HomeMy WebLinkAbout11952RESOLUTION NO. 11952
A RESOLUTION ESTABLISHING FEES FOR
CONTRACTORS' LICENSES, REGISTRATIONS, PERMITS
AND INSPECTIONS AND RELATED SERVICES
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that:
SECTION 1.
Fees required to be paid pursuant to Title IV of the Pueblo Municipal Code in
connection with any license, registration, examination, license application, plan review,
building permit, plumbing permit, mechanical permit, electrical permit, inspection or
reinspection, or otherwise required to be paid pursuant to said Title or any code adopted
therein by reference, shall be determined and paid in accordance with the following
schedule, and are subject to the additional conditions, if any, specified herein:
A. Annual Contractor License (or Registration Fees):
1. Building “A” Contractor License $175.00
2. Building “B” Contractor License 150.00
3. Building “C” Contractor License 125.00
4. Building “D” Contractor -- Single Trade License 75.00
5. Building “D” Contractor -- Wrecking License 150.00
6. Building “D” Contractor-- Moving License 125.00
7. Plumbing Processing Fee For Registration 75.00
Plumbing Utility Contractor (Sewer & Water Service
8. 75.00 each
Lines or Fire Mains)
9. Water Connected Appliance 75.00
10. Mechanical “A” Contractor 150.00
Mechanical “C” Contractor (Gas Fitter or Sheet Metal
11. 75.00 each
or Refrigeration)
12. Electrical Registration No Fee
B. Annual Craftsmen License/Registration Fees:
1. Mechanical Master License $75.00
2. Stationary Engineer Registration 75.00
3. Journeyman Gas Fitter Registration or License 25.00
4. Journeyman Sheet Metal Worker License 25.00
5. Journeyman Refrigeration License 25.00
6. Mechanical Apprentice Registration 25.00
C. Examination Fees:
1. Building “A” & “B” Contractor $50.00
2. Building “C” Contractor 35.00
3. Building ‘D” (Per Exam) 25.00
4. Mechanical Contractor (Per Exam) 35.00
5. Craftsman Examinations (Per Exam) 25.00
6. Plumbing Utility Contractors 25.00
7. Water Connected Appliances 25.00
D. Multiple Licenses:
For those contractors possessing multiple licenses, the total fee shall be
equal to the sum of the highest license fee, as set forth above, plus 65% of the
specified fee for each of the other licenses, rounded to the next highest $5.00.
E. Renewal License and Registration Fees:
1. All licenses and registrations shall become delinquent on
December 31 of the year issued and shall be renewed annually upon application
and payment of the required license or registration fee; subject, however, to the
following limitations: the fee for any license or registration renewed after January
31 but on or before March 31 shall be one and one-half times the annual fee for
such license; the fee for any license or registration renewed after March 31 but
on or before May 31 shall be twice the annual license or registration fee for such
license or registration. All required insurance coverage certificates shall be filed
and approved before a license or registration is renewed. Any license or
registration not renewed before May 31 of the year following its issuance shall
thereupon expire and may not be renewed without examination, if examination
was required upon issuance of the initial license.
2. No permit shall be issued to any unlicensed or non-registered
person engaged in the construction business, or to any licensed or registered
person who is delinquent in payment of his or her annual license or registration
fee, or who has failed to comply with a provisional order, or whose license or
registration is suspended or revoked, or who is in any manner indebted to the
Department, or whose insurance has then expired.
F. License Application Fees:
1. An application fee of $35.00 is required to be paid at the time the
license application is submitted to the Pueblo Regional Building Department for
review and acceptance. Upon review of the application, the applicant will be
notified that either (a) the application cannot be accepted together with a
statement of the reasons it cannot be accepted or, if additional information is
required, identification of the necessary additional information, or (b) that the
application has been accepted and the date or dates upon which examination for
the license will be held.
G. Plan Review Fees:
Plan review fees shall be charged as follows:
10% of the building
1. New one and two family dwellings
permit fee
All other building and additions and 50% of the building
2.
alterations to existing buildings permit fee
Additional plan review required by changes,
3. $30.00 per hour
additions or revisions to approved plan
Review of plans by the Department is merely a code compliance review
and not a structural or suitability review. Such review shall not relieve the
designer, architect, engineer or contractor of responsibility for the structural
integrity of the contemplated work or from compliance with all provision of all
applicable codes.
H. Building Permit Fees:
1. General:
a. Permits are issued only for work that is described or shown
on approved plans or specifications.
b. Permits may not be issued until all required approvals have
been received from other governing agencies.
c. Permit fees for all construction projects are based on total
contract value, including but not limited to all building structure work,
electrical, mechanical, and plumbing systems, and sprinkler work, finish
work, overhead, material, labor and profit.
d. The contractor will provide the Department with a listing of
all subcontractors it will employ in connection with the work.
Subcontractors will be required to obtain a no-fee permit for their portion of
the work.
e. If a contractor or subcontractor is changed from that
indicated in the initial list provided before beginning the job, the Building
Department shall be notified. If during the course of the job a contractor or
subcontractor in which a permit has been issued to is changed, the new
contractor or subcontractor will be required to obtain a minimum fee permit
of $30.00.
f. The Department may require the Contractor to file with the
Department copies of its contracts with the owner of the work, and with
any one or more subcontractors employed in the work.
g. A minimum fee of $30.00 shall be charged for all permits. If a
permit is cancelled before any work is done, fees will be refunded except
for an administrative service charge of $15.00.
2. Residential:
a. Permit fees for alterations and remodeling shall be based on
the contract value. Permit fees are derived from Table B below.
b. The permit fees for all new construction and for additions to
existing structures shall be calculated based upon the Total Valuation of
the work in accordance with Table B below. The Total Valuation of the
work shall be the aggregate of the value of all classifications of
improvements based upon the square footage of the improvements and
calculated in accordance with Table A below.
3. Manufactured Structures:
a. Permit fees for all manufactured structures shall be
calculated based upon the total valuation of the work in accordance with
Table B. The total valuation of the work shall be the aggregate of the
valuation of all classification of improvement based upon the square
footage of the improvements and calculated in accordance with Table A.
b. Certificates of Occupancy for manufactured structures may
be obtained from the State of Colorado Division of Housing.
4. Commercial Structures:
Permit fees shall be calculated based upon total contract valuation
in accordance with Table B.
5. Sign, Moving and Wrecking permits:
Permit fees shall be calculated based upon total contract valuation
in accordance with Table B.
TABLE A
I. New Residences and Additions Thereto:
a. All Finished Living area $73.93 Per square foot
b. Basement, unfinished 12.50 Per square foot
c. Finish existing basement 19.50 Per square foot
Finished garden level or basement
d. 32.00 Per square foot
level
II. Manufactured/Modular Residence
a. Sitting of Manufactured Home $45.00 Per square foot
b. Finished Basement 32.00 Per square foot
c. Unfinished Basement 12.50 Per square foot
III. Garage and Accessory Structures:
a. Detached garage $24.00 Per square foot
b. Attached garage 22.00 Per square foot
c. Carports - open on two or more sides 15.00 Per square foot
d. Open patios or porches with roof 11.00 Per square foot
e. Enclosed patio 25.00 Per square foot
f. Deck 10.00 Per square foot
g. Deck with roof 20.00 Per square foot
TABLE B
TOTAL VALUATION PERMIT FEE
$1.00 to $500.00 $30.00
$30.00 for the first $500.00 plus $2.00 for
$501 to $2,000
each additional $100.00 or fraction thereof,
to and including $2,000.
$60.00 for the first $2,000 plus $9.00 for
$2,001 to $25,000
each additional $1,000.00 or fraction
thereof, to and including $25,000.
$267.00 for the first $25,000 plus $6.50 for
$25,001 to $50,000
each additional $1,000.00 or fraction
thereof, to and including $50,000.
$429.50 for the first $50,000 plus $4.50 for
$50,001 to $100,000 each additional $1,000.00 or fraction
thereof, to and including $100,000.
$654.50 for the first $100,000.00 plus $3.50
$100,001 to $500,000
for each additional $1,000.00 of fraction
thereof, to and including $500,000.
$2,054.50 for the first $500,000.00 plus
$500,001 to $1,000,000
$3.00 for each additional $1,000.00 or
including $1,000,000.
$3,554.50 for the first $1,000,000.00 plus
$1,000,001 AND UP
$2.00 for each additional $1,000.00 or
fractions thereof.
TABLE C
I. Residential Plumbing Only Permits
a. Sewer Connection $50.00 Each
b. Water Connection 40.00 Each
c. Lawn Sprinkler System 55.00 Each
II. Residential Mechanical Only Permits
a. Water Heater Replacement$40.00 Each
b. Furnace Replacement 65.00 Each
c. Furnace/AC Replacement 80.00 Each
d. Gas Air Test 40.00 Each
III. Residential Electrical Only Permits:
a. Upgrade/Replace Service $50.00 Each
b. Solar PV Systems 290.00 Each
c. A/C Hook up 40.00 Each
I. Plumbing Permit Fees:
Plumbing permit fees shall be as follows:
On a project that is exclusively limited to plumbing work and
does not otherwise require a building permit, the plumbing
contractor shall obtain a plumbing permit and the fees shall be
based on Table C for residential work listed. All other plumbing
permit fees shall be based on contract value and calculated in
accordance with the building permit fee schedule of Table B.
J. Mechanical Permit Fees:
Mechanical permit fees shall be as follows:
On a project that is exclusively limited to mechanical work
and does not otherwise require a building permit, the mechanical
contractor shall obtain a mechanical permit and the fees shall be
based on Table C for residential work listed. All other mechanical
permit fees shall be based on contract value and calculated in
accordance with the building permit fee schedule of Table B.
K. Electrical Permit Fees:
Electrical permit fees shall be as follows:
On a project that is exclusively limited to electrical work and
does not otherwise require a building permit, the electrical
contractor shall obtain an electrical permit and the fees shall be
shall be based on Table C for residential work listed. All other
electrical permit fees shall be based on contract value and
calculated in accordance with the building permit fee schedule of
Table B.
L. Miscellaneous Fees
1. For buildings required to be inspected for regulated use licensing,
including but not limited to use for cabarets, hotels, motels, foster care,
nursing homes or similar buildings, an inspection fee of $100.00 shall be
paid.
2. Inspections conducted outside of normal office hours at the request
of a permittee shall require payment of additional inspection fees of
$55.00 per hour for inspectors’ time reasonably required in inspection for
the work and travel to and from the site of the work, with a minimum fee
based upon 2 hours per inspector.
3. Reinspection fee shall be $35.00.
4. There shall be no additional fee for issuance of the final Certificate
of Occupancy. Partial, temporary or preliminary occupancy certificates
shall be charged an additional fee as follows:
Residential Properties -- $10.00 per living unit up to 4 units.
All other structures -- $25.00 per certificate.
M. Appeal fee shall be $100.00 per appeal.
N. Building Codes Applicable to City Buildings:
All codes referred to herein shall be applicable to buildings owned
or occupied by the City of Pueblo, its departments, divisions and agencies.
The City shall comply with the provisions of such codes including
obtaining permits for all work performed and payment of permit fees.
SECTION 2.
Resolution Nos. 8340, 8742 9199, 10300, and any resolutions relating to fees
charged by the Pueblo Regional Building Department are hereby rescinded and
superseded by this Resolution.
SECTION 3.
This Resolution shall become effective and apply on August 16, 2010.
INTRODUCED: August 9, 2010
BY: Judy Weaver /COUNCILPERSON
Background Paper for Proposed
RESOLUTION
DATE: AGENDA ITEM # Q-2
August 9, 2010
DEPARTMENT:
Law Department
Thomas J. Florczak, City Attorney
Regional Building Department
J. D. Potter, Chief Building Inspector
TITLE
A RESOLUTION ESTABLISHING FEES FOR CONTRACTORS' LICENSES,
REGISTRATIONS, PERMITS AND INSPECTIONS AND RELATED SERVICES
ISSUE
Should City Council pass a resolution adopting a new fee schedule for services provided by the
Pueblo Regional Building Department?
RECOMMENDATION
The Departments recommend approval.
BACKGROUND
The proposed resolution adjusts several fees on the Pueblo Regional Building Department's fee
schedule.
The fee for inspection of hotels, motels, and nursing homes is increased from fifty dollars ($50)
to one-hundred dollars ($100), which is still far below the actual cost of conducting these
inspections.
The fee for after-hours inspections is increased from thirty-five dollars ($35) per hour to fifty-five
dollars ($55) per hour, which is below the Regional Building Department's costs.
The fee for residential contract work is changed from a fee based on the contract price for the
work, to a fixed fee for each type of residential contract work. When the fees were based on the
contract price, contractors were required to provide a copy of the written contract to the Pueblo
Regional Building Department. Dispensing with this requirement will save time for both
contractors and Regional Building Department staff. The fixed fee for each type of residential
contract work is below the Regional Building Department's actual costs.
FINANCIAL IMPACT
The increased fees will produce additional revenue for the Regional Building Department.