HomeMy WebLinkAbout12755
RESOLUTION NO. 12755
A RESOLUTION ESTABLISHING FEES FOR CONTRACTOR’S
LICENSES, REGISTRATIONS, PERMITS AND INSPECTIONS
AND RELATED SERVICES.
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO that:
(Brackets indicate matter being deleted, underscoring indicates matter being added)
SECTION 1:
Fees required to be paid pursuant to Title IV of the Pueblo Municipal Code in
connection with any license, registration, examination, license application, plan review,
building permit, plumbing permit, mechanical permit, electrical permit, inspection or
reinspection, or otherwise required to be paid pursuant to said Title or any code adopted
therein by reference, shall be determined and paid in accordance with the following
schedule, and are subject to the additional conditions, if any, specified herein:
A. Annual Contractor License (or Registration Fees):
1. Building “A” Contractor License $[175.00] 310.00
2. Building “B” Contractor License [150.00] 260.00
3. Building “C” Contractor License [125.00] 220.00
4. Building “D” Contractor -- Single Trade License [75.00] 130.00
5. Building “D” Contractor -- Wrecking License [150.00] 260.00
6. Building “D” Contractor-- Moving License [125.00] 220.00
7. Plumbing Processing Fee For Registration [75.00] 130.00
8. Plumbing Utility Contractor (Sewer & Water [75.00] 130.00
Service Lines or Fire Mains) each
9. Water Connected Appliance [75.00] 130.00
10. Mechanical “A” Contractor [150.00] 260.00
11. Mechanical “C” Contractor (Gas Fitter or Sheet [75.00] 130.00
Metal or Refrigeration) each
12. Electrical Registration No Fee
B. Annual Craftsmen License/Registration Fees:
1. Mechanical Master License $[75.00] 130.00
2. Stationary Engineer Registration [75.00] 130.00
3. Journeyman Gas Fitter Registration or License [25.00] 40.00
4. Journeyman Sheet Metal Worker License [25.00] 40.00
5. Journeyman Refrigeration License [25.00] 40.00
6. Mechanical Apprentice Registration [25.00] 40.00
C. Examination Fees:
1. Building “A” & “B” Contractor $[50.00] 100.00
2. Building “C” Contractor [35.00] 70.00
3. Building ‘D” (Per Exam) [25.00] 50.00
4. Mechanical Contractor (Per Exam) [35.00] 50.00
[Craftsman Examinations (Per Exam) 25.00
5.
6. Plumbing Utility Contractors 25.00
7. Water Connected Appliances ]
25.00
[
D. Multiple Licenses:
For those contractors possessing multiple licenses, the total fee shall be
equal to the sum of the highest license fee, as set forth above, plus 65% of the
]
specified fee for each of the other licenses, rounded to the next highest $5.00.
[E] D. Renewal License and Registration Fees:
1. All licenses and registrations shall become delinquent on
December 31 of the year issued and shall be renewed annually upon application
and payment of the required license or registration fee; subject, however, to the
following limitations: the fee for any license or registration renewed after January
31 but on or before March 31 shall be one and one-half times the annual fee for
such license; the fee for any license or registration renewed after March 31 but
on or before May 31 shall be twice the annual license or registration fee for such
license or registration. All required insurance coverage certificates shall be filed
and approved before a license or registration is renewed. Any license or
registration not renewed before May 31 of the year following its issuance shall
thereupon expire and may not be renewed without examination, if examination
was required upon issuance of the initial license.
2. No permit shall be issued to any unlicensed or non-registered
person engaged in the construction business, or to any licensed or registered
person who is delinquent in payment of his or her annual license or registration
fee, or who has failed to comply with a provisional order, or whose license or
registration is suspended or revoked, or who is in any manner indebted to the
Department, or whose insurance has then expired.
[F] E. License Application Fees:
1. An application fee of $35.00 is required to be paid at the time the
license application is submitted to the Pueblo Regional Building Department for
review and acceptance. Upon review of the application, the applicant will be
notified that either (a) the application cannot be accepted together with a
statement of the reasons it cannot be accepted or, if additional information is
required, identification of the necessary additional information, or (b) that the
application has been accepted and the date or dates upon which examination for
the license will be held.
[G] F. Plan Review Fees:
Plan review fees shall be charged as follows:
1. New one and two family dwellings 10% of the building
permit fee
2. All other building and additions and 50% of the building
alterations to existing buildings permit fee
3. Additional plan review required by changes,
additions or revisions to approved plan $30.00 per hour
Review of plans by the Department is merely a code compliance review
and not a structural or suitability review. Such review shall not relieve the
designer, architect, engineer or contractor of responsibility for the structural
integrity of the contemplated work or from compliance with all provision of all
applicable codes.
[H] G. Building Permit Fees:
1. General
a. Permits are issued only for work that is described or shown
on approved plans or specifications.
b. Permits may not be issued until all required approvals have
been received from other governing agencies.
c. Permit fees for all construction projects are based on total
contract value, including but not limited to all building structure work,
electrical, mechanical, and plumbing systems, and sprinkler work, finish
work, overhead, material, labor and profit.
[
d. The contractor will provide the Department with a listing of
]
all subcontractors it will employ in connection with the work.
Subcontractors will be required to obtain a no-fee permit for their portion of
the work.
[e] d. If a contractor or subcontractor is changed from that
indicated in the initial list provided before beginning the job, the Building
Department shall be notified. If during the course of the job a contractor or
subcontractor in which a permit has been issued to is changed, the new
contractor or subcontractor will be required to obtain a minimum fee permit
of $[30] 60.00
[f] e. The Department may require the Contractor to file with the
Department copies of its contracts with the owner of the work, and with
any one or more subcontractors employed in the work.
[g] f. A minimum fee of $30.00 shall be charged for all permits. If a
permit is cancelled before any work is done, fees will be refunded except
for an administrative service charge of $15.00
2. Residential
a. Permit fees for alterations and remodeling shall be based on
the contract value. Permit fees are derived from Table B below.
b. The permit fees for all new construction and for additions to
existing structures shall be calculated based upon the Total Valuation of
the work in accordance with Table B below. The Total Valuation of the
work shall be the aggregate of the value of all classifications of
improvements based upon the square footage of the improvements and
calculated in accordance with Table A below.
3. Manufactured Structures
a. Permit fees for all manufactured structures shall be
calculated based upon the total valuation of the work in accordance with
Table C. The total valuation of the work shall be the aggregate of the
valuation of all classification of improvement based upon the square
footage of the improvements and calculated in accordance with Table B.
b. Certificates of Occupancy for manufactured structures may
be obtained from the State of Colorado Division of Housing.
4. Commercial Structures:
Permit fees shall be calculated based upon total contract valuation
in accordance with Table B.
5. Sign, Moving and Wrecking permits:
Permit fees shall be calculated based upon total contract valuation
in accordance with Table B.
TABLE A
I. New Residences and Additions Thereto:
a. All Finished Living area $73.93 Per square foot
b. Basement, unfinished 12.50 Per square foot
c. Finish existing basement 19.50 Per square foot
d. Finished garden level or basement
level 32.00 Per square foot
II. Manufactured/Modular Residence
a. Sitting of Manufactured Home $45.00 Per square foot
b. Finished Basement 32.00 Per square foot
c. Unfinished Basement 12.50 Per square foot
III. Garage and Accessory Structures:
a. Detached garage $24.00 Per square foot
b. Attached garage 22.00 Per square foot
c. Carports - open on two or more sides 15.00 Per square foot
d. Open patios or porches with roof 11.00 Per square foot
e. Enclosed patio 25.00 Per square foot
f. Deck 10.00 Per square foot
g. Deck with roof 20.00 Per square foot
TABLE B
All permits valuations shall be adjusted annually by a modifier of 5% for 2015 and 2016.
TOTAL VALUATION PERMIT FEE
$1.00 to $500.00 $30.00
$501 to $2,000 $30.00 for the first $500.00 plus $2.00
for each additional $100.00 or fraction
thereof, to and including $2,000.
$2,001 to $25,000 $60.00 for the first $2,000 plus $9.00 for
each additional $1,000.00 or fraction
thereof, to and including $25,000.
$25,001 to $50,000 $267.00 for the first $25,000 plus $6.50
for each additional $1,000.00 or fraction
thereof, to and including $50,000.
$50,001 to $100,000 $429.50 for the first $50,000 plus $4.50
for each additional $1,000.00 or fraction
thereof, to and including $100,000.
$100,001 to $500,000 $654.50 for the first $100,000.00 plus
$3.50 for each additional $1,000.00 of
fraction thereof, to and including
$500,000.
$500,001 to $1,000,000 $2,054.50 for the first $500,000.00 plus
$3.00 for each additional $1,000.00 or
including $1,000,000
$1,000,001 AND UP $3,554.50 for the first $1,000,000.00
plus $2.00 for each additional $1,000.00
or fractions thereof.
TABLE C
I. Residential Plumbing Only Permits
All permits valuations shall be adjusted annually by a modifier of 5% for 2015 and 2016.
a. Sewer Connection $50.00 Each
b. Water Connection 40.00 Each
c. Lawn Sprinkler System 55.00 Each
II. Residential Mechanical Only Permits
a. Water Heater Replacement $40.00 Each
b. Furnace Replacement 65.00 Each
c. Furnace/AC Replacement 80.00 Each
d. Gas Air Test 40.00 Each
III. Residential Electrical Only Permits:
a. Upgrade/Replace Service $50.00 Each
b. Solar PV Systems 290.00 Each
c. A/C Hook up 40.00 Each
[I] H. Plumbing Permit Fees:
Plumbing permit fees shall be as follows:
On a project that is exclusively limited to plumbing work and
does not otherwise require a building permit, the plumbing
contractor shall obtain a plumbing permit and the fees shall be
based on Table C for residential work listed. All other plumbing
permit fees shall be based on contract value and calculated in
accordance with the building permit fee schedule of Table B.
[J] I. Mechanical Permit Fees
Mechanical permit fees shall be as follows:
On a project that is exclusively limited to mechanical work
and does not otherwise require a building permit, the mechanical
contractor shall obtain a mechanical permit and the fees shall be
based on Table C for residential work listed. All other mechanical
permit fees shall be based on contract value and calculated in
accordance with the building permit fee schedule of Table B.
[K] J. Electrical Permit Fees:
Electrical permit fees shall be as follows:
On a project that is exclusively limited to electrical work and
does not otherwise require a building permit, the electrical
contractor shall obtain an electrical permit and the fees shall be
shall be based on Table C for residential work listed. All other
electrical permit fees shall be based on contract value and
calculated in accordance with the building permit fee schedule of
Table B.
[L] K. Miscellaneous Fees - 1, 2, and 4 shall be adjusted for the years of
2015 and 2016 by 5%.
1. For buildings required to be inspected for regulated use
licensing, including but not limited to use for cabarets, hotels, motels,
foster care, nursing homes or similar buildings, an inspection fee of
$100.00 shall be paid.
2. Inspections conducted outside of normal office hours at the
request of a permittee shall require payment of additional inspection fees
of $[55.00] 75.00 per hour for inspectors’ time reasonably required in
inspection for the work and travel to and from the site of the work, with a
minimum fee based upon 2 hours per inspector.
3. Reinspection fee shall be $[35.00] 100.00.
4. There shall be no additional fee for issuance of the final
Certificate of Occupancy. Partial, temporary or preliminary occupancy
certificates shall be charged an additional fee as follows:
Residential Properties -- $10.00 per living unit up to 4 units
All other structures -- $25.00 per certificate.
5. Elevator inspection fees shall be $175.00.
[M] L. Appeal fee shall be $100.00 per appeal.
[N] M. Building Codes Applicable to City Buildings
Table B and Table C along with Miscellaneous Fees numbers 1, 2, and 4 shall be
adjusted for the years of 2015 and 2016 by 5% unless the City Council and County
Commissioners find that such increases are not required based on economic factors.
All codes referred to herein shall be applicable to buildings owned
or occupied by the City of Pueblo, its departments, divisions and agencies.
The City shall comply with the provisions of such codes including
obtaining permits for all work performed and payment of permit fees.
SECTION 2:
Resolution Nos. 8340, 8742 9199, 10300, 11952 and any other fee resolutions
are hereby rescinded and superseded by this Resolution.
SECTION 3:
The officers and staff of the City are directed and authorized to perform any and
all acts consistent with the intent of the Resolution to effectuate the policies and
procedures described herein.
SECTION 4:
This Resolution shall become effective November 1, 2013.
INTRODUCED: August 12, 2013
BY: Chris Nicoll
Background Paper for Proposed
R
ESOLUTION
DATE:AGENDA ITEM # Q-1
August 12, 2013
PUEBLO REGIONAL BUILDING DEPARTMENT
DEPARTMENT:
DAVID VAUGHN, BUILDING OFFICIAL
TITLE
A RESOLUTION ESTABLISHING FEES FOR CONTRACTOR’S LICENSES,
REGISTRATIONS, PERMITS AND INSPECTIONS AND RELATED SERVICES
ISSUE
Should City Council adopt a Fee Resolution for the Pueblo Regional Building Department,
increasing licensing fees by 75%, increasing elevator inspections from $140.00 to $175.00, and
allowing a maximum of a 5% increase of fees for 2015 and 2016 if reserves go below the
$2,000,000 as set by the PRBD Commission?
RECOMMENDATION
The Pueblo Regional Building Commission Recommends Approval of the Resolution.
BACKGROUND
The Pueblo Regional Building Commission is recommending adoption of a Fee Resolution
establishing fees for Contractor’s licenses, registration, permits and inspections and related
services in order to comply with Pueblo Regional Building Department Resolution #10-04
designation of a fund reserve for the Pueblo Regional Building Commission of $2,000,000
adopted and approved by the Commission on May 29, 2010.
FINANCIAL IMPACT
Increase Fees for Contractor’s Licenses, Registration, Permits and Inspections and Related
Services, the department will gradually be using less reserves.
2013 2014 2015 2016
Budgeted Estimated Estimated Estimated
Income $1,492,037.00 $1,686,737.00 $1,839,037.00 $1,987,037.00
Expenses $1,713,546.00 $1,787,891.00 $1,850,215.00 $1,928,625.00
Operating
Income ($ 221,509.00) ($ 101,154.00) ($ 11,178.00) ($ 21,588.00)
Funded from
Reserves $ 221,509.00 $ 101,154.00 $ 11,178.00 $ 21,588.00