HomeMy WebLinkAbout11242RESOLUTION NO. 11242 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $1,697,205.00 TO PATE CONSTRUCTION CO., INC., AND SETTING FORTH $340,000.00 FOR CONTINGENCIES, FOR THE NORTHERN INTERCEPTOR REPLACEMENT PHASE I AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, competitive bids for the Project No. 08 -021 (WW0704), Northern Interceptor Replacement Phase I have been received and examined, and; WHEREAS the proposal of Pate Construction Co., Inc. of Pueblo, Colorado was the lowest of those bids determined to be responsive; BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A contract to replace the Northern Interceptor specified in the drawings, Contract Agreement for Northern Interceptor Replacement Phase I with Pate Construction Co., Inc. (Project No. 08 -021; WW0804) be, and the same is hereby awarded to said bidder in the amount of $1,697,205.00. SECTION 2. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work ......... $340,000.00 SECTION 4. Funds for said project shall be from the Sanitary Sewer Collection System Improvement Fund. INTRODUCED March 24, 2008 BY Vera Ortegon Councilperson APPROVE Lim PPI`81f I T' i I L'I'll �11 �y1 ,II IM Background Paper for Proposed RESOLUTION DATE: March 24, 2008 DEPARTMENT: WASTEWATER Gene Michael TITLE AGENDA ITEM # 5 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $1,697,205.00 TO PATE CONSTRUCTION CO., INC., AND SETTING FORTH $340,000.00 FOR CONTINGENCIES, FOR THE NORTHERN INTERCEPTOR REPLACEMENT PHASE I AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME ISSUE Should the City Council approve with Pate Construction Co., Inc. Replacement Phase I Project, RECOMMENDATION Approval of Resolution BACKGROUND an agreement in the amount of $1,697,205.00 for the Northern Sanitary Sewer Interceptor Development along the Interstate Highway 25 corridor in the northern area of Pueblo has led to significantly increased wastewater flows in the principal sanitary sewer interceptor serving the area, and it is anticipated that flows will continue to increase. A hydraulic "bottleneck" in the sanitary sewer main exists in an area south of Colorado Highway 47 along the 1 -25 frontage road. The sanitary sewer main needs to be upsized to accommodate both approved projects and projects currently in planning stages, and to avoid a building moratorium. A sanitary sewer interceptor within the 1 -25 frontage road alignment will carry wastewater flows from new developments. The first phase of construction must be accomplished in 2008 to ensure that current and future projects will be able receive sanitary sewer service. Because the project is driven directly by growth, it seems appropriate to fund both the design effort and construction from the Sanitary Sewer Collection System Improvements Fund ( "Fund "). Monies in the Fund are collected from sanitary sewer connection fees, and are intended to be used for growth- related capital projects approved by City Council. The proposal to use the Fund for the Project design and construction was presented to the Pueblo Planning and Zoning Commission on May 30, 2007, and the Commission made the recommendation that the proposal was an appropriate expenditure for the Fund. Documentation of that recommendation is attached. It does, however, remain the province solely of Council to approve projects using monies from the Fund, in accordance with § 16 -11 -4 of the Pueblo Municipal Code. A copy of the bid sheet and the agreement with Pate Construction Co., Inc., is also attached. This project was identified and funded in the Wastewater Department's capital budget for 2008. The cost breakdown for the project is as follows: Sewer Replacement - related Mobilization 25,800.00 Construction Surveying 7,250.00 Remove and Dispose Manhole 5,600.00 Abandon Manhole 13,500.00 Remove and Dispose Sewer Line 10,500.00 Abandon Sewer Line 6,105.00 Install Sewer Line 499,000.00 Trench Stabilization Material 300.00 Flowable Fill 12,750.00 Install Manhole 116,150.00 Trench Dewatering 3,575.00 Connect to Existing Manholes 16,600.00 Re- Establish Service Connections 625.00 Tunnel Crossings 520,350.00 Bypass Pumping 97,500.00 Traffic Control and Signage 51.000.00 Subtotal 1,383,650.00 (81.7%) Surface Improvement - related Asphalt Replacement 174,800.00 Optional 1 '' /i' Asphalt Overlay 41,800.00 Sidewalk Replacement 2,000.00 Curb and Gutter Replacement 9,000.00 Cross Pan Replacement 15,000.00 ADA Ramp 49,500.00 Site Restoration 18,500.00 Subtotal 310,600.00 (18.3%) Total 1,697,205.00 FINANCIAL IMPACT Funds for this project will be from the Sanitary Sewer Collection System Improvement Fund.