HomeMy WebLinkAbout11642RESOLUTION NO. 11642
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$5,668.00 TO SPACCAMONTI EXCAVATING, INC., AND SETTING FORTH $1,133.60
FOR CONTINGENCIES, FOR SANITARY SEWER POINT REPAIRS IN THE 1500
BLOCK OF HOOPER AVENUE, AND AUTHORIZING THE PURCHASING AGENT TO
EXECUTE THE SAME
WHEREAS, a sanitary sewer point repair in the 1500 block of Hooper Avenue is
needed to repair a sanitary sewer manhole, and;
WHEREAS the point repair work was awarded to Spaccamonti Excavating, Inc.
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
A contract to repair the sanitary sewer manhole in the 1500 Block of Hooper
Avenue, Contract Agreement for Sanitary Sewer Repair with Spaccamonti Excavating,
Inc. (Project No. 09 -002; WWAN01) be, and the same is hereby awarded to said bidder
in the amount of $5,668.00.
RFr.TinNV 9
The Purchasing Agent is hereby authorized to execute said contract on behalf of
Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City
thereto and attest the same.
SECTION 3.
In addition to the amount of the bid set forth, as aforementioned, an additional
amount as stipulated in this section is hereby established for contingencies and
additional work.
Contingencies and Additional Work......... $1,133.60
SECTION 4.
Funds for said project shall be from the Sewer User Fund.
INTRODUCED: July 13, 2009
BY: Barbara Vidmar
COUNCILPERSON
a PPP 0'_
PRESI DENT-of CARY Cauneil
Y CLERK
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # 4
DATE: JULY 13, 2009
DEPARTMENT: WASTEWATER DEPARTMENT
GENE MICHAEL, DIRECTOR
TITLE
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$5,668.00 TO SPACCAMONTI EXCAVATING, INC., AND SETTING FORTH $1,133.60
FOR CONTINGENCIES, FOR SANITARY SEWER POINT REPAIRS IN THE 1500
BLOCK OF HOOPER AVENUE, AND AUTHORIZING THE PURCHASING AGENT TO
EXECUTE THE SAME
ISSUE
Should the City Council award a construction contract in the amount of $5,668.00 to
Spaccamonti Excavating, Inc., for sanitary sewer point repair in the in the 1500 block of
Hooper Avenue?
RECOMMENDATION
Approve this Resolution.
BACKGROUND
On June 24 of 2009, the Wastewater Department became aware of a badly degraded
manhole in the 1500 block of Hooper Avenue. Crew inspection revealed a manhole
with a missing base and could potentially cause a sanitary sewer backup. The sewer
manhole is between 40 -60 years old and requires immediate rehabilitation. The quote
for the unit prices for the work by Spaccamonti Excavating, Inc. is attached. This work is
being done as a point repair under the Sanitary Sewer Point Repair multi -year contract
under which six contractors were qualified via competitive bid.
The cost breakdown for the project is as follows:
Sewer Replacement - related
Mobilization ... ............................... ........................$800.00
Sewer pipe replacement ..... ............................... $1,118.00
Manhole Replacement ................ ......................
Subtotal: ................ $5,668.00 (100%)
Surface Improvement - related
Subtotal: ....................... $0.00 (0%)
TOTAL: .................. $5,668.00
FINANCIAL IMPACT
Funding for this project will come from the sanitary sewer rehabilitation budget funded
by the Sewer User Fund. Funding is available, and has been appropriated and
allocated to Project No. 09 -002 (WWAN01).
2009 and 2010 Sanitary Sewer Point Repair
Manhole at Hood Street
Date 6/2212009
Project Number 09 -002 (VWVAN01)
Bid Item Description Bid Quantities Quaritt
Remove and 1 -20 LF
replace 8" PVC 21 -100 LF 26
1 pipe less than 8' >100 LF
Parker Excavating,
Total Price
$0.00
S accamonti
Total Price
$0.00
K. R. Swerdfe er
Total Price
$0.00
Pate Construction
Total Price
$0.00
Wildcat
Total Price
$0.00
Quality Pipe
Total Price
$0.00
$1,300.00
$1,118.00
$1,560.00
$2,600.00
$3,250.00
$7,800.00.
$0.00
0.001
$0.001
$0.00
$0.001
0.00
2 1
Remove and
replace 8" PVC
pipe less than
1 -20
LF 1 .
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
21 -100
LF
$0.00.
$0.001
$0.00 '
$0.001
$0.00
$0.00
>100
LF
$0.00
$0.00:
$0.00
$0.001
$0.00'
$0.00
3
Asphalt patch -
4" Asphalt on 6"
Class 6 ABC
1 -20
LF
$0.00
$0.001
$0.00:
0.001
$0.00'
$0.00
21 -100
LF
$0.00:
$0.001
$0.001,
$0.00
$0.00
>100
LF
$0.00
$0.001
$0.00
$0.001
$0.00
$0.00
4
Asphalt patch -
6" Full Depth
Asphalt
: 1 -20
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
21 -100
LF
$0.001
$0.00
$0.00
$0.00
$0.00
$0.00
>100
LF
$0.001
$0.00
$0.001
$0.00
$0.00
$0.00
5
Remove and
replace 7"
Reinforced
1 -20
SF
$0.00
$0.00.
$0.00
$0.00
$0.00
$0.00
21 -100
SF
1
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
>100
SF
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
6
Remove and
replace 6"
1 Reinforced
1 -20
SF
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
21 -100
SF
$0.00
$0.001
$0.00
$0.00
$0.00
$0.00
>100
SF
1
$0.00
$0.00
$0.00
$0.00:
$0.00
$0.00
7
Remove and
replace
standard curb W
1 -20
LF
1 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
21 -100
LF
$0.00
$0.00
$0.00
$0.00:
$0.00
$0.00
>100
LF
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00:
8
Remove and
replace 48"
diameter
manhole
1
Each
1
$3,995.00
$3,750.00
$4,200.00
$1,950.00
$2,750.00
$7,600.00
9
Reinstate
Services
1
Each
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
10
Mobilization
1
Lump
Sum
1
$1,200.00
$800.00.
$6,000.00
$1,550.00
$3,000.00
; $4,500.00
11
Traffic Control
1
!15% +
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
12
Bypass
Pumping
1
Cost +
15%
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
13.
Asphalt Impact
Fee
1
Cost +
15%
Total
$0.00
$6,495.00
$0.00
- $5,668:00
$0.00
$11,760.00
$0.00
$6,100.00
$0.00:
$9,000.00
$0.00
$19,900.00
v.vru I %,v1 nu SUVI wy ww,vv ..ww