HomeMy WebLinkAbout08612Substituted Copy
July 17, 2013
ORDINANCE NO. 8612
AN ORDINANCE ESTABLISHING CAPITAL PROJECT NO.
ED1302 - GREENHORN DRIVE EXTENSION AND
TRANSFERRING $1,200,000 FROM THE 1992-2016 SALES
AND USE TAX CAPITAL IMPROVEMENT PROJECTS FUND
INTO PROJECT ACCOUNT NO. ED1302
WHEREAS, Greenhorn Drive is the primary transportation corridor needed to serve the
proposed St. Charles Industrial Park; and
WHEREAS, Greenhorn Drive needs to be designed, and constructed; NOW,
THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
Capital Project No. ED1302 - Greenhorn Drive Extension is hereby established.
SECTION 2.
Funds in the amount of $1,200,000 are hereby transferred from the 1992-2016 Sales
and Use Tax Capital Improvement Projects Fund (the “Fund”) into Capital Project No. ED1302.
SECTION 3.
Funds encumbered by Resolution No. 11681 for the EDA grant match will be
unencumbered and Project ED0904 – Greenhorn Drive Road Design will be closed and any
funds appropriated therefor shall be transferred to reserves.
SECTION 4.
City Council finds and determines that the expenditure of a portion of the Fund for the
design of Greenhorn Drive is needed to serve the proposed St. Charles Industrial Park and will
further the location of job creating capital improvement project within the city and is within the
intent and purpose of Ordinance No. 8509 establishing criteria, standards, rules, and regulations
for the appropriation and expenditure of monies on deposit in the Fund.
INTRODUCED: June 24, 2013
BY: Chris Kaufman
PASSED AND APPROVED: July 22, 2013
Substituted Copy
July 17, 2013
Background Paper for Proposed
ORDINANCE
AGENDA ITEM # R-1
DATE: JUNE 24, 2013
DEPARTMENT:
PUBLIC WORKS
DIRECTOR – EARL WILKINSON, P.E.
TITLE
AN ORDINANCE ESTABLISHING CAPITAL PROJECT NO. ED1302 - GREENHORN DRIVE
EXTENSION AND TRANSFERRING $1,200,000 FROM THE 1992-2016 SALES AND USE
TAX CAPITAL IMPROVEMENT PROJECTS FUND INTO PROJECT ACCOUNT NO. ED1302
ISSUE
Should City Council authorize the use of the 1992-2016 Sales and Use Tax Capital
Improvement Projects Fund in the amount of $1,200,000 and establish a new capital project to
construct an extension of Greenhorn Drive?
RECOMMENDATION
Approval of this Ordinance.
BACKGROUND
On August 24, 2009, City Council approved Resolution No. 11681, authorizing the transfer of
$2,500,000 from the 1992-2011 Sales and Use Tax Capital Improvement Projects Fund to be
used as matching funds for a grant request to the U.S. Department of Commerce, Economic
Development Administration (EDA) to fund the construction of the St. Charles Industrial Park
Greenhorn Drive Extension Project. The proposed project would have extended Greenhorn
Drive from its terminus to Lime Road. On October 13, 2009 City Council approved Ordinance
No. 8090, establishing Capital Project No. ED0904 – FY 2009 Greenhorn Drive and Unnamed
Roadway and Pavement Design and approving the transfer of $175,000 from the 1992-2011
Sales and Use Tax Capital Improvement Projects Fund into ED0904 for engineering services to
design and construct the roadway. The EDA grant was not awarded to the City and the
roadway extension / construction was not done.
This project will extend Greenhorn Drive from its present terminus, recently constructed for
access to the Federal Express site, to the southern limits of the Minnequa Industrial Park Third
Filing. It will include that portion of Greenhorn Drive adjacent to the new Pewag Chain
Manufacturing site including the driveways into the site. It will terminate at the Third Filing
subdivision boundary with a temporary cul-de-sac and will not be extended to Lime Road. A
Location and Vicinity Map are attached as an exhibit to this ordinance.
This project will provide the geotechnical testing, pavement design and construction of the
Greenhorn Drive Extension. Preparation of contract documents, contract administration and
construction engineering services will be provided by the Public Works Department.
FINANCIAL IMPACT
Project ED0904 -Greenhorn Drive Road Design will be closed and any funds appropriated
therefor shall be transferred to reserves. Project ED0904 currently has a remaining balance of
$2,668,747.88.
Funds for this project will be transferred from the 1992-2016 Sales and Use Tax Capital
Improvement Projects Fund to ED1302 – Greenhorn Drive Extension.
• p 1
1
..
E w:
......• m 1111 1 .....
I ` 1111'11�111111��M1
. . - -- ■■ ■� i� 11�111ON41�11 1
4 fx; p
P ... i t ,
1,,,,........--,-......„, ,.. ,,,, ' �:L— _�11:11111111'i1111 /) ., ,..........„,
\ ,,„,..„.„..:,„,,- ...,. 7
1 . . ' 'a: I C i ' I Cli a (I i 1 1 = ===
no mom Iamb;
i WOW , j i l E 4P // '''' ii
7 --. :147:■0110 --.,,, :-.
, . wnwtrirc -,,
1
\)
, ‘ TE, , „ ..,,.„
14 ;,' I 14
N
SITE '��
/ 1 TSCALE
L
, ,,t;',..,,,,1,:1117.,,I.:4:4:Hil74** / , / i ize,„_ .. .,,
�r
1
VICINITY MAP ' ...
r ._.//,
D 1 .;
J
-1r FIL 2
� �
NOT TO SC ALE :
,,,i iki so 1 i /
7i b o
ii w ✓'•': FIL 3
i /
r =
/ i
//
II i il 1 _______----
TEMPORARY CUL—DE—SAC „ p
/ \
/ i
. , \ ■
LOCATION MAP
-- ( i