Loading...
HomeMy WebLinkAbout12704RESOLUTION NO. 12704 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $115,734.84 TO PARKER EXCAVATING, INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 719 MOFFAT STREET AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2013-2014 multi-year point repair contract; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. This contract is for repair of the sanitary sewer main at 719 Moffat Street. Contract Agreement for Sanitary Sewer Repair with Parker Excavating, Inc., Project No. 13-012 (WWAN03) is hereby awarded to said bidder in the amount of $115,734.84. SECTION 2. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. Funds for Project No. 13-012 (WWAN03) shall be from the Sewer User Fund. INTRODUCED: June 24, 2013 BY: Chris Kaufman Background Paper for Proposed RESOLUTION DATE: June 24, 2013 AGENDA ITEM # M-2 DEPARTMENT: WASTEWATER DEPARTMENT GENE MICHAEL, DIRECTOR TITLE A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $115,734.84 TO PARKER EXCAVATING, INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 719 MOFFAT STREET AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME ISSUE Should the City Council award a construction contract in the amount of $115,734.84 to Parker Excavating, Inc., for emergency sanitary sewer repair at 719 Moffat Street? RECOMMENDATION Approve this Resolution. BACKGROUND A sanitary sewer overflow occurred at 719 Moffat Street on Sunday, March 3, 2013. Wastewater percolated up through the ground, indicating a loss of pipeline integrity. This site has caused problems in the past. Because of its proximity to the river, this job had a high level of liability. A 12-inch sanitary main, two 60-inch, and one 48-inch manhole was removed and replaced. Flow was high in the sewer main, and required significant bypass pumping. It was decided that since the bypass pump was in the vicinity, two lines would be connected to eliminate a sanitary main crossing under I-25. Two manholes, near Ace Enterprises at 751 South Santa Fe Avenue, were removed and replace to connect a 15- inch sanitary line. The flow in this main was also high and required considerable bypass pumping. The elimination of the line under the interstate also eliminated any costly repairs due to the high traffic volume on I-25. Two of the manholes in this project were in the Colorado Department of Transportation's right of way. CDOT required additional seeding and rip rap as restoration. This work was performed under the Sanitary Sewer Point Repair multi-year contract under which nine (9) contractors were qualified via competitive bid. During the project the costs were modified by actual field quantities as noted on the attached change order. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Remove & Replace 8-inch PVC < 12-feet $29,280.00 Remove & Replace 48-inch Dia. Manhole $5,900.00 Reinstate Services $800.00 Traffic Control $5,060.00 Drop Manhole $1,800.00 Difference Between 8-inch and 12-inch $2,823.10 Difference Between 8-inch and 15-inch $1,481.70 Remove & Replace 60-inch Dia. Manhole $17,700.00 Dewatering $2,400.00 Stabilization Material $1,122.30 Bypass Pumping $25,366.57 Additional Depth $1,456.00 Additional Service for Ace Enterprises $2,172.00 Mobilization $1,600.00 Subtotal: $98,961.67 (86%) Surface Improvement-related Remove & Replace Chain Link Fence $1,600.00 Rip Rap $415.08 Millings $890.50 Seeding $2,650.00 Remove & Replace Standard C&G $450.00 Asphalt Patch CDOT Spec $2,027.52 Flow Fill Material $8,740.07 Subtotal: $16,773.17 (14%) TOTAL: $115,734.84 FINANCIAL IMPACT Funding for this project will come from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding is available and has been appropriated and allocated to Project No. 13-012 (WWAN03). CONTRACT CHANGE ORDER CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS Project Number : 13 -012 Change Order No. : ONE 5/28/2013 Page 1 of 1 Project Name : 719 Moffat Street Contractor : Parker Excavating, Inc. You are hereby requested to comply with the following changes from the plans & specifications: Bid Item Description of Changes Decrease Increase No. Contract By Contract By 1 Remove & Replace 8" PVC Pipe <12' $6,405.00 2 Aspahlt Patch - 4" on 6" Class 6 ABC ($1,440.00) 3 R &R Standard C &G ($150.00) 4 R &R 48" Manhole ($2,950.00) 5 Reinstate Service $200.00 6 Mobilization $800.00 7 Difference Between 8" and 12" $2,823.10 8 Difference Between 8" and 15" $1,481.70 9 R &R 60" Dia. Manhole $17,700.00 10 R &R Chain Link Fence $1,600.00 11 Dewatering $2,400.00 12 Stabilization Material $1,122.30 13 Rip Rap at Request of CDOT $415.08 14 Millings $890.50 15 Seeding $2,650.00 16 Bypass Pumping $25,366.57 17 Drop Manhole $1,800.00 18 Asphalt Patch Asphalt Spec $2,027.52 19 Flowfill Material $8,740.07 20 Traffic Control $5,060.00 21 Additional Depth of Pipe $1,456.00 22 Additional Service for Ace Enterprises $2,172.00 TOTAL (Decrease) / Increase 1 ($4,540.00) $85,109.84 Net Adjustment This Change Order $ 80,569.84 Amount of Previous Change Order(s) $ 0.00 Original Contract Amount $ 35,165.00 Total Adjusted Contract Amount To Date $ 115,734.84 Reason For Change: Actual Field Quantities. Extra work needed to complete project. The time provided for completion of the contract is unchanged t by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: Date: Associate Engineer 11 Reviewed by: Date: Wastewater Engineering Supervisor Accepted by: Date: Contractor's Representative If this Change Order causes an increase from the original contract price, signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: Date: Director of Wastewater 0 0 0 0 o ti o 0 o 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 N 0 . . 0 p p CD 0 p . N o O W f A O f A f 9 O W N f 9 f 9 O M 0 f A M O K N N CO V 0 0) a 9 = 9 9 N t o l0 9 9 49 U 1- I- 0 o 0 0 00 CD CO 0 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o@f p . p . p . . p . p . p . N 0 f9 0 1A 0 !9 09 0 f9 fA o O 0 0� s 0�'9 f9 fA '3 Cr: 0 M 0f9 of 0 0 0 0 0. a M `9 .- 5 m 2 9 w /9 w CLF CL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 . . Swoa 8 0 0 0 0 a C N 699 69 0 E 0- 69 0 F- t Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0, 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 m c yy 0 00 p O p o p U 0 9 f96A ° f9 V!� ° K OfA Q ° o f91flw f9M wf91A O 0919 c i! 0 _O N f rn O a i9 � 69 !9 0 U $ 812 0 0) O 0 0 0 o 0 0 o 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 o 0 0 O 0 0 0 p C) I 08 w 0 9 0 f9 r, www V 6. 0 f9 0 f9 0 . ., !9 0 !9 0 9 s 0 0 09 0 00 0 0 > Y 1� C 9 19 LLD 9 9 0 d ▪ I- 0 a 0 • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO 0 0 o 0 0 0 0 0 0 0 p 0 p o o 0 c p p o p O pp pp 2 - 69 w 0 t9 0 9 0 9 X 1A 0 Vi w Q ° o fA Vi Vi 0 9 0 9 Ui lA 9 $ 09 69 00 o t N C a M N9 .- WI 4 9 o y 9 . /A U , mF- 0 a O o 0 0 0 0 0 0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ca 0 0 0 0 0 0 N g s4 4 6 O .9° 0 9 -'9 0 9 w �$ ° 9 0 9 0 0 9 ° 88 S el W a M w '_ w !90 N ii 9 9 9 b o 0 1- J yy CD • CD CS p o p p o 0 0 p 0 0 p 0 0 0 0 p 0 0 0 p 0 0 p 0 p p 0 0 0 p 0 0 0 0 0 0 ui 0 8 69 f9 09 N. 69 f9 0 0 M 69 0 9699/969 9/9 N 0 919 0 0 0 4 un C y a N z; � w V TO 64 I N o cc Y O o 0 0 0 0 0 0 0 o N o 0 0 0 0 0 0 0 0 0 0 0 0 0 CO 0 N 5 0 0 0 o p pp r p . 0 p 0 p pp 0 0 p q i0 9/A 1990. 91A /A� 0 9196A t N HIA 0 0) , O >'C ' 9 9 • � a N 69 49 8 0) w2? 9 9 0 ai r a ~ U Z` 0000 41 00000 N 0O el r cv C t+1 0 W ca 0 O 0 1- cli tn LLLL LLLL LL LL LLLL LL U- LL U. _J V) LL U. LL LL U. U. c 0 5 E E y J J J J -) J J J J J J J V) V7 N In N U) J -4 J ,0 t0 >> LL W J N E6 0. C . N S S g 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C N 7 N 7 O N r 7.. N 7 O N 7 O_ N r_ N 7 O N'7 O ,- .- e - L L m` n N N A' N N A' N A^ N n A N N .- . a) • o o o U V m to m 0 8 co N O C c> C d V a A . D c . v c V= c 00 c. o e. nC 2 a y ,. oC r ° m y , m o Cm E U 0 0 O o Q O. a O C O C c> y ^ E � p 8 E N N co to y E, v E 1 d A m o an d E0-E c°'i n y -a c ✓ v 0 �aa� a -alas a° tY 2 � ` ct &n.e)c2EE2 2 I m a a d 13 - 6 N a S a i v Z E - c l0 _m M 0) d .-- N co 4 t() c0 r 0 0) O o m Q N ca a. m EMERGENCY POINT REPAIR AT 719 MOFFAT STREET t i1 rs, + i �: ti l +tom` � / / " ' • l „„ � w 1 - V� r , p :".• « r 4 Ja r wx t# Q '4 i � ' - • . : , N ' 4 4"n , Locust St • i t 1� ",. ....;. s t . - '. 4.11/4 IIIII fi ' -t s } • „. ,. SIT E .p� REHAB ,. �* 3 v.:?:: , r i..' 3 7. . , ,,,,„':::4,:::::i'-'611`,:7N'"‘:, • 1 t o " ` t yl Z . , . , ..,. , .• . . .... ,...,.. s -. 1 u. 'e S ,oF � � ,t Lansing St .,. y ,.... . , ,_ ' 0 i le/7 ' ' ' ' ' '.. �� Q Q ` 1( c 11 � � ' D ) f $ /w1'�wa fie, k V { f �_ t e. � A' f 11f yµ. } ' *gr d � "I s, At � �C - Tom` y $' - d , '4 yhar 4 , Ar '. * t ♦ , to y{, /� i ���� I, . 4u- VIP, ,4 " - rte. � ' ` ry , t 7 ° o r .y se 3rq t. y