HomeMy WebLinkAbout12520RESOLUTION NO. 12520
A RESOLUTION AUTHORIZING THE TRANSFER OF
$57,490 FROM WASTEWATER’S PROFESSIONAL
th
SERVICES ACCOUNT TO CP1004 – WEST 11 STREET
BRIDGE REPLACEMENT, TO PROVIDE ALL DESIGN
NECESSARY FOR ENCASEMENT, CHANNEL GRADE
CONTROL STRUCTURES AND ASSOCIATED CHANNEL
GRADING DESIGNS FOR THE 18 INCH SANITARY
SEWER THAT IS TO BE RELOCATED NORTH OF THE
TH
WEST 11 STREET BRIDGE REPLACEMENT PROJECT
th
WHEREAS, the West 11 Street Bridge is currently being replaced by the City of
Pueblo, and;
WHEREAS, URS Corporation has provided design for the replacement of the
th
West 11 Street Bridge, and;
th
WHEREAS, an 18 inch sanitary sewer must be relocated north of the West 11
Street Bridge;
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
An Engineer’s estimate has been prepared for the cost of the design for an
encasement and channel grade control structure for the 18 inch sanitary sewer
relocation in the approximate amount of $57,490.
SECTION 2.
Funds in the amount of $57,490 are hereby transferred from Wastewater’s
th
Professional Services Account to Project No. CP1004 – West 11 Street Bridge
Replacement Project.
SECTION 3.
This Resolution shall become effective upon passage and approval.
INTRODUCED: October 22, 2012
BY: Sandy Daff
COUNCIL PERSON
Background Paper for Proposed
RESOLUTION
DATE: October 22, 2012 AGENDA ITEM # M-4
DEPARTMENT: WASTEWATER DEPARTMENT
GENE MICHAEL - DIRECTOR
PUBLIC WORKS DEPARTMENT
EARL WILKINSON, P.E. - DIRECTOR
TITLE
A RESOLUTION AUTHORIZING THE TRANSFER OF $57,490 FROM
th
WASTEWATER’S PROFESSIONAL SERVICES ACCOUNT TO CP1004 – WEST 11
STREET BRIDGE REPLACEMENT, TO PROVIDE ALL DESIGN NECESSARY FOR
ENCASEMENT, CHANNEL GRADE CONTROL STRUCTURES AND ASSOCIATED
CHANNEL GRADING DESIGNS FOR THE 18 INCH SANITARY SEWER THAT IS TO
TH
BE RELOCATED NORTH OF THE WEST 11 STREET BRIDGE REPLACEMENT
PROJECT
ISSUE
Should the City Council authorize the transfer of funds from Wastewater’s Professional
th
Services Account to CP1004 – West 11 Street Bridge Replacement project, to provide
all design necessary for encasement, channel grade control structures and associated
channel grading designs for the 18 inch sanitary sewer that is to be relocated north of
th
the West 11 Street Bridge Replacement Project?
RECOMMENDATION
Approve this Resolution.
BACKGROUND
The City of Pueblo Public Works Department has an agreement with URS Corporation
th
for the West 11 Street Bridge Replacement project design. There is currently an 18
inch sanitary sewer line that needs to be relocated to the north of the proposed bridge
replacement in order to protect it. The sanitary sewer encasement and grade control
structure design will be incorporated as a modification to Public Work’s agreement with
URS Corporation.
FINANCIAL IMPACT
Funds in the amount of $57,490 shall be transferred from Wastewater’s Professional
th
Services Account to CP1004 – West 11 Street Bridge Replacement.