RESOLUTION NO. 12607
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT
IN THE AMOUNT OF $147,913.26 TO K.R. SWERDFEGER
CONSTRUCTION, INC., FOR EMERGENCY SANITARY SEWER
POINT REPAIR IN THE ALLEY BETWEEN CARTERET AVENUE
AND LAKE AVENUE OFF OF SUMMIT AVENUE, AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to K.R. Swerdfeger Construction, Inc.,
under the 2011-2012 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer main in the alley between Carteret
Avenue and Lake Avenue off of Summit Avenue. Contract Agreement for Sanitary Sewer
Repair with K.R. Swerdfeger Construction, Inc., Project No. 11-012 (WWAN03) is hereby
awarded to said bidder in the amount of $147,913.26.
SECTION 2.
The Stormwater Fund will reimburse the Wastewater Fund in the amount of $24,715.00.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
Funds for Project No. 11-012 (WWAN03) shall be from the Sewer User Fund.
INTRODUCED: March 11, 2013
BY: Chris Nicoll
Background Paper for Proposed
RESOLUTION
DATE: March 11, 2013 AGENDA ITEM # M-2
DEPARTMENT: WASTEWATER DEPARTMENT
GENE MICHAEL, DIRECTOR
TITLE
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$147,913.26 TO K.R. SWERDFEGER, INC., FOR EMERGENCY SANITARY SEWER POINT
REPAIR IN THE ALLEY BETWEEN CARTERET AVENUE AND LAKE AVENUE OFF OF
SUMMIT AVENUE, AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
ISSUE
Should the City Council award a construction contract in the amount of $147,913.26 to K.R.
Swerdfeger, Inc., for emergency sanitary sewer repair in the alley between Carteret Avenue and
Lake Avenue off of Summit Avenue?
RECOMMENDATION
Approve this Resolution.
BACKGROUND
On August 24, 2012, a Wastewater Department Collection crew was investigating a sanitary
sewer main that may have caused a sewage backup at 5 Small Avenue. The cleaning head
and hose became stuck in the sewer main and an emergency point repair was required to
remove the cleaning head and hose to avoid another backup. The sewer main is laid in the
alley between Carteret Avenue and Lake Avenue, from a point just north of Summit Avenue to
the main in Small Avenue, and runs under the Bessemer Ditch. The entire main in the alley was
in poor condition and needed to be repaired. An attempt to bore under the Bessemer Ditch
was unsuccessful due to large cobble stones which would not allow the bore to stay on grade to
create gravity flow. The sewer main in the alley had to be rerouted to Summit Avenue. A storm
sewer inlet had been improperly connected to the sanitary main in the alley and a new storm
sewer main needed to be constructed. The alley was very narrow and the contractor had to
replace several drinking water services. The constrained conditions in the alley increased the
cost of the project.
The quote for the unit prices for the work by K.R. Swerdfeger Construction, Inc., and the change
order for the project are attached. This work was performed under the Sanitary Sewer Point
Repair multi-year contract under which eight contractors were qualified via competitive bid.
During the project the costs were modified by actual field quantities as noted on the attached
change order.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Remove & Replace 8" PVC, <12' .......................... $25,100.00
Reinstate Services .................................................. $7,000.00
Remove & Replace 48" Manhole ............................. $4,000.00
Mobilization ............................................................. $3,600.00
Remove TV Camera ................................................ $7,184.80
Services on Small ................................................... $8,000.00
Slowed Production ................................................ $17,118.01
Additional Depth .......................................................... $535.00
Potholing Services ................................................... $4,640.22
Failed Bore ............................................................. $6,272.83
Bore Only ................................................................ $9,000.00
Traffic Control ......................................................... $5,175.00
Water Services......................................................... $5,000.00
Subtotal: ............... $102,625.86 (69%)
Storm Sewer Replacement-related
Storm Inlet .............................................................. $3,500.00
Storm Manhole ........................................................ $4,000.00
Storm Sewer .......................................................... $17,215.00
Subtotal: .......................... $24,715.00 (17%)
Surface Improvement-related
Remove & Replace 6" Concrete ................................. $768.00
Remove & Replace Stand. C&G ................................ $800.00
Regrade Alley .......................................................... $5,600.00
Asphalt Patch, 4" Asph. on 6" ABC ......................... $6,600.00
Place Flow-Fill ......................................................... $2,580.00
Remove & Replace 4" Concrete .............................. $1,020.00
Place Millings .......................................................... $1,950.00
Tree Removal ............................................................. $385.00
Landscape Rock (3/4") ............................................... $720.00
Breeze (Driveway) ..................................................... $149.40
Subtotal: ................. $20,572.40 (14%)
TOTAL: ................. $147,913.26
FINANCIAL IMPACT
Funding for this project will come from the sanitary sewer rehabilitation budget funded by the
Sewer User Fund. Funding is available and has been appropriated and allocated to Project No.
11-012 (WWAN03). Of the total project cost, $24,715 is a Stormwater Department expense.
The Wastewater fund will be reimbursed by the Stormwater Fund for that amount.
ARTICLE 1
C. CONTRACT AGREEMENT
For
Emergency Sanitary Sewer Repair
THIS AGREEMENT made and entered into this 9th day of February, 2012, by and between the City of
Pueblo, a Municipal Corporation, hereinafter referred to in the Contract Documents as the "City ", and K.R.
Swerdfeger Construction, Inc., referred to in the Contract Documents as "Contractor ".
WITNESSETH: In consideration of the sum to be paid by the City to the Contractor at the time and in the
manner hereinafter provided, the said Contractor has agreed, and does hereby agree, to furnish all labor,
tools, equipment and material and to pay for all such items, and to construct complete in every detail, To -Wit:
Project No. 11 -012 (WWANO3)
FY2011 and 2012 Sanitary Sewer Point Repair
Alley Between Carteret Avenue and Lake Avenue, Summit Avenue
At the prices bid in Article 1.B. Request for Quotation form, in accordance with the drawings and
specifications, and all Contract Documents for this project which are on file and available for inspection in the
office of the Director of Wastewater, all to the satisfaction of the Director of Public Works for the City of
Pueblo, Colorado
AND FOR SAID CONSIDERATION IT IS FURTHER AGREED BY AND BETWEEN THE PARTIES TO
THIS AGREEMENT AS FOLLOWS:
1. Construction and installation of the above enumerated work for the City shall be completed and ready
for use in accordance with the time of completion described in the Notice to Proceed for the Sub -
Project. This time shall be extended only for those periods set forth in the Contract Documents and
in accordance with the requirements of same.
2. The work and material for the Project covered by the Contract Documents shall be completely
installed and delivered to the City within the time above stated, clear and free from any and all liens,
claims and demands of any kind. Wherever in the Contract Documents the term "Project" is used, it
shall be taken to mean this Sub - project.
3. The full compensation to be paid to the Contractor by the City, pursuant to the terms of this Contract,
shall be payable as provided in the Contract Documents.
4. This Contract consists of the following component parts and documents, all of which taken together
constitute and are referred to as the Contract Documents, and the same are incorporated as part of
the Contract as if set out herein verbatim, whether the same have been attached hereto or not:
A. Request for Quotations
B. This Contract Agreement
C. General Conditions of the Contract — Article 3
D. Special Conditions
E. The Standard Construction Specifications and Standard
Details for CityofPueblo, Colorado, (most current edition in
effect on date of bid opening), are hereby included by
reference and all provisions thereof shall be applicable. By
submitting his bid, the Contractor acknowledges that he
possesses a copy of said document.
w
5. Title XII, Chapter 2, of the 1971 Code of Ordinances, City of Pueblo, adopted by Ordinance No. 3476,
and amended by Ordinance No. 4476 and 5229, shall be considered a part of this contract.
6. Title I, Chapter 8, of the 1971 Code of Ordinances, City of Pueblo, adopted by Ordinance No. 4479,
shall be considered a part of the contract.
7. All of the covenants and agreements set forth in the Contract Documents shall inure to the benefit of
and be binding upon City and Contractor and their respective heirs, legal successors and assigns
and shall be governed by the laws of the State of Colorado.
8. Payment and Performance Bonds will not be required for this project if the bid amount is less than
$50,000.00 (per §38 -26 -106, C.R.S.). Progress payments will not be made, and a single payment
all work will be made upon completion of the entire Project and verification is made that it has been
inspected and approved by authorized Wastewater personnel.
IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed in four (4)
original counterparts as of the day and year first above written.
K.R. Swerdfeger Construction, Inc.
Go actor
By V 1
< 5 :::::: 00 /-,
b ► O � v Title P�>%ecf -- G`1cr
1 „ 11 ryy�ot,e\n r:„r r,.... EB
. 1 PUL• A MUNICIPAL CORPORATION
\ .;, ..1 -- 1 ' 1 4 C5 /
..j( 6,406,
Purchasing Agent
ATTEST:
City Clerk
BALANCE OF APPROPRIATION EXISTS FOR
THIS CONT AND FUNDS ARE AVAILABLE:
Director of Finance
APPR *V. D AS TA F•RM:
I Al
' V
is kOT City Attorney
CONTRACT CHANGE ORDER
CITY OF PUEBLO WASTEWATER DEPARTMENT
Project Number : 11 -012 Change Order No : ONE 2/7/2013 Page 1 of 1
Project Name : Alley Between Cateret Ave and Lake Ave Summit Ave
Contractor K.R. Swerdfeger, Inc
You are hereby requested to comply with the following changes from the plans & specifications:
Bid Item Description of Changes Decrease Increase
No Contract By Contract By
1 Remove & Replace 8" PVC Pipe <12' $1,350.00
2 Remove & Replace 7" Reinforce Concrete ($3,136 00)
3 Reinstate Service $700.00
4 Remove & Replace 48" Dia. Manhole ($4,000 00)
5 Mobilization $2,400.00
6 Remove & Replace 6" Reinforced Concrete $768.00
7 Remove & Replace Stand. C &G $800.00
8 Remove TV Camera $7,184.80
9 Services on Small $8,000.00
10 Slowed Production (Laying pipe backward due to alley width) $17,118.01
11 Potholing Services $4,640.22
12 Failed Bore $6,272.83
13 Bore Only $9,000.00
14 Regrade Alley $5,600.00
15 Asphalt Patch -4" Asphalt on 6" ABC $6,600.00
16 Place Flow -Fill $2,580.00
17 Additional Depth $535 00
18 Remove & Replace 4" Concrete $1,020 00
19 Traffic Control $5,175.00
20 Water Services $5,000.00
21 Millings $1,95000
22 Tree Removal $385.00
23 Landscape Rock (3/4 ") $720.00
24 Breeze (Driveway) $149.40
25 Storm Inlet $3,500.00
26 Storm Manhole $4,000.00
27 Storm Sewer $17,215.00
TOTAL (Decrease) / Increase 1 ($7,136 00)1 $112,663 261
Net Adjustment This Change Order $ 105,527 26
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 42,386 00
Total Adjusted Contract Amount To Date $ 147,913.26
Reason For Change: Change in scope of work
The time provided for completion of the contract is unchanged I by 0 calendar days
This document shall become an amendment to the contract and all provisions of the contract apps hereto.
/'
Prepared by: Ai. Date. ( b. 13
Reviewed by: Y � �. !rl�/ / , „ L Date Z 1 1
ng Supervisor
Accepted by: Date. (42/,3
Co recto
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that la' ful appropriations are sufficient o over such increase.
Approved by: _1..W Date: /// (-./ i
Direct • of Wastewater
EMERGENCY POINT REPAIR
IN THE ALLEY BETWEEN CARTERET AVENUE AND LAKE AVENUE,
SUMMIT AVE
464780.6 =64763.07--„,."
64763 0 •
r �
4 ' - 464765.6 •
it. R
.
Rice Ay e 464775 , �1 ♦ /
fir--..".c. r as r ' * .
o . • • • 464775 4b , ` r • '
�t
464774 1 •"
dM 464775 -4 AN N . " + .' 4! ' • • # 1,, 474768.8 %
464774 8 •' .44,, *4 .4 .'' % ',;
+ ;
464774.2 d a d ; da# ' R 464779. d 7 F
— Vernon PI"' � s .` i 4 '9
q
�** +' '9 '� • f v *
,
R " . , '• ; - 464778.0 A 4.4 y 46477 • • 1 `�`
, . ., " : N. , . A
.- •. '4.46`' • 4 " 44 0; '', t ») "--Ir . ,
„. fir , . , .?. • C • 1 'L, ; , • .: `° ?...
' r
� `v
• €. ` 464680 1 ' .
v •
6 3 , a
a 464 673 4 k 464670 8 � z ` k
w 464774 , A w
Small Ave ' _� °, ' 464680 4 � , s le. , '
— ° •y q 464673.2 46467 1 4 • • ,_ �• ,,
4 64675'6 REHAB SITE - 4.. ..
1110,„ ,,,,.. s * 464675.8
Ir. '
. ' - - ' lit A, r , ...
... .. .
..
...,, „....., , .
ir , , .,
., ,
- ...,..,,..,, ,. .. It - n
, .
I � � x;: ,,./.41, .' '
"'"` ( ` 474669 1
01 toa - '' . 4 f
vat* G r e ene Ave 464676.9 ' - < •
_ . 46467!) ()
4646781 x, a !! ! 4
...voirj � • S. t • ,�
� < ' 4741;11•
.! �« r im r w • o . • •
64(,(G f1 . �
^��• '� `; 1 / 4 � ?+� i � �+ I. 4746 t,
Q 41; 4(;78 9 464677 3C1? . , , 464671 46 4 6 II'
464671 9 " "• r 464(871 1) ti
464671 5
e'1' • 'll 4646I7 301 + , itt
4u4t 80 5:�� Missed38 •' ' r