HomeMy WebLinkAbout11559RESOLUTION NO. 11559
A RESOLUTION AUTHORIZING THE TRANSFER OF $30,000
FROM PROJECT NO. CPAN17 — GRANT MATCHES
(LOTTERY) FUND FOR THE REPAIR OF THE MINERAL
PALACE PARK POOL
WHEREAS, the Mineral Palace Park Pool ( "Pool') is owned by the City of
Pueblo, and;
WHEREAS, the Pool utilizes a filter water supply system that is corroded and
leaking excessively, and;
WHEREAS, it is necessary to repair the leaks to prevent additional damage to
the pool and to reduce water use,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
An Engineer's estimate in the approximate amount of $30,000 has been prepared for
the cost of the repair work to pool.
SECTION 2.
$30,000 is hereby transferred from Project No. CPAN17 Grant Matches (Lottery) Fund
to Project No. CP0909 — Mineral Palace Park Pool Repair.
SECTION 3.
The Parks Department, with assistance from the Public Works — Engineering, Streets,
and Public Buildings Divisions, will be performing the majority the work with the
exception of the concrete deck replacement. The Public Works Department will be
soliciting competitive bids from local contractors to perform this portion of the repair
work.
SECTION 4.
This Resolution shall become effective upon final passage and approval.
INTRODUCED: March 23, 2009
7
Judy Weaver
Councilperson
APPR D' } �-
PRESIDENTaf Cfty Council
A77TSTED DY:
CITY CLERK
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # 12
DATE: MARCH 23, 2009
DEPARTMENT: PUBLIC WORKS
INTERIM DIRECTOR — MICKEY BEYER, P.E.
TITLE
A RESOLUTION AUTHORIZING THE TRANSFER OF $30,000 FROM PROJECT NO.
CPAN17 — GRANT MATCHES (LOTTERY) FUND FOR THE REPAIR OF THE
MINERAL PALACE PARK POOL
ISSUE
Should City Council authorize the transfer of $30,000 from the Grant Matches (Lottery)
Fund into the Capital Improvement Fund for the purpose of establishing a project to
repair the Mineral Palace Park pool.
RECOMMENDATION
Approval of this Resolution
BACKGROUND
The Mineral Palace Park Pool is currently being serviced by a 40 -year old water supply
system that has many leaks and much corrosion. The pool is currently losing one
million gallons of water per month while in operation. The transfer of funds will allow for
the replacement of the recirculating water supply piping and associated surface
improvements.
FINANCIAL IMPACT
Funds in the amount of $30,000 shall be transferred from Project No. CPAN17 into
Project No. CP0909 — Mineral Palace Pool Repair.