further in the Project at such time as the then - existing and available
appropriations are depleted, and (ii) such failure shall not constitute a default or breach of this
Agreement, including any sub - agreement, exhibit, or amendment by the Participant. Continued
participation, after a failure to appropriate, by the Participant in the Project shall only be upon
such terms and conditions as the Project Committee then deems appropriate.
19. Counterparts. This Agreement may be executed in one or more counterparts, each of
which shall be considered an original, and all of which together shall constitute one agreement.
Facsimiles or copies of signatures shall be considered originals.
20. Entire agreement. This Agreement constitutes the entire agreement among the
parties. All prior negotiations, representations and agreements concerning the subject matter of
this Agreement are merged herein.
21. Governing law. This agreement shall be construed in accordance with the laws of the
State of Colorado except for its conflict of law provisions, and with regard to participation by a
specific Participant, that Participant's organic or authoritative law.
22. No third party beneficiaries. Except as provided in paragraph 3 with respect to the Pikes
Peak Area Council of Governments and Pueblo Area Council of Governments, this Agreement
shall not be deemed to create any third -party rights or beneficiaries. Without limiting the
generality of the foregoing, no rights or obligations are created in or toward Members of the
Authority which are not Participants.
23. Authority. Each party warrants that it has the authority to enter into this Agreement,
and that the person signing this Agreement on its behalf has the authority to bind it to this
Agreement.
PPRWA
AF CURE Project Participation Agreement
Page 6
PIKES PEAK REGIONAL AUTHORITY
Sean Chambers, President
Attest:
„da/1'Gti Date: ? , 2013.
Secretary ib P 4 e)
- ° My Commission Expires 03.10 2015 CHEROKEE METROPOLITAN DISTRICT
President
Attest: /
Date: /� , 2013.
Secretary /
UPPER MONUMENT CREEK REGIONAL WASTEWATER
TREATMENT FACILITY
Kip Petersen, Chairman
Operations Coordinating Committee
Date: , 2013.
Secretary
SECURITY SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
r
PPRWA
AF CURL: Project Participation Agreernent
Page 6
Sean Chat President
Attest:
Date: , 2013.
Secretary
CHEROKEE METROPCILI. AN f ,TR1CT
! St;
!4 Date: {? 20]3
UPPER It ONI J 1 ENT CREEK REGIONAL WASTEWATER
TREATMENT FACILITY
Kip Petersen, Chairman
Oetatiotts Coordinating Corntriittee
SECURITY SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
PPRWA
AF CURE Project Participation` Agreement
Page 6
PIKES PEAK REGIONAL WATER AUTHORITY
Sean Chambers, President
Attest:
Date: , 201.3.
Secretary
CIDEROKE METROPOLITAN ° DISTRICT
President
Attest
Date: , 2013.
Secretary
UPPER UME REGIONAL WASTEWATER
TREATMENT FACILITY
1 :.t,.
Kip Pe t ;"en, Chairman
Operations Coordinating Committee
. 1 / . .li.%1 /.. Date. zCP 2013.
SECURITY SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
PPRWA
AF CURE Project Participation Agreement
Page 6
PIKES PEAK REGIONAL WATER AUTHORITY
Sean Chambers, President
Attest:
Date: , 2013.
Secretary
CHEROKEE METROPOLITAN DISTRICT
President
Attest:
Date: , 2013
Secretary
UPPER MONUMENT CREEK REGIONAL WASTEWATER
TREATMENT FACILITY
Kip Petersen,. Chairman
Operations Coordinating Committee
SECURITCY SANITATION DISTRICT
Acting by and through its Activity Enterprise
President
Attest:
Date: cf 4 4 1e , 28 , 2013.
Assistant Secretary
PPRWA
AF CURE Project Participation Agreement
Page 7
o ; d; FOUNTAIN SANITATION DISTRICT
• ' `; I SEAL.
: (:1 )
President
Attest:
o olie
Date 10 , 2013.
CITY OF PUEBLO
President, City Council
Attest:
Date: , 2013,
City Clerk
PUEBLO WEST METROPOLITAN DISTRICT
President
Attest:
Date: , 2013;
Secretary
COLORADO SPRINGS UTILITIES
Gary Bostrom, Chief Water Services Officer
Attest:
Date: , 2013.
PPRWA
AF CURE Project Participation Agreement
Page 7
FOUNTAIN SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
CITY OF ' :.:.
1 111. 01 -
'resident, City Council
Attest:
Date: 9/9 , 2013.
Cit lerk
PUEBLO WEST METROPOLITAN DISTRICT
President
Attest:
Date: , 2013.
Secretary
COLORADO SPRINGS UTILITIES
Gary Bostrom, Chief Water Services Officer
Attest:
Date: , 2013.
,iffr
PPRWA
AF CURE Project Participation Agreement
Page 7
FOUNTAIN SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
CITY OF PUEBLO
President, City Council
Attest:
Date: , 2013.
City Clerk
PUEBLO WEST METROPOLITAN DISTRICT
cri0A11172, he-
President
• est: / fr a• /
Date: 7'0)3 —, 2013.
Secretary
COLORADO SPRINGS UTILITIES
Gary Bostrom, Chief Water Services Officer
Attest:
Date: , 2013.
Secretary
COLORADO SPRINGS UTILITIES
iti "4-
Gary Bo -4 f , Chief Water Services Officer
11.x►
Date
APPROVED AS TO FORM
City Attorney's Office — Utilities Division
City of Colorado Springs
4 114;11110,
4110
PPRWA
AF CURE Project Participation Agreement
Page 8
t .
mn"
• . � LOWER FOIJNTAIN METROPOLITAN SEWAGE
y. '•®. • ®' DISPOSAL DISTRICT
SEAL '
••...... President v
Attes.
..:... Date • ...) 4 11 , 2013.
of -
TRI -LAKES WASTEWATER TREATMENT FACILITY
By : Woodmoor Water and Sanitation District No. 1
President !-
Attest:
Date: , 2013.
Secretary
By :, Monument Sanitation District
President
Attest:
Date: , 2013.
Secretary
•
PPRWA
AF CURE. Project Participation Agreement
Page 8
Tim - L-A ictt c�qs b -iA - . _ . TI►+�,4r Fi j " °'
C.300DMoog. Ga4i & !L 4SANs}'/4Tiot4
b iLTjgiCF - mo.
Pre
Attest:
att ic
_ .
/ ( p G Date 2013
Secretary
TRI -LAKES WASTEWATER TREATMENT F ILITY
- , - ,
Pres
Attest:
Date: , 2013.
Secretary
By: Monument Sanitation District
President
Attest:
Date: , 2013.
Secretary
PPRWA
AF CURE Project Participation Agreement
Page 9
By: Palmer Lake S S. ' • 4 l e • istrict,
A i
#‘ f, 5 v ;/
President
Attest:
.� - -, ' 44; % Date: "-"` , 2013.
Secretary
WIDEFIELD WATER AND SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
WOODMEN HILLS METROPOLITAN DISTRICT
President
Attest:
Date: , 2013.
Secretary
PPRWA
AF CURE Project Participation Agreement -
Page 9
WIDEFIE 0 1 ER AND SANITATION DISTRICT
Attest: L
Date: .a.3 , 2013.
Secretary
WOODMEN IIIIiLS METROPOLITAN DISTRICT
President
Attest:
Secretary ':
Date: , 2013.
•
PPRWA
AF CURE Project Participation Agreement
Page 9
By: Palmer Lake Sanitation District
President
Attest:
Date: , 2013.
Secretary
WIDEFIELD WATER AND SANITATION DISTRICT
President
Attest:
Date: , 2013.
Secretary
WOODMEN HILLS METROPOLITAN DISTRICT
President
Attes �
a6:2013.
Secretary /