HomeMy WebLinkAbout11793RESOLUTION NO. 11793
A RESOLUTION AWARDING A PROFESSIONAL ENGINEERING SERVICES
AGREEMENT IN THE AMOUNT OF $9500.00 TO ANSELMO ENGINEERING, INC.
AND SETTING FORTH $1000.00 IN CONTINGENCIES FOR PROJECT NO 09 -048A
(SW0401) STORM SEWER IMPROVEMENTS ON PUEBLO BOULEVARD NEAR
ASTER AND ON FAIRFIELD AT ASTER, AND AUTHORIZING THE PRESIDENT OF
THE CITY COUNCIL TO EXECUTE SAME
WHEREAS, proposals for Project No. 09 -48A (SW0401) Storm Sewer
Improvements Pueblo Blvd- Aster - Fairfield (Engineering Services) - have been received
and examined, and;
WHEREAS, the proposal of ANSELMO ENGINEERING, INC. was the lowest of
those bids determined to be responsible;
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
A contract for the Project No. 09 -48A (SW0401) Storm Sewer Improvements
Pueblo Blvd- Aster - Fairfield (Engineering Services) be awarded to said bidder in the
amount of $9500.00. Professional engineering services include (but not limited to)
design drawings, construction specifications, and contract bid documents for the
referenced project.
SFrTinN 9
The Purchasing Agent is hereby authorized to execute said contract on behalf of
Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City
thereto and attest the same.
SECTION 3.
In addition to the amount of the bid set forth, as aforementioned, an additional
amount as stipulated in this section is hereby established for contingencies and
additional work.
Contingencies and Additional Work .....$1000.00
SECTION 4.
Funds for said project will come from Project No. 09 -48A (SW0401), "Stormwater
System, Aster /Pueblo Blvd, 2008 ".
INTRODUCED: January 25, 2010
BY: Vera Ortegon
COUNCILPERSON
APPROVED:
RESIDENT CF CITY CC) UNCIL
ATTESTED BY:
GIB' Y CLERK
Background Paper for Proposed
RESOLUTION
DATE: January 25, 2010
DEPARTMENT: Stormwater Management
Earl Wilkinson, P.E.
TITLE
AGENDA ITEM # M -3
A RESOLUTION AWARDING A PROFESSIONAL ENGINEERING SERVICES
AGREEMENT IN THE AMOUNT OF $9500.00 TO ANSELMO ENGINEERING, INC.
AND SETTING FORTH $1000.00 IN CONTINGENCIES FOR PROJECT NO 09 -048A
(SW0401) STORM SEWER IMPROVEMENTS ON PUEBLO BOULEVARD NEAR
ASTER AND ON FAIRFIELD AT ASTER, AND AUTHORIZING THE PRESIDENT OF
THE CITY COUNCIL TO EXECUTE SAME
ISSUE
Should City Council award a Professional Engineering Services Agreement in the
amount of $9500.00 to Anselmo Engineering, Inc. and setting forth $1000.00 in
contingencies for Project No. 09 -048A (SW0401) Storm Sewer improvements on
Pueblo Boulevard near Aster and on Fairfield? Professional Engineering Services
include (but are not limited to) design drawings, construction specifications, and contract
bid documents for the referenced project.
RECOMMENDATION
Approval of this Resolution
BACKGROUND
The proposed storm sewer system would extend the newly constructed drainage
improvements in the Lowe's Commercial Site upstream (west), on Pueblo Boulevard to
Azalea and on Fairfield upstream (west), to Aster. Said storm sewer improvements will
alleviate flooding issues on Pueblo Boulevard at Azalea and at Aster, and on Fairfield at
Aster. This project will be funded from the Storm Water Enterprise for $10,500.
Attached is a bid summary showing the results of competitive bids on this project.
FINANCIAL IMPACT
Funding for this project will come from the Stormwater Enterprise Fund.