Loading...
HomeMy WebLinkAbout12223 Background Paper for Proposed RESOLUTION # M-4 DATE: September 12, 2011AGENDA ITEM DEPARTMENT: WASTEWATER DEPARTMENT GENE MICHAEL, DIRECTOR TITLE A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $19,000 TO DIAZ CONSTRUCTION GROUP LLC, AND SETTING FORTH $3,800 FOR CONTINGENCIES, FOR THE GREENWOOD LIFT STATION REHABILITATION PROJECT AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME ISSUE Should the City Council award a construction contract in the amount of $19,000 to Diaz Construction Group LLC, for the Greenwood Lift Station Rehabilitation Project? RECOMMENDATION Approve this Resolution. BACKGROUND The Greenwood Lift Station was rehabilitated in 1996. Lift station piping and equipment in a wastewater environment in Pueblo has been shown to have a useful design life of approximately 15-20 years. It has been 15 years since the previous rehabilitation and the lift station is showing signs of deterioration. The pipes and equipment are showing severe corrosion and the valves are beginning to malfunction. This includes an occasional failure to close properly, therefore reducing lift station efficiency. To avoid any potential failures the lift station will be rehabilitated at this time. During rehabilitation the pumps and electronics will remain in place while the piping, valves, fittings, and the bubbler tube will be replaced. The project also includes the application of an epoxy coating to the interior of the wet well to reduce concrete degradation. A bid summary sheet is attached. The cost breakdown for the project is as follows: Greenwood Lift StationSUBTOTAL: $19,000.00 Contingencies SUBTOTAL: $ 3,800.00 TOTAL: $22,800.00 FINANCIAL IMPACT Funding for this project will be taken from the Sewer User Fund, Project Number 11-073 (WWAN01). Funding is available and was appropriated in the 2011 budget. RESOLUTION NO. 12223 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $19,000 TO DIAZ CONSTRUCTION GROUP LLC, AND SETTING FORTH $3,800 FOR CONTINGENCIES, FOR THE GREENWOOD LIFT STATION REHABILITATION PROJECT AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, competitive bids for the Project No. 11-073 (WWAN01) Greenwood Lift Station Rehabilitation have been received and examined, and; WHEREAS the proposal of Diaz Construction Group LLC. of Denver, Colorado was the lowest of those bids determined to be responsive; BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A contract to rehabilitate the Greenwood Lift Station of Pueblo, Inc., as specified in the drawings, Contract Agreement for Sanitary Sewer Repair with Diaz Construction Group LLC. $19,000 (Project No. 11-073; WWAN01) is hereby awarded to said bidder in the amount of . SECTION 2. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work………$3,800 SECTION 4. Funds for said project shall be from the Sewer User Fund. INTRODUCED September 12, 2011 BY: Vera Ortegon COUNCILPERSON