HomeMy WebLinkAbout08325ORDINANCE NO. 8325
AN ORDINANCE AMENDING THE FISCAL YEAR 2011
STAFFING ORDINANCE REVISING POSITIONS WITHIN THE
WASTEWATER DEPARTMENT
WHEREAS, it is necessary to revise the positions for the ultimate efficiency and
functionality for the Wastewater Department
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that: (brackets indicate matter
being deleted, underscore indicates matter being added)
SECTION 1.
The following section captioned “WASTEWATER” of Ordinance No. 8296, being the
2011 Staffing Ordinance, are amended as follows:
WASTEWATER
Director of Wastewater 1
WW Engineering Supervisor 1
WW Collection Supervisor 1
WWTP Superintendent 1
WWTP Lab Supervisor 1
WWTP Maintenance Supervisor 1
WWTP Operations Manager 1
Regulatory Compliance Specialist 1
WW Accounting Specialist 1
[]
12
Associate Engineer II WW
Wastewater Data Technician 1
Wastewater Inspector 1
WW Utility Worker IV 7
Wastewater Lift Station Operator 2
WW SCADA Coordinator 1
Pretreatment Manager 1
Chief WWTP Operator 4
Lab Analyst III 1
Lab Analyst 2
Pretreatment Specialist 1
Utility Worker/WRF Worker I/WRF Worker II 6
Assistant WWTP Operator C 1
WWTP Maintenance Mechanic 2
Senior WWTP Maintenance Mechanic 1
WW Instrument & Controls Specialist 1
Administrative Tech/ Admin Tech (Certified) 0.5
Senior Clerk Typist/Senior Clerk (Certified) 1
Utility Worker/ WW Utility Worker I/
WW Utility Worker II/ WW Utility Worker III
7
Total[50.5] 51.5
SECTION 2.
This Ordinance shall become effective immediately upon final passage and approval.
INTRODUCED: February 28, 2011
BY: Judy Weaver
COUNCILPERSON
PASSED AND APPROVED: March 28, 2011
Background Paper for Proposed
ORDINANCE
DATE: February 28, 2011 AGENDA ITEM # R-3
DEPARTMENTS:
JERRY PACHECO, CITY MANAGER
MARISA WALKER, DIRECTOR OF HUMAN RESOURCES
GENE MICHAEL, WASTEWATER DIRECTOR
TITLE
AN ORDINANCE AMENDING THE FISCAL YEAR 2011 STAFFING ORDINANCE
REVISING POSITIONS WITHIN THE WASTEWATER DEPARTMENT
ISSUE
Should City Council pass and approve the proposed Ordinance providing for the allocation of
positions within the Wastewater Department for the Fiscal Year?
RECOMMENDATION
Approval of the ordinance.
BACKGROUND
The Wastewater Department requests to adjust its staffing to hire an additional Associate
Engineer II-WW position.
The addition of this position will provide the following needs.
1. Design Wastewater rehabilitation projects and sanitary sewer liftstations.
2. Provide electrical and mechanical support for the maintenance requirements of Water
Reclamation Facility operations.
3. Assist consulting firms in construction at the Water Reclamation Facility, eliminating a
need for consulting inspectors.
4. Perform capacity studies for the Wastewater Department.
5. Assist in the inspection of current ammonia removal projects.
6. Prepare design specifications for replacement equipment at the Water Reclamation
Facility.
FINANCIAL IMPACT
Wastewater Department’s financial impact is an estimated annual salary and benefits expense
increase of $71,121.41. Funds for the additional salary and benefits are available from the
Sewer User Fund.