HomeMy WebLinkAbout11817RESOLUTION NO. 11817 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $120,330.82 TO SACCOMANO ENTERPRISES, INC., AND SETTING FORTH $24,000.00 FOR CONTINGENCIES AND ADDITIONAL WORK FOR PROJECT NO. 10 -022 (CD0902 - PHASE 2) A.D.A CURB RAMPS (CDBG) AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, proposals for PROJECT NO. 10 -022 (CD0902 - PHASE 2) A.D.A CURB RAMPS (CDBG) have been received and examined, and; WHEREAS, the proposal of SACCOMANO ENTERPRISES, INC., of Pueblo, Colorado was the lowest of those bids determined to be responsible; BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO. that: SECTION 1. A contract for PROJECT NO. 10 -022 (CD0902 - PHASE 2) A.D.A CURB RAMPS (CDBG) be, and the same is hereby awarded to said bidder in the amount of $120,330.82. SECTION 2. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. SECTION 4. Ramps. Contingencies and Additional Work .... $24,000.00 Funds for said project shall be from Project Code CD0902 — FY 2009 A.D.A Curb INTRODUCED: March 8, 2010 BY: Judy Weaver COUNCILPERSON APPROVED: RESIDENT CF CITY CC) UNCIL ATTESTED BY: CrrY CLERK Background Paper for Proposed RESOLUTION AGENDA ITEM # M-4 DATE: MARCH 8, 2010 DEPARTMENT: PUBLIC WORKS DEPARTMENT DIRECTOR — EARL WILKINSON, P.E. TITLE A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $120,330.82 TO SACCOMANO ENTERPRISES, INC., AND SETTING FORTH $24,000.00 FOR CONTINGENCIES AND ADDITIONAL WORK FOR PROJECT NO. 10 -022 (CD0902 — PHASE 2) A.D.A CURB RAMPS (CDBG) AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME ISSUE Should City Council award a construction contract for PROJECT NO. 10 -022 (CD0902 - PHASE 2) A.D.A CURB RAMPS (CDBG) to SACCOMANO ENTERPRISES, INC.? RECOMMENDATION Approval of this Resolution BACKGROUND This project will construct new A.D.A. curb ramps at 34 street corners at various locations citywide in the City's continuing effort to comply with the Americans with Disabilities Act (ADA). See attached Exhibit "A" for locations of the project. Attached is a bid summary sheet showing the results of competitive bids received for this project. FINANCIAL IMPACT Funds for this project will be paid from Project No. CD0902 - FY 2009 A.D.A CURB RAMPS. EXHIBIT "A" A.DA. CURB RAMPS (CDBG) PROJECT NO. 10 -022 (CD0902 - PHASE 2) LOCATION CORNERS BASE BID CLARK ST. & B ST. — NE, SE & SW CDR'S 3 HIGHLAND AVE. & ORMAN AVE. —NW, NE, SW & SE COR'S 4 JONES AVE. & EDEN AVE. —NW & NE CDR'S 2 14TH ST. & SANTA FE AVE. - SW & SE COR'S 2 BAYSTATE AVE. & WABASH AVE. —NW, NE, SW & SE CDR'S 4 4TH ST. & QUEENS AVE. —NW, NE, SW & SE COR'S 4 VANBUREN AVE. & VETA AVE. — NW, NE & SE CDR'S 3 12TH ST. & QUEENS AVE. —NW & NE CDR'S 2 BID ALT NO.1 12TH ST. & QUEENS AVE. - SW & SE COR'S 2 BID ALT NO.2 CHESTNUT DR. & SANDS DR. - NW & NE COR'S 2 BID ALT NO.3 CHESTNUT DR. & SANDS DR. - SW & SE CDR'S 2 BID ALT NO.4 CHESTNUT DR. & SOLAR DR. - NW & NE COR'S 2 BID ALT NO.5 CHESTNUT DR.& SOLAR DR. - SW & SE CDR'S 2 34 Corners City of Pueblo Rid Summary Pan. 1 n1 9 DATE, 02/ 17/10 TIME: 1 0:30:00 AM Shisler, Inc. Byerly & boulnern Colorado Cedar Ridge Saccomano - Project No.: 10.0 (CDD802 Phase 2) _ COMMODITY: A.D. Curb Ramps CDBG Cosyleon Inc Landscape, Inc. Enterprises, Inc. ITEM - DESCRIPTION_ Estimat OuentB - - Bea BId -- - 1 Remove Curb and Gutter 806 Lf. Uo4 P. 6o oco ---- -- 286 8m - _ 465 :..._- _Amount _ $ 8060 $_. 6,045.00 $ ..2, $ _ 4,83600 $ 3,747_.90 2 Remove Concrete 3421 sq, ft Umr 200 250 2W fso 1.ds - _ _ I Amount_ _ $ 6,842 00 $ 8,5 50 $ 842.00 $ 5,131.50 $ 5,986.75 3 Remove 7' Reinforced 10791 5 k U ttP (Concrete_ q' 350 350 __6 28 250 _ _ 275 L I Amount _ $ 3,776 50 3776 50 3 0 85 94 $ 2 697 50_ $_ 2 967.25 300 _ 050 175_ 4 Remove Asphalt 2750 sq ft. H Unit Price 300 _ 150 ..._. _ -..__ _Amount $ 8,274.00 $ 8,L74.00 $ 1,379,00 $ 4,137.00 $ 4 826.50 - Ono Price 5 Const Curb Head 179 I.J. 1500 195_0 700 _ 1300 10.50 _. Amount § _2 085 00 $ $__1,25300 $ _ 2,327.00 $ 187950 - IBW 6 .. Construct Curb and Gutter 791 If Uml Prico 1975 17.10 1600_ 16.25 ?mount $ 1423800 $ 11,86725_ $ 1352670 $__12,656 $ 1 7 Const 4' Concrete 2918 Sq. ft. Unit Pace 3 W 325 290 - 340 369 _... ,Amount _. $ 8754110 $ 9.483.50 $ 846220 $ S 1076742 UM Pr 8 Cons[. 6' Concrete 1825 tt �' 330 425 _ 365 385_ - - - -- 4.24 _ _ _ I Amount__ $ 602_ 250 $ 7,75625 $ 5_ 702625 S 773800 Constct? Re B rumfor ced 15851 sq. 0e4P6 5m 6W _666125 55 4 600 575 _.,. Concrete_ _..., Amount $ 7,92 $9,51000 § 6780.90 $ _�_ 951000, $_ 9,113.75 10 Construct 2' Asphalt Patch 146 sq. ft _um voce 600 em 343 4255 350 876 DO $ y168 00 $ 500 78 $ 620.50 $ 511.00 Unrt Price 1 onstruct 6' Asphalt Patch 2107 sq.fl 7m 470 _- 5]2 BW 500 u Amcurn__ $ 14,749.00 $,.___ %902 90 $ ,.12,052 04 $ 12,642 00. $ 10,535 00 12 R810Ca[e Fence 47 Lf. Unit Pnca 3000 6000 24.00 20.00 6 .50 Amount 1,410.01) $ 2820 $ _ 1 128.00 $ 940.00 634.50 2' %4 T3C[Ie Band I 47 1 ea Unii Price 13 __.. 30000 _ 27500 30000 2950 _$ 275 - ,Install - ;Amount .,,,,_ $ _ 14,10000 $ 72925.00 _ $ 1410000 _ $_ 13665.00 $ 12,925.00 14 Install 2X6' Tactile Bantl 1 gg Unit Price 37 500 315_X_ _ 45000 390.00 435.00 S 375 00 7500 $ 315 00 25m $ 45000 1750 390.00 so o0 _$_ 435 .00 sp oo .Amount _ 15 Subgrade Stabilization 31 ton - unii Arice $ 232500 $ 77 500 $ 54250 _ S 93000 $ 930.00 Amount 16 Traffic Control 1 I Lump 1 Uret Price MWO _ 200 00 5f5000 z9mX 30 00 00 Sum Amou $ 600000 $ 2,500.00 $ 90Q .D0 $ 3000.00 17 Mobilization t Lump a 011 Pike _- 48WM ...... 200000 ._5,15000 _ 70]000 _ 365000 , ._.. ._ 261 S UM G rand Total fl 11,212.00 100,068.40 S93,288.87 94,179.5 $91,516.85 Bi d Alternate No 1818 Remove Curb and Gutter 47 Lf, Unit Price _ ON 95 - z86 _ fi00_ 465 Amount $ 470 00 $ _446 50 $ __ 134 42 $ 282.00 $ 218.55 19 Remove Concrete 298 sq. 11 unit win - .__ 200 _ 3 - 694.00 _ 200 _ 150 195 I Amo unt $ 598.00 $ _ $ 596.00 - _ 447 DO $ 581.10 20 Remove Asphalt 108 sq. ft. UnrP 3W 32 050 __ 150 1.95 $ 2 Amount $ 324.00 $ 351,00 $ 00 $ 16200 UM Price 21 Construct Curb and Gutter 47 1 L1. - lam - - 1550 -- 1]10 firm -- - 16,K ....... _.._ - 1._._....._ .Amount $ _ - 84 600 $ ,,..._72850 $ ....,, 80370_ $ $ _ 794.30_ 22 Cons[. 4" Concrete 270 sq. ft Uml Price 300 - _ 4.00 2.90 340 3 X _ ,__ -.. Amount $ 81000 $ 1,0_8000 $ 78300 $ 91800 $ 1,05300 2 3 Const 6' Concrete 164 sq. ft. unit Prke am 525 36 5 _ 385 _ 450 Amount $ 541.20 $ 86 1.00 $ 598.60 $ 631.40 $ 738 00 24 Construct 6'ASphalt Patch 146 sq.k 110 Pkc 700 600 siz 606 500 .Amount_,_,_ $ 1,02200 . __87600 $ 835.12 $_ 87600 $ 73000 25 Install 2'x4' Tactile Band 4 _, Umt Price 30000 35000 _� 30300 29000 2WW ire. Amo unt_ . $ 1,20000 $ 1,40000 $ ,1200.00 $ 178000 $_ 1,160.00 26 Subgrade Stabilization 2 ',. ton Unit Price ism _ 3500 1750 3000 so oo !_Amount -' I $ 15 $ 7000 $_.,. 3500 $.,,. 60_00 80.00_ 27 Traffic Control 1 ,. Lump i Unit P&O 05000 1500.00 105000 466W _ _ 275.00 Sum 1 Amount $ 65000 $ 1,50000 $ 1 05000 $ 40000 $_ 275.00 28 Mobilization 1 LdmP umr Price 40000 iXOW _ 51200 22754 oast G rand Total Bid Alternate No 7 9T,dV91O $9 20700 $6,601.84 $5,915.9 5 995.18 Bid Alternate No. 2 29 Remove Curb and Gutter 49 If. Unit Pxe 10X 950 _ _ 266 _ _ 6.00 4.65 -, .__.._ .___,__.. .,._.Amoun[,_. $ ..,_49000 $ .465.50 $ 14014 _$ 29400 S_ 227.85_ 30 Remove Concrete 238 sq. ft unlr Price 200 300 zX Ise - 1.96 _.. _ _ , . $ 476.00 $ 00 $ 476.00 57 00_ $_ 357.00 S_ 46 4.10 Remover Reinforced Unid P rke 350 ._714 400 -__.. 286 250 8.20 31 57 a k. _ !Concrete q ' Amount $ 19950 $ ._22800 _ $ 163.02 $ 14250 $_ 35340,. 32 ( Remove Asphalt 109 sq. ft. umr Price 3W 3.25 0 .56 Ls0 1.85 _....._.._. _ __! Amount $ 327 00 $ 35 4.25 � 54 50 $ 163 50 $_ 212.55_ 33 Const. 6" Curb Head 40 Lf. unit Fnce - ism _ 1s 700 _ 13.0 X125 Amount_.. $ 6Otim IoW $ - ,__64000 )575 $._.,_ ~28000 1710 $ 520.00 f6W _ $_ 450,00 I&X 34 Construct Curb and Gutter 49 1.1. - ( it Pnce Amount S 88200 $ ,_ $ 837,90 $ $ 828.10 35 Const. 4" Concrete 87 Unit Price sq'k 9 00 . 9.50 _ 290 3.40 3. W_ iAmount 26100 S _ 39150 $ 252.30 _ 36 Const. 6" Concrete 190 fI Unif Pik_B �_' 3.20 5.25. _ _ 365 _. 3&5 _ _ - 4.50 _ _ Amount_ 7' Reinforced - Unit Price $ 608 00 500 $ 89 50 650 $ _ 693 50 554 `, __ r e ^ 50 6.W $ 855. 6.20 37 �on6lruCt 57 f[ �'_ _... Concrete_ ._ Amount .. _28500 A $ _ 315.78 $ $_ 38 Construct 6' Asphalt Patch i 109 ' sq. ft. Unll Piro TDO 6 00 57P 6W 5. W Amount_ 76300 $ 65400 $ 62348 _$_ 654.00 545.00 39 Jiustall 2X4'Tactile Band 2 ea Unit Pricy 30.0 35500 -- 3W W zWX _ NOW Amount 600.00 $ $ 600.00 S 8o CO_ 58 0.00 35m 40 Subgrade Stabilization 3 10n Un t Price ]500 1750 30m _$, 30.00 I mount A $ 226 00 $05.00 $ 5z.50 _ $ 90.00 90.00 F 41 Traffic Control 1 Lump Un l Price 4m X iSW m _ 10 0.00 3X.00 _$ 2]5.00 Sum Amount 00 $ $ 1,50000 $,_105000 $ Lump Unil - ___ - 42 :Mobilization i 1 .400 - d00 m ^ 00 546 W . 225 16221 q nit - - -- - -.- Su m rand Total Bid Alternate No. 2 ­ 03 - 1 - 6 - 50 6 902.00 I Kpwiz Ss 476.30 $5 40.91 All prkes as submeled -- Evaluation C9mmlltee will determine if adder has met bid requirements. City of Pueblo Bid Summary Pace 2 of 2 DATE: 02/17/10 TIME. 10.30:00 AM ou ern Protect No 1 -022 (CD0902 Phase 2 )__ - Shisler , Inc. , Byerly & Colorado Cedar Ridge Saccomano COMMODITY A D.A. Curb Ramps CDBG . P ( .�. _ -� _ Cosyleon Inc. _ Construc don, Landscape, Inc. Enterprises, Inc. Alternate N o. Bid Alt erno.3 � - ...z. 43 Remove Curb and Gutter 146 '.. If. unit Pnce wW - -- 950_ _ 286 600 4.65 -. $_ 460.00 200 $ 437.00 3 W $_____131.56 200 _ $ 276.00 _ 1.50 _ $_ - -__ _ 213.90 1.95 ,Amount, 44 RBn10Ye Concrete 203 Sq. tt Unrt Prke - Amoun $ 406 00 $ 60 9.00 $_ 406,00 $� 304.50 $ 395.85 , Remove 7 el'n of reed 45 I H9 }t �' _ Unf Price 350 - _ 400 .,_ _ 286 250 620 Concrete _ Amount $ 206.50 $- - -.___ 236.00 fl _ 168.74 365 80 46 Remove Asphalt 104 i sq. ft. l- PHre - - Unit 300 3.25 _ 050 150 1.95 _ .._- _.. - ....�_..._.. _... -_ Amount 312.00 $ 338 00 52 06 $ - 00 $_ 202 80 1500 47 ''..Const. 6' Curb Head 26 '.. L. �- Und Pncs 16.25 _$__.__ ]a0 1300 - 11'25 ._.____♦Amount $ 39000 $ 42 250 $ $ _ 29.2_50_ 48 ICOnsINCt Curb and Gutter 46 I.J. -- Unit Pnce 1800 1575 17) 16.00 1690 Amount S 82860 $ _ 72450 $ 78660 $ 73600 _$_ 77740 49 'Const. 4' Concrete 61 sq. ft Umf Pc. 3 00 4- -_ 50 - - -- 29 0 - 340 3.90 - -- ,Amount $ 18300 S 4.5 _270 $ 17690 $ 0740 2, 237.90 50.. Const.6' Concrete 178 sq, ft ...,, Unit Price ..__--� _ 320 5.25 - 93 - 4.5 - 0 - ........ 365 3.A5 - $ . 4.50 Amount $ 569.66 $ $ 649.70 S 30 $ _ Construct TRelnfo Iced Unit Price 500 650 ___ 554 _685 600 _801.00 6.20 SO _ Concre �s Amount $ 250.00 $ 325.00 $ 277.00 $ 30000 $.. 52 Construct Asphalt Patch 180,,' sq. It. Unit Price - -- ]W - 600 - - 572 -- 600 - -- 500 _ _ _ 53 Install 2'x4' Tactile Band 2 ee. Amount Unit Price $ 1 120 00 30000 __ $ _ 960 00 . ass W $._ -_ ____ - -_ 915 20 300.00 S -_. 960 00 29000 $ __. .. 800.00 200 W i Amount $ 600 00 $ 710 00 $ 600.00 $ 580 00 $ 580 00 y _ _ 54 !Subgrade Stabilization i 3 ton unit Price 75W 3500 f 7 W --­ Amoum $ -___ 225 DO 400.00 $ 105 00 15WW $_ 52 50 -- _ 105000 _$_ 90.00 300.00 $ 90.00 55 ''. Traffic Control 1 Lump Unit Pric _ 2]500 Sum Amount $ 4_0 $ 1,60000 $ $ 30000 $ 275.00 58 Mobilization 1 � Umt Pnce OOOW 1WOW ___105000 54300 22600 160.26 Zl rana Mal B id Alternate No. 3 6,350.10 $8,576.00 $5,991.20 $5,305.70 $5,502.41 Bid Alternate No.4 57 Remove Curb and Gutter T57 I I f Uruf Price IOW 950 _ 2 B6 600 4.65 ! __,_,_ Amo unt $ 57000 $ _ 54150 $ 16302 S 34200 $ 26505 58 Remove Concrete 227 sq. ft `tiff Piro 200 3 W 200 _ _ I w - - -- 1 ss __,_- Amount $ 45 400 $ 68100 $ $_34050 442.65 Remove rced 7' Remfo 5 54 sq' f t. Und Price 350 400 _ _454.00 286 250 _$ 620 ,Concrete __. ! Amount, $ 18900 $ 21fi DO $ 15444 $ 60 Remove Asphalt 114 sq. ft Unif Pnce 300 325 050 1.50 195 - - -__ . Amount $ 342 00 $ -____ 3 $,_ _57.00 _$ 171.00_ $ -_!. 222.30_ 61 Const. 6' Curb Head 27 if. Unit Price - -- 15 - - 16.25 - -- lW - -- 1300 - 11.2 - Amoun[ $ 405- 00 $ 43875 $_ -- 18900 $ 3 $_ 303.75 62 iConstruct Curb and Gutter 56 LE Unit Price 1e00 _ 1575 17 f0 - 51.00 _ 1600 f6. _LAmount $ 1,008.00 $ _88200 $ - -___ 957.80 89600 $_ __946.00 63 Const. 4' Concrete 79 ',. sq. ft. � Unrt Pnce 3.00 _ 4.5C 2 W _$ ... 340 _ 3.91 .:.___ -.__ _.....__ __._.. Amount $ 23700 $ 35550 $ 22910 $ 26860 $_ 308.1 64 Const. 6' Concrete 183 sq. ft - Umf Pnce 320 _.- 525 365 _- 090 - 4.51 ] Amount $ 585.60 $ 960 75 $ 667 95 $ 71370 $ 823 50 65 Construct 7 ' Reintomed - __ y - _ s it. um- 500 _ sso 5sd - 8.21_ _ Concrete _ _ ... Amount $ 270.00 $ __ 29916 $ 0 00 0 $ 33480 66 'Construct 6' Asphalt Patch _ 123 sq. It. unit Price ]W _351 6.00 _$_ - - _ 572 - 600 e.w ._ -- ---- .___.. - ._. Amo unt, $ 86700 S -73800 $___703.56 73800 $ 61500 67 hostels 2x4' Tactile Band 2 � ea Unit Price - -_. 30000 - 35500 __.__ MW - , __. 2900 - _ _ 290.00 _.__ - - -._ gmount $ 600 00 S 710 00 $ 600 00 $.__ 580 0 0 $ 580.00 68 Stabilization 3 ton Am U nit ]SW 3500 __ n56 30.00___ _ 30 Do ] Subgrade _ - __. _ 69 TraHlc Control u 1 Lump - Unf Price $ 225 00 40000 $ 105.00 15000 $ -_ 52 50 _ 1 _$_. _ _ 90 00 40000 _ $ 90 DO 27500 - - - -^ 5 Amount $ 400.00 $ 1,500 00 $ 1 0500 0 $ 40000 27500 -- _ -- 70 ,Mobilization _um LUmp 1- UnRPrice 40000 - - - - -- noww ------ 54800 _ -- 232 - $ 14501 n Gran fe 510 No.4 8,546.80 $885000 $6,125.33 $558160 S5. b8636 . Al[ernate Bid Alternate No. 5 71 Remove Curb and Gutter 50 LL Unit Pr,� - 1000 - -- 900 286 600 4. 65 Amoupl S „- 500 00 $ -_ 475 00 $ , w 143 00 $ v� 300.00 -. $ 232.50 72 ,..Remove Concrete 221 sq. ft, lhwf Price -- ___,.,200 3 W - _ - Zoo 1.00 1.95 - _ Amount $ 44200 $ 66300 $ 442.00 $ $ 430.95 Remover Remforced 73 _ 80 sq. ft. Urxf Price _ 350 - ._ 400 286 __ 200 _ _ 620 .Concr v - -- Amount__. $ 21000_ $ 240.00 _$ 17160 $ - - - -, 150 00, $_ 372.00 74 jRemove Asphalt 111 sq. It Um" Pries - 300 -- 325 - - -. 0.50 I.W -- 1.95 I ..... Amount -. $. 333 00 $ _- - 360 75 $_ 55 50 $ __. - 111.00 _- $ 216.45 75 iCollst. 6" Curb Head 14 Lf. Unit PncB . 15.00 1625 7 00 13w 11.25 Amount $ 210 00 $ 227.50 $ _. 98.00 $ 182 00 76 Construct Curb and Gutter 50 I.f, Unit P, few 1575 1710 ---- 16.00 16.90 Amount S 90000 $ - 78750 $ ---- _85 &00 $ 64500 77 Const. 4 "Concrete 50 sq. 11' Unit Price 300 450 200 _ 34 390 A mount $ 150.00 $ 225 00 145.00 $ 170.00 $ 195.00 78 Const. 6'Concrete 1 176 sq. it Una Prim 320 525 _ _ 365 385 950_ _ 79 on crete 7 "Remforced 156 f t Amount Unit Price ___ $ _ 569 60 500 $ 934 50 650 $. 649.76 559 $ 685 30 600 $ 801 00 6.20 Concrete__ -- - - -___ i act' Amount $ 780.00 $ 101400 $__ _ 86424 $ ..,_ 93600 $ 96720 Construes 6' Asphalt Patch 111 sq. l[ _.. U nit 600 5.]2 c $ 7 7700 00 300 W $66 600 355.00 $6 ,__,_. 3492 3 0000 - _66.00_ $. _ 6 0_ 275.W 0 555.00_ 290.00_ ;Construct Amountnt 81 Install 2'x4' Tactile Band 2 ea. Unif Pnce ' - IAmqunt $ ..... -._ 00 $ 710. $_- 600 00 $ 550 00 580 00 82 '.,Subgrade Stabilization 3 ''�., ton Una Price 7500 3500 Q.50 __ 3060_ _$ _ - , 30.00 Amount $ 225 00 $ - 05 .00 $_ „. 52 50 $ 90 00 0 $_ 90.0_0_ 83 Traffic Control 1 Lump Umf Pnce 40000 fSW.W 10500 _ 30000 _ 215.00 __ _ Sum ,Amo S 409 $ - 1,50000 $_ _1105000 $ 30000 275.00 84 Mobilization 1 { Lump Umt Price I 400.00 IIX)0 W 55300 -- _ 23600 _$ Ilf 5? ran t l Bid Alternate NO, 5 56,496.60 1 $8,908.25 1 §6,314.46 $5.397.30 1 SSA$9.13 All Prices as submitted - Evaluation Comminee will determine if N&Jar has met Ud requirements.