HomeMy WebLinkAbout11761RESOLUTION NO. 11761
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$31,497.50 TO PARKER EXCAVATING, INC., FOR SANITARY SEWER POINT
REPAIR IN THE ALLEY BETWEEN 8 TH & 9TH STREETS, NORWOOD- OGDEN, AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1 -10 -5 of the Pueblo Municipal Code, and;
WHEREAS the emergency repair work was awarded to Parker Excavating, Inc.
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
A contract to repair the sanitary sewer in the alley between 8th & 9th Streets, Norwood -
Ogden, Contract Agreement for Sanitary Sewer Repair with Parker Excavating, Inc. (Project No.
09 -002; WWAN01) be, and the same is hereby awarded to said bidder in the amount of
$31,497.50.
SECTION 2.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 3.
Funds for said project shall be from the Sewer User Fund.
INTRODUCED: December 14, 2009
f:W
Randy Thurston
COUNCILPERSON
APPR t)' } �.
PRESIDENTof City Council
ATTESTEC? BY:
CITY CLERK
L) 4
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # M -6
DATE: DECEMBER 14, 2009
DEPARTMENT: WASTEWATER DEPARTMENT
GENE MICHAEL, DIRECTOR
TITLE
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$31,497.50 TO PARKER EXCAVATING, INC., FOR SANITARY SEWER POINT
REPAIR IN THE ALLEY BETWEEN 8 TH & 9TH STREETS, NORWOOD- OGDEN, AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
ISSUE
Should the City Council award a construction contract in the amount of $31,497.50
Parker Excavating, Inc., for emergency sanitary sewer repair in the Alley between 8 t " &
9 Streets, Norwood - Ogden.
Approve this Resolution.
BACKGROUND
In the fall of 2009, the Wastewater Department became aware of a badly deteriorated
sanitary sewer main in the Alley between 8 & 9 t " Streets, from Norwood Avenue to
Ogden Avenue. Television inspection revealed severe sags with holes created the
potential for an overflow. The sewer main is more than 50 years old and required
immediate rehabilitation. The quote for the unit prices for the work by Parker
Excavating, Inc. is attached. This work was done as an emergency under the Sanitary
Sewer Point Repair multi -year contract under which six contractors were qualified via
competitive bid. During the project the costs were reduced by actual field quantities as
noted on the attached change order.
The cost breakdown for the project is as follows:
Sewer Replacement - related
Sewer pipe replacement ....
............................... $18,750.00
Manhole replacement ...........
............................... $3,995.00
Reinstate Services ...............
............................... $4,500.00
Bypass Pumping ...................
............................... $1,000.00
Traffic control ........................
............................... $1,500.00
Mobilization ...........................
............................... $1,200.00
Subtotal ............... $30,945.00 (98%)
Surface Improvement - related
Millings ..................................... ............................... $552.50
Subtotal .................... $552.50 (2%)
TOTAL: ................. $31,497.50
FINANCIAL IMPACT
Funding for this project will come from the sanitary sewer rehabilitation budget funded
by the Sewer User Fund. Funding is available, and has been appropriated and
allocated to Project No. 09 -002 (WWAN01).
2009 and 2010 Sanitary Sewer Point Repair
Date 10120/2009
Project Number 09-002 (WWAN01)
Alley btn 8th & 9th
den - Norwood
With contingency $42,528.00
Parker
Spaccamonti
K. R. Swerdfecier
Pate Construction
Wildcat
Quality Pipe
Bid Item Description Bid Quantities lQuantitv
Total Price
Total Price
Total Price
Total Price
Total Price
Total Price
Remove and 1 -20 LF
$0.00
$0.00
$0.00
$0A0
$0.00
$0.00
replace 8" PVC
21 -100
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
1
pipe less than 8'
>100
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Remove and
1 -20
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
replace 8" PVC
21 -100
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
2
pipe less than 12'
>100
LF
325
$16,250.00
$14,625.00
$19,500.00
$29,250.00
$27,950.00
$73,125.00
Asphalt patch -4"
1 -20
LF
$0.001
0.00
1 0.001
$0.00
$0.001
0.00
Asphalt on 6" Class
21 -100
LF
so.001
$0.0ol
0.00
$0.00
$0.001
$0.00
3
6ABC
>100
LF
$0.00
$0.001
0.00
$0.00
$0.001
$0.00
Asphalt -6"
1 -20
LF
$0.00
0.001
0.00
$0.00
$0.00
$0.00
patch
Full Depth Asphalt
21-1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
4
0
LF
$0.00
$0.001
0.00
$0.00
$0.00
$0.00
Remove and
1 -20
SF
$0.00
$0.001
0.00
$0.00
$0.00
$0.00
replace 7"
21 -100
SF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
5
Reinforced
>100
SF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Remove and
1 -20
SF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
replace 6"
21 -100
SF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
6
Reinforced
>100
1 SF
1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Remove and
1 -20
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
replace standard
21 -100
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
7
curb & utter
>100
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Remove and
replace 48"
8
diameter manhole
1
Each
2
$7,990.00
$7,500.00
$8,400.00
$3,900.00
$5,500.00
$15,200.00
9
Reinstate Services
1
Each
20
$7,500.00
$6,080.00
$8,000.00
$12,000.001
$6,200.00
$5,000.00
Mobilization
Lump
10
1
Sum
1
$1,200.00
$800.00
$6,000.00
$1,550.00
$3,000.00
$4,500.00
Traffic Control
Cost+
li
1
15%
1
$1,500.00
$1,500.00
$1,500.00
$1,500.00
$1,500.00
$1,500.00
Bypass Pumping
Cost+
12
1
15%
1
$1,000.00
$1,000.00
$1.000.00
$1,000.00
$1,000.00
$1,000.00
13
Asphalt Impact Fee
1
Cost
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total
y:'�nswo,Y:0! .
$31, 505.00
$44,400.00
$49,200.001
$45,150.00
$100,325.00
With contingency $42,528.00
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number : CMO2 Change Order No.: ONE 11/20/2008
Page 1 of 1
Project Name : SANITARY SEWER POINT REPAIR 8TH /OGDEN
Contractor: PARKER EXCAVATING, INC.
You are hereby requested to comply with the following changes from the plans & specifications:
Bid Item Description of Changes
Decrease
Increase
No.
Contract By
Contract B
1 Remove & Replace 8" VCP
$2,500.00
2 Remove & Replace 48" Manhole
($3,995.00)
3 Reinstate Sanitary Services
($3,000.00)
8 Millings
$552.50
TOTAL Decrease l Increase
$8,995.00
$3,052.50
Net Adjustment This Change Order $
(3,942.50)
Amount of Previous Change Order(s) $
0.00
Original Contract Amount $
35,440.00
Total Adjusted Contract Amount To Date $
31,497.50
Reason For Change: Actual Field Quantities,
Extra Work required to complete project
The time provided for completion of the contract is unchanged by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply
hereto.
Prepared by: Date:
Associate Engineer II
Reviewed by: Date:
Wastewater Engineering Supervisor
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of wastewater
FORM COIDOA299
CONTRACT AGREEMENT
For
Emergency Sanitary Sewer Repair
THIS AGREEMENT made and entered into this 27th day of October, 2009, by and between the City of
Pueblo, a Municipal Corporation, hereinafter referred to in the Contract Documents as the " City ", and Parker
Excavating Inc., referred to in the Contract Documents as " Contractor ".
W ITNESSETH: Inconsideration of the sum to be paid by the City to the Contractor at the time and in the
manner hereinafter provided, the said Contractor has agreed, and does hereby agree, to fumish all labor,
tools, equipment and material and to payfor all such items, and to construct complete in every detail, To -Wit:
Project No. 09 -002 (W WAN01)
FY2009 and 2010 Sanitary Sewer Point Repair
VCP Pipe Replacement in Alley between 8 & e Sts, Norwood -Ogden
At the prices bid in Article 1.13. Request for Quotation form, in accordance with the drawings and
specifications, and all Contract Documents for this project which are on file and available for inspection in the
office of the Director of Wastewater, all to the satisfaction of the Director of Public Works for the City of
Pueblo, Colorado
AND FOR SAID CONSIDERATION IT IS FURTHER AGREED BYAND BETWEEN THE PARTIES TO
THIS AGREEMENT AS FOLLOWS:
1. Construction and installation of the above enumerated workforthe Cityshall be completed and ready
for use in accordance with the time of completion described in the Notice to Proceed for the Sub -
Project. This time shall be extended only for those periods set forth in the Contract Documents and
in accordance with the requirements of same.
2. The work and material for the Project covered by the Contract Documents shall be completely
installed and delivered to the City within the time above stated, clear and free from any and all liens,
claims and demands of any kind. Wherever in the Contract Documents the term "Project" is used, it
shall be taken to mean this Sub - project.
3. The full compensation to be paid to the Contractor by the City, pursuant to the terms of this Contract,
shall be payable as provided in the Contract Documents.
4. This Contract consists of the following component parts and documents, all of which taken together
constitute and are referred to as the Contract Documents, and the same are incorporated as part of
the Contract as if set out herein verbatim, whether the same have been attached hereto or not:
A. Request for Quotations
B. This Contract Agreement
C. General Conditions of the Contract — Article 3
D. Special Conditions
E. The Standard Constrvedoa SpeeZffeadoms and Standard
Deta/lsforCltfofPoeblo, Colorado, (most current edition in
effect on date of bid opening), are hereby included by
reference and all provisions thereof shall be applicable. By
submitting his bid, the Contractor acknowledges that he
possesses a copy of said document.
5. Title XII, Chapter 2, of the 1971 Code of Ordinances, City of Pueblo, adopted by Ordinance No. 3476,
and amended by Ordinance No. 4476 and 5229, shall be considered a part of this contract.
6. Title I, Chapter 8, of the 1971 Code of Ordinances, City of Pueblo, adopted by Ordinance No. 4479,
shall be considered a part of the contract.
7. All of the covenants and agreements set forth in the Contract Documents shall inure to the benefit of
and be binding upon City and Contractor and their respective heirs, legal successors and assigns
and shall be governed by the laws of the State of Colorado.
8. Payment and Performance Bonds will not be required for this project if the bid amount is less than
$50,000.00 (per §38 -26 -106, C.R.S.). Progress payments will not be made, and a single payment
all work will be made upon completion of the entire Project and verification is made that it has been
inspected and approved by authorized Wastewater personnel.
IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed in four (4)
original counterparts as of the day and year first above written.
PUEBLO, A MUNICIPAL CORPORATION
By
urchasing Agent
ATTEST:
City Clerk
BALAN�'�F' FPROP ATION EXISTS FOR
THIS ONTRA T UNDS ARE AVAILABLE:
Finance
h- • • •0 '1
Title ff , r.
ARTICLE 1
B. REQUEST FOR QUOTATIONS
PROJECT NO.: 09 -002 ( WWAN01 )
PROJECT NAME: Point Repair— Alley between 8th & 9th Sts, Norwood -Ogden
All proposals are to be prepared on this form. All blank spaces must be correctly filled in where
indicated for each and every item for which a quantity is given, and the bidder must state the prices
(written in ink or typewritten) forwhich he proposes to do each item of the work contemplated orfumish
each item of the materials required.
The undersigned, having become familiar with the local conditions affecting the cost of the work,
and with the contract documents, including advertisement for bids, the form of proposal, the form of
contract, form of bond, special provisions of the contract, general provisions of the contract, etc., plans,
drawings and specifications, issued and attached to the contract documents on file in the office of the
Purchasing Agent, hereby proposes to furnish all of the labor, materials, necessary tools and
equipment and all utility and transportation service necessary to perform and complete in a
workmanlike manner all of the work required in connection with the construction of a Point Repair —
Alley between 8 & 9 Sts, Norwood -Ogden in accordance with the plans and specifications as
prepared by or forthe City of Pueblo, Colorado, for the sums set forth in the following bidding schedule:
BID ESTIMATED UNIT
ITEM DESCRIPTION QUANTITY PRICE AMOUNT
Alley between 8 & 9' Streets, Norwood -Ogden
1
Remove & Replace 8" PVC
325
LF
$ 50.00
$ 16,250.00
2
Install 48" Manhole
2
EA
$ 3,995.00
$ 7,990.00
3
Reinstate Services
20
EA
$ 375.00
$ 7,500.00
4
Mobilization
1
LS
$ 1,200.00
$ 1,200.00
5
Traffic Control (Cost +15 %)
1
LS
$ 1,500.00
$ 1,500.00
6
Bypass Pumping
1
LS
$ 1,000.00
$ 1,000.00
(Thirty -five thousand four hundred forty dollars and no cents
The Grand Total Bid shall be the basis for establishing the amount of the performance bond for
this contract. The total bid is based on quantities shown on the proposal form and on the dimensions
shown on the plans, and is subject to additions or reductions according to the actual construction
quantities as determined by the Engineer upon completion of the construction.
The City reserves the right to adjust the required quantities and the contractor shall furnish said
quantities at the unit price quoted above. The time allowed for construction shall be adjusted in direct
proportion of the adjusted quantities to the estimated quantities.
The undersigned has carefully checked the above quantities against the plans and specifications
before preparing this proposal and accepts the said quantities as substantially correct, both as to
Page 1 of 2
C- MTI- B;1 -13 -2003
classification and amount, and as correctly listing the work to be done in accordance with the plans and
specifications.
The bidder must sign his proposal correctly and in ink; if the proposal is offered by an individual,
his name, office and post office address must be shown. If made by a firm or partnership, the name,
office and post office address of each member of the firm or partnership must be given; if offered by a
corporation, the person signing the proposal must give the name of the state under the laws of which
the corporation was chartered, and the name, title and business address of the President, Secretary
and the Treasurer. Anyone signing a proposal as agent must file legal evidence of his authority to do
so, and that the signature is binding upon the firm or corporation.
The undersigned, if awarded the contract, agrees to complete and file the complete contract and
performance bond in quadruplicate within ten (10) days of the date of Notice of Award, and further
agrees to complete the work within thirty -five (35) calendar days of Notice to Proceed.
Liquidated damages will be assessed in accordance with Section 3.54 of ARTICLE 3 -
GENERAL PROVISIONS, for every calendar day thereafter until the work is complete and accepted by
the City of Pueblo.
NOTE: Bidders should not add any conditions or qualifying statements to this bid as
otherwise the bid may be declared irregular as being not responsive to the
advertisement for bids.
The contractor shall be subject to all applicable City, County, State and
Federal Taxes in the performance of this contract.
Firm Name:
Business Address : /Sly I D-mC 1 -
(D a/o D�
92
Title
Date: /O /� $�Dq Tale. No.
: 7/9-x/5 - 30/D
Fax No.: —219 _ J -/ J D�US
Contractor's Federal I.D. Number: 012 764
Page 2 of 2
C- ARTI- B;1 -13 -2003