RESOLUTION NO. 12283
A RESOLUTION AWARDING A CONSTRUCTION
CONTRACT IN THE AMOUNT OF $243,498.24 TO K.R.
SWERDFEGER CONSTRUCTION, INC., FOR SANITARY
SEWER POINT REPAIR IN THE ALLEY BETWEEN 6TH
STREET AND 7TH STREET, FOUNTAIN AVENUE-
HUDSON AVENUE; THE ALLEY BETWEEN 8TH STREET
AND 9TH STREET AT FOUNTAIN AVENUE; AND AT
SITTER PLACE/CRAWFORD PLACE; AND AUTHORIZING
THE PURCHASING AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code, and;
WHEREAS the repair work was awarded to K.R. Swerdfeger Construction, Inc. under
the 2011-2012 multi-year point repair contract;
NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
thth
A contract to repair the sanitary sewers in the alley between 6 Street and 7 Street,
thth
Fountain-Hudson Avenues, in the alley between 8 Street and 9 Street at Fountain Avenue,
and at Sitter Place/Crawford Place. Contract Agreement for Sanitary Sewer Repair with K.R.
Swerdfeger Construction, Inc. Project No. 11-012 (WWAN03) is hereby awarded to said bidder
in the amount of $243,498.24.
SECTION 2.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 3.
Funds for said project shall be from the Sewer User Fund.
INTRODUCED December 27, 2011
BY: Leroy Garcia
COUNCILPERSON
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # M-3
DATE: DECEMBER 27, 2011
DEPARTMENT: WASTEWATER DEPARTMENT
GENE MICHAEL, DIRECTOR
TITLE
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$243,498.24 TO K.R. SWERDFEGER CONSTRUCTION, INC., FOR SANITARY
SEWER POINT REPAIR IN THE ALLEY BETWEEN 6TH STREET AND 7TH STREET,
FOUNTAIN AVENUE-HUDSON AVENUE; THE ALLEY BETWEEN 8TH STREET AND
9TH STREET AT FOUNTAIN AVENUE; AND AT SITTER PLACE/CRAWFORD
PLACE; AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
ISSUE
Should the City Council award a construction contract in the amount of $243,498.24 to
K.R. Swerdfeger Construction, Inc., for sanitary sewer point repair in the alley between
ththth
6 Street and 7 Street, Fountain Avenue-Hudson Avenue, the alley between 8 Street
th
and 9 Street at Fountain, and at Sitter Place?
RECOMMENDATION
Approve this Resolution.
BACKGROUND
In the summer of 2011 the Wastewater Department became aware of two major
structural issues in the sanitary sewer mains on the east side of Pueblo. The first was a
th th
broken sewer main in the alley between 8Street and 9 Street at Fountain Avenue.
Television inspection revealed that the pipe had deteriorated to the point where voids
were forming. This line was considered a trouble spot due to its declining condition. To
prevent any recurrence of maintenance problems, the sewer main required immediate
repair. During construction the Contractor encountered bedrock. This accounts for the
elevated cost in excavation and construction.
thth
The second main was between 8 Street and 9 Street at Hudson Avenue. Television
inspection revealed a hole in the sewer main and large void outside the pipe. The
engineering division initially believed that only a point repair was necessary. When the
Contractor dug up the main, they determined that the remaining pipe lacked sufficient
structural integrity to form a strong tie with the new pipe. Further television inspection
revealed that there would be no unbroken pipe for two blocks. A full rehabilitation of the
sanitary sewer was required from Fountain Avenue to east of Hudson Avenue. This
accounts for the change in costs for this site.
The third site on this contract was on Sitter Place and Crawford Place. The sewers
were not constructed in accordance with current design standards, causing
maintenance equipment to become lodged in the sewers. Manholes were built to
replace the inspection points that had originally been installed.
The quote for the unit prices for the work by K.R. Swerdfeger Construction, Inc. and the
change orders for the project are attached. This work was performed under the Sanitary
Sewer Point Repair multi-year contract under which eight contractors were qualified via
competitive bid.
The cost breakdown for the project is as follows:
Sewer Replacement-related
thth
6 and 7 Fountain-Hudson............................$97,088.52
thth
8 and 9 at Fountain.....................................$99,285.22
Sitter Place......................................................$10,400.00
Subtotal:............$206,773.74 (85%)
Surface Improvement-related
thth
6 and 7 Fountain-Hudson............................$32,283.00
thth
8 and 9 at Fountain.......................................$3,841.50
Sitter Place...........................................................$600.00
Subtotal:..............$36,724.50 (15%)
TOTAL:..............$243,498.24
FINANCIAL IMPACT
Funding for this project will come from the sanitary sewer rehabilitation budget funded
by the Sewer User Fund. Funding is available, and has been appropriated and allocated
to Project No. 11-012 (WWAN03).
{
ARTICLE 1
C CONTRACT AGREEMENT
For
Emergency Sanitary Sewer Repair
THIS AGREEMENT made and entered into this 2nd day of August, 2011 by and between the City of
Pueblo a Municipal Corporation hereinafter referred to in the Contract Documents as the "City " and KR
Swerdfeger Construction Inc. referred to in the Contract Documents as `Contractor "
WITNESSETH In consideration of the sum to be paid by the City to the Contractor at the time and in
the manner hereinafter provided the said Contractor has agreed and does hereby agree to furnish all
labor tools equipment and material and to pay for all such items and to construct complete in every
detail To -Wit:
Project No. 11 -012 (WWANO3)
FY2011 and 2012 Sanitary Sewer Point Repair
Alley between 6th and 7th, at Hudson Street
Alley between 8th and 9th, at Fountain Avenue
At the prices bid in Article 1 B Request for Quotation form, in accordance with the drawings and
specifications and all Contract Documents for this project which are on file and available for inspection in
the office of the Director of Wastewater all to the satisfaction of the Director of Public Works for the City of
Pueblo Colorado
AND FOR SAID CONSIDERATION IT IS FURTHER AGREED BY AND BETWEEN THE PARTIES TO
THIS AGREEMENT AS FOLLOWS
1 Construction and installation of the above enumerated work for the City shall be completed and
ready for use in accordance with the time of completion described in the Notice to Proceed for the
Sub - Project. This time shall be extended only for those periods set forth in the Contract Documents
and in accordance with the requirements of same
2 The work and material for the Project covered by the Contract Documents shall be completely
installed and delivered to the City within the time above stated, clear and free from any and all liens
claims and demands of any kind Wherever in the Contract Documents the term "Project' is used it
shall be taken to mean this Sub - project.
3 The full compensation to be paid to the Contractor by the City pursuant to the terms of this Contract,
shall be payable as provided in the Contract Documents
4 This Contract consists of the following component parts and documents all of which taken together
constitute and are referred to as the Contract Documents and the same are incorporated as part of
the Contract as if set out herein verbatim whether the same have been attached hereto or not:
A. Request for Quotations
B This Contract Agreement
C General Conditions of the Contract — Article 3
D Special Conditions
E The Standard Construction Specif►catlons and Standard
Details for City of Pueblo, Colorado, (most current edition in
effect on date of bid opening) are hereby included by
reference and all provisions thereof shall be applicable By
submitting his bid the Contractor acknowledges that he
possesses a copy of said document.
S
5 Title XII Chapter 2 of the 1971 Code of Ordinances City of Pueblo adopted by Ordinance No
3476 and amended by Ordinance No 4476 and 5229 shall be considered a part of this contract.
6 Title I Chapter 8 of the 1971 Code of Ordinances City of Pueblo adopted by Ordinance No 4479
shall be considered a part of the contract.
7 All of the covenants and agreements set forth in the Contract Documents shall inure to the benefit of
and be binding upon City and Contractor and their respective heirs legal successors and assigns
and shall be governed by the laws of the State of Colorado
8 Payment and Performance Bonds will not be required for this project if the bid amount is less than
$50 000 00 (per §38 -26 -106 C R S) Progress payments will not be made and a single payment
all work will be made upon completion of the entire Project and verification is made that it has been
inspected and approved by authorized Wastewater personnel
IN WITNESS WHEREOF the parties hereto have caused this instrument to be executed in four (4)
original counterparts as of the day and year first above written
KR Swerdfeaer Construction, Inc,
Cont -ctor
By \ :'
Title t?
PUEBL A MUNICIPAL CORPORATION
1507.0. 0
,��` Pu chasing Agent
%4'�gie~s • ATTEST
c ., iiiiiscill ,e 4404u0"0" ■ i......esb-
City Clerk
BALANCE OF APPROPRIATION EXISTS FOR
THIS CONTR % T FUNDS ARE AVAILABLE
rector of Finance
APPROVED AS TO RM
i -14 ity Attorn
I
ARTICLE 1
B. REQUEST FOR QUOTATIONS
PROJECT NO 11 -012 (WWANO3)
PROJECT NAME Point Repair — Alley between 6th and 7th at Hudson Street
Alley between 8th and 9th at Fountain Avenue
All proposals are to be prepared on this form. All blank spaces must be correctly filled in where
indicated for each and every item for which a quantity is given and the bidder must state the prices
(written in ink or typewritten) for which he proposes to do each item of the work contemplated or
furnish each item of the materials required
The undersigned having become familiar with the local conditions affecting the cost of the
work, and with the contract documents including advertisement for bids the form of proposal the form
of contract, form of bond special provisions of the contract, general provisions of the contract, etc.
plans drawings and specifications issued and attached to the contract documents on file in the office
of the Purchasing Agent, hereby proposes to furnish all of the labor materials necessary tools and
equipment and all utility and transportation service necessary to perform and complete in a
workmanlike manner all of the work required in connection with the construction of an Emergency
Repair in the AIIey between 6th and 7th, at Hudson Street and the AIIey between 8th and 9th, at
Fountain Avenue in accordance with the plans and specifications as prepared by or for the City of
Pueblo Colorado, for the sums set forth in the following bidding schedule
BID ESTIMATED UNIT
ITEM DESCRIPTION QUANTITY PRICE AMOUNT
AIIey between 6th and 7th, at Hudson Street
1 Remove & Replace 8' PVC 281 LF $ 45 00 $ 12 645 00
2 Remove & Replace 4 Asphalt 50 LF $ 65 00 $ 3 250 00
3 Remove & Replace 7' RIC 400 SF $ 7 00 $ 2 800 00
4 Remove & Replace Curb & Gutter 50 LF $ 20 00 $ 1 000 00
5 Remove & Replace Manholes 2 Each $ 4 000 00 $ 8 000 00
6 Reinstate Services 12 Each $ 350 00 $ 4,200 00
7 Mobilization 1 LS $ 1 200 00 $ 1,200 00
SUB TOTAL BID $33,095.00
Page 1 of 3
C- ART1 -B, 1 -13 -2003
Alley between 8th and 9th, at Fountain Avenue
1 Remove & Replace 8' PVC 420 LF $ 45 00 $ 18 900 00
2 Remove & Replace 4 Asphalt 30 LF $ 65 00 $ 1 950 00
3 Remove & Replace 7' RIC 300 SF $ 7 00 $ 2 100 00
4 Remove & Replace Curb & Gutter 25 LF $ 20 00 $ 500 00
5 Remove & Replace Manholes 3 Each $ 4 000 00 $ 12 000 00
6 Reinstate Services 14 Each $ 350 00 $ 4 900 00
7 Mobilization 1 LS $ 1,200 00 $ 1,200 00
SUB TOTAL BID $41,550.00
GRAND TOTAL BID $74.645.00
(Seventv -Four Thousand Six Hundred Fortv -Five dollars and zero cents)
The Grand Total Bid shall be the basis for establishing the amount of the performance bond for
this contract. The total bid is based on quantities shown on the proposal form and on the dimensions
shown on the plans and is subject to additions or reductions according to the actual construction
quantities as determined by the Engineer upon completion of the construction
The City reserves the right to adjust the required quantities and the contractor shall furnish said
quantities at the unit price quoted above The time allowed for construction shall be adjusted in direct
proportion of the adjusted quantities to the estimated quantities
The undersigned has carefully checked the above quantities against the plans and specifications
before preparing this proposal and accepts the said quantities as substantially correct, both as to
classification and amount, and as correctly listing the work to be done in accordance with the plans
and specifications.
The bidder must sign his proposal correctly and in ink, if the proposal is offered by an individual
his name office and post office address must be shown If made by a firm or partnership the name
office and post office address of each member of the firm or partnership must be given if offered by a
corporation the person signing the proposal must give the name of the state under the laws of which
the corporation was chartered, and the name title and business address of the President, Secretary
and the Treasurer Anyone signing a proposal as agent must file legal evidence of his authority to do
so and that the signature is binding upon the firm or corporation
Page 2 of 3
C- ART1 -B; 1 -13 -2003
The undersigned if awarded the contract, agrees to complete and file the complete contract and
performance bond in quadruplicate within ten (10) days of the date of Notice of Award and further
agrees to complete the work within thirty -five (35) calendar days of Notice to Proceed
Liquidated damages will be assessed in accordance with Section 3 54 of ARTICLE 3 -
GENERAL PROVISIONS for every calendar day thereafter until the work is complete and accepted by
the City of Pueblo
NOTE Bidders should not add any conditions or qualifying statements to this bid as
otherwise the bid may be declared irregular as being not responsive to the
advertisement for bids
The contractor shall be subject to all applicable City County State and
Federal Taxes in the performance of this contract.
Firm Name KR Swerdfeqer Construction
Business Address 421 E. Industrial Blvd.
Pueblo West, CO 81007
`
By ' 4110FP
Title • PmtCr -(-
Date - jfl - f Tele No 719- 547 -0242
Fax No 719 - 547 -9297
Contractor's Federal I D Number 84- 0647489
Page 3 of 3
C- ART1 -B, 1 -13 -2003
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number 11 -012 Change Order No. ONE 12/1/2011 Page 1 of 1
Project Name SANITARY SEWER POINT REPAIR IN ALLEY BTN 6TH & 7TH STREETS
HUDSON
Contractor KR SWERDFEGER CONSTRUCTION INC
You are hereby requested to comply with the following changes from the plans & specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 R &R 8' PVC < 8' $18 855 00
2 R &R 4' ASPHALT ON CLASS 6 ABC ($3,250.00)
3 R &R RIC $8,610 00
4 R &R C &G $1 925 00
5 MANHOLES $4 000 00
6 REINSTATE SERVICES $13,650.00
8 R &R 8' PVC <12' $19 800 00
9 R &R 18' PVC <12' $5 750 00
10 R &R 6' RIC $930 00
11 R &R 4' RIC $1,388 00
12 R &R 6' CURB HEAD $240 00
13 FLOWFILL $5 040 00
14 BYPASS PUMPING $4 000 00
15 MILLINGS $4 600 00
16 CLEANING HEAD REMOVAL $409.52
17 TRAFFIC CONTROL $10 329 00
TOTAL Decrease / Increase $3,250.00 $99,526.52
Net Adjustment This Change Order $ 96,276 52
Amount of Previous Change Order(s) $ 0 00
Original Contract Amount $ 33 095 00
Total Adjusted Contract Amount To Date $ 129 371 52
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is unchanged by 0 calendar days.
This document shall become an amendment to the contract and all .rovisions of the contract a • .l hereto
Prepared by Date:
Associate Engineer 11
Reviewed by Date:
Wastewater Engineering Supervisor
Accepted by Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by Date:
Director of Wastewater
FORM C0100.1299
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number 11 -012 Change Order No ONE 12/1/2011 Page 1 of 1
Project Name SANITARY SEWER POINT REPAIR IN ALLEY BTN 8TH & 9TH STREETS
FOUNTAIN
Contractor KR SWERDFEGER CONSTRUCTION INC
You are hereby requested to comply with the following changes from the plans & specifications.
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 R &R 8' PVC < 8' ($18,900 00)
2 R &R 4 ASPHALT ON CLASS 6 ABC ($1 150 00)
3 R &R RIC ($18 50)
4 R &R C &G $460 00
5 MANHOLES ($12,000 00)
6 REINSTATE SERVICES ($4 900 00)
7 MOBILIZATION ($1,200 00)
8 ROCK EXCAVATION $27 669 97
9 ROCK EXCAVATION $18,773 38
10 ROCK EXCAVATION $14 059 89
11 ROCK EXCAVATION $17 174 94
12 MATERIALS $21 607 04
TOTAL (Decrease) / Increase 11 ($38,168.50)1I $99,745.22
Net Adjustment This Change Order $ 61,576.72
Amount of Previous Change Order(s) $ 0 00
Original Contract Amount $ 41 550 00
Total Adjusted Contract Amount To Date $ 103 126.72
Reason For Change. Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is unchanged by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto
Prepared by Date
Associate Engineer 11
Reviewed by Date
Wastewater Engineering Supervisor
Accepted by Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase
Approved by Date:
Director of Wastewater
FORM C0100.1299
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number 11 -012 Change Order No ONE 12/1/2011 Page 1 of 1
Project Name SANITARY SEWER POINT REPAIR IN SITTER PLACE
Contractor KR SWERDFEGER CONSTRUCTION INC
You are hereby requested to comply with the following changes from the plans & specifications
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 3 Added Sitter Place Repair to Contract $11 000 00
TOTAL (Decrease) / Increase I $0.00 $11,000 00
Net Adjustment This Change Order $ 11 000 00
Amount of Previous Change Order(s) $ 0 00
Original Contract Amount $ 0 00
Total Adjusted Contract Amount To Date $ 11 000 00
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is unchanged by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by Date:
Associate Engineer 11
Reviewed by Date
Wastewater Engineering Supervisor
Accepted by' Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase
Approved by Date.
Director of Wastewater
FORM C0100.1289