Loading...
HomeMy WebLinkAbout12520RESOLUTION NO. 12520 A RESOLUTION AUTHORIZING THE TRANSFER OF $57,490 FROM WASTEWATER’S PROFESSIONAL th SERVICES ACCOUNT TO CP1004 – WEST 11 STREET BRIDGE REPLACEMENT, TO PROVIDE ALL DESIGN NECESSARY FOR ENCASEMENT, CHANNEL GRADE CONTROL STRUCTURES AND ASSOCIATED CHANNEL GRADING DESIGNS FOR THE 18 INCH SANITARY SEWER THAT IS TO BE RELOCATED NORTH OF THE TH WEST 11 STREET BRIDGE REPLACEMENT PROJECT th WHEREAS, the West 11 Street Bridge is currently being replaced by the City of Pueblo, and; WHEREAS, URS Corporation has provided design for the replacement of the th West 11 Street Bridge, and; th WHEREAS, an 18 inch sanitary sewer must be relocated north of the West 11 Street Bridge; BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. An Engineer’s estimate has been prepared for the cost of the design for an encasement and channel grade control structure for the 18 inch sanitary sewer relocation in the approximate amount of $57,490. SECTION 2. Funds in the amount of $57,490 are hereby transferred from Wastewater’s th Professional Services Account to Project No. CP1004 – West 11 Street Bridge Replacement Project. SECTION 3. This Resolution shall become effective upon passage and approval. INTRODUCED: October 22, 2012 BY: Sandy Daff COUNCIL PERSON Background Paper for Proposed RESOLUTION DATE: October 22, 2012 AGENDA ITEM # M-4 DEPARTMENT: WASTEWATER DEPARTMENT GENE MICHAEL - DIRECTOR PUBLIC WORKS DEPARTMENT EARL WILKINSON, P.E. - DIRECTOR TITLE A RESOLUTION AUTHORIZING THE TRANSFER OF $57,490 FROM th WASTEWATER’S PROFESSIONAL SERVICES ACCOUNT TO CP1004 – WEST 11 STREET BRIDGE REPLACEMENT, TO PROVIDE ALL DESIGN NECESSARY FOR ENCASEMENT, CHANNEL GRADE CONTROL STRUCTURES AND ASSOCIATED CHANNEL GRADING DESIGNS FOR THE 18 INCH SANITARY SEWER THAT IS TO TH BE RELOCATED NORTH OF THE WEST 11 STREET BRIDGE REPLACEMENT PROJECT ISSUE Should the City Council authorize the transfer of funds from Wastewater’s Professional th Services Account to CP1004 – West 11 Street Bridge Replacement project, to provide all design necessary for encasement, channel grade control structures and associated channel grading designs for the 18 inch sanitary sewer that is to be relocated north of th the West 11 Street Bridge Replacement Project? RECOMMENDATION Approve this Resolution. BACKGROUND The City of Pueblo Public Works Department has an agreement with URS Corporation th for the West 11 Street Bridge Replacement project design. There is currently an 18 inch sanitary sewer line that needs to be relocated to the north of the proposed bridge replacement in order to protect it. The sanitary sewer encasement and grade control structure design will be incorporated as a modification to Public Work’s agreement with URS Corporation. FINANCIAL IMPACT Funds in the amount of $57,490 shall be transferred from Wastewater’s Professional th Services Account to CP1004 – West 11 Street Bridge Replacement.