HomeMy WebLinkAbout11845RESOLUTION NO. 11845
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN AN
AMOUNT NOT TO EXCEED $608,000.00 TO ASLAN CONSTRUCTION,
INC. FOR SECTION 4 — JRD WATER RECLAMATION FACILITY AMMONIA
AND NUTRIENT REMOVAL PROJECT, AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
WHEREAS, repairs to existing sanitary sewer lift stations are necessary in conjunction
with modifications at the James R. Dilorio Water Reclamation Facility, and;
WHEREAS the work was awarded to Aslan Construction. Inc.
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
A contract for repairs to existing sanitary sewer lift stations in conjunction with
modifications at the James R. Dilorio Water Reclamation Facility, Contract Agreement for
Section 4 — JRD Water Reclamation Facility Ammonia Removal Project with Aslan Construction,
Inc. (Project No. 10 -017; WWL01 D) be, and the same is hereby awarded to said bidder in an
amount not to exceed $608,000.00.
SECTION 2.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 3.
Funds for said project shall be paid from the Sewer User Fund, subject to
reimbursement from funds, if any, taken from the Project Loan Subaccount established under
the 2010 Series A Project Loan Agreement between the Colorado Water Resources and Power
Development Authority and The City acting by and through its Sewer Enterprise.
INTRODUCED: April 12, 2010
BY: Vera Ortegon
COUNCILPERSON
APPROVED:
RESIDENT CF CITY CC) UNCIL
ATTESTED BY:
GIB' Y CLERK
Background Paper for Proposed
RESOLUTION
DATE: April 12, 2010
AGENDA ITEM # M -2
DEPARTMENT: WASTEWATER
Gene Michael, Director
TITLE
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN AN AMOUNT NOT TO
EXCEED $608,000.00 TO ASLAN CONSTRUCTION, INC. FOR SECTION 4 — JRD WATER
RECLAMATION FACILITY AMMONIA AND NUTRIENT REMOVAL PROJECT, AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
ISSUE
Should the City Council approve an agreement in an amount not to exceed $608,000.00
with Aslan Construction, Inc. for repairs to existing sanitary sewer lift stations?
Approval of Resolution
BACKGROUND
The City of Pueblo operates eight sanitary sewer lift stations. Five of those lift stations
deliver wastewater from the Airport Industrial Park to the Water Reclamation Facility for
treatment. The Airport Industrial Park lift stations are 18 years old and are badly
corroded. The electrical control panels at these lift stations are obsolete and repair
parts can no longer be obtained. Repairs are needed to replace corroded valves, pipes,
and other metal parts, and the electrical control panels need to be replaced with modern
units.
Aslan Construction, Inc. was selected through a competitive bid process as the best and
lowest bidder. A copy of the bid summary sheet is attached.
FINANCIAL IMPACT
Funds for Section 4 — JRD Ammonia Removal Project (Project No. 10 -017, WWL01 D)
will be paid from the Sewer User Fund, which will be reimbursed from proceeds, if any,
of a Colorado Water Resources and Power Development Authority loan to the Sewer
Enterprise which have been credited to a Project Loan Subaccount for payment of
construction costs, with the loan repayment obligation being evidenced by the Sewer
Enterprise's 201 0A Series Bond.
BLACK & VEATCH
Building a world of difference'.
City of Pueblo, Colorado
.lames R. Dilorio Water Reclamation Facility
Ammonia and Nutrient Removal Project
Section 4 — Lift Station Renovations
B &V Project 165167
B &V File 11.1500
March 18, 2010
Mr. Gene Michael
Wastewater Director
City of Pueblo, Colorado
211 East D Street
Pueblo, CO 81003
Subject:
Recommendation for Award for Section 4 to
Asian Construction Company
Dear Gene:
At 10:30 am on March 10, 2010, bids for Section 4 of the Ammonia and Nutrient Removal
Project were publically opened arid read aloud by the City of Pueblo's (City) Purchasing
Department. A copy of the bid tabulation compiled by the City is attached.
The bid is for renovating four of the lift stations along Highway 50 near tine City of Pueblo
airpot. The ductile iron pipe in two of the lift station will be replaced. All of the electrical
equipment will be replaced at all of the lift stations. The ductile iron piping at two of the lift
stations will be sand blasted and repainted.
The apparent low bidder for the base bid and both alternatives is Asian Construction Company of
Berthoud. Colorado. Asian Construction Company is a small to mid- sized, Colorado -based
general contractor specializing in public utility work. The banking, bonding. insurance, and
project references checks for Aslan Construction Company indicate they have the experience,
personnel, equipment, financial resources, bonding capacity, and qualified subcontractor to
successfully complete all of the Section 4 scope of work. With respect to making good -faith
efforts to meet disadvantage business enterprise (DBE) goals, Aslan Construction Company sent
us a completed copy of DBE Solicitation Form A that is attached for reference. Sun Valley, the
electrical subcontractor, is listed as a WBE, indicating they qualify as a DBE.
Therefore it is recommended that the City award Section 4 to Asian Construction Company in
the amount of $608,000.00.
Black & Veatch Corporation 6300 S. Syracuse Way, Suite 300, Centennial, CO 80111 -6723 USA Telephones. 720 -834 -4200
Page 2
City of Pueblo, Colorado
Mr. Gene Michael
B &V Project 165157
March 18, 2010
If you have any questions regarding our evaluation of Aslan Construction Company's
qualifications to perform the Section 4 work, please call me at your earliest convenience. Thank
you for the opportunity to provide the engineering services for this project and we took forward
to working with the City and Aslan Construction Company refurbishing the lift station near the
airport.
Very truly yours,
BLACK & VEATCH
Mark J. Maxwell
Project Manager
DRS:sjm
Erclosures
cc: Mr. Michael Beck. CDPI -IE
Mr. Kerry Heide], Black & Veatch
Mr. T.R. Minard. Black & Veatch
PROJECT NAME: E1n Ma++.A tWp NV' , Ktr N'
�-
SECS aN 4 4 - Lrrr .TAT/
Subcontractor Name and
MBE or
Description of Work
Date of Phone Follow -up &
Amount of Bid or
Bid Accepted or Rejected'. Include
Telephone Number
WBE
Offered
Person Contacted
Reason
Reason for Rejection
for not uotin
$ter. Vw.i,LY r L✓w�r<s.
:3 tt `I� 1¢" 3�
WBL
c
GLLC�CiGAL
3 /E / -lo
6 ��/j��' - q�
ZN
yy��
ALCLon,jJ
tJ GIL oGCt�
t >�-w Fib LcKr...i�
3 I9I1a
�1 t�LO�ONS`�
['3't'o, 2,51 11131
M05. -.
q
C. �.C.GT2�AL
C,kt.s �PS0.i
CAP r LLC.CT O.-t�
3 /9/,e
C�l°l� 2��lsS
�
QUINTANA
lt-w [o rsSTQ„U -r \e+r
�ART�aw'o RY.
/ ry 4
3 J4 /16
e1 t7
t4 tL�,SPQIJ9
L3e3� �$�^ 3�t5
M�F
L4aot wmso�
LZPC_1L + 5—N-s [`X4P +PSI
�pe_Ttiwor
* 1 0
t �
P1a O�F..S ?0µSt
4C( I - - 4 2z�
M6 �,
'D P, .. �iACFf
�d L ,j %s�
�
�C- 4,C�t.IC.AL-
3 /Klla
[�Igl S'flo
w6�
SPN`aNT�t�
This information is true and correct to the best of my knowledge.
bL. MST "/afa)� - ZoG_ /Zd 6 JN A/� ✓E [ zd0� B£R7 he�J/ T1 3
Contra ar Name, tens ePhone Number T
Signature M.cy £� 0 4 py Title Date
Fax to Appropriate Project Administrator at (303) 7820390
Article 4
15
(97a) 35'v —lo-fo
Lase Rcvised: 12/09/09
J
t
City of Pueblo
Bid Summary
Page 1 of 1
Date: March 10, 2010 Time: 10:30 AM
Project No. 10 -017
RN Civil
Glacier
KR
Wildcat
Aslan
Project Name: Section 4 - JRD Water Reclamation Facility
Construction
Construction
Swerdfeger
Construction
Construction
Ammonia and Nutrient Removal Project
DESCRIPTION
;Furnish all labor, materials, necessary tools, and
,equipment and all utility and transportation service
necessary to perform and complete in a workmanlike
t imanner all of the work required in connection with the
i Lump Sum
;construction of the Dilorio Water Reclamation Facility,
$676,000.00
$622,900.00
$609,975.00
$719,135.00
$808,000.00
Ammonia and Nutrient Removal, Section 4 - Lift Station
(Renovation in accordance with the plans and
specifications as prepared.
Mandatory Submittals
yes
yes
yes
yes
yes
All prices as submitted— Evaluation Committee will determine if bidder has met bid requirements.