Loading...
HomeMy WebLinkAbout1111117 RES 09/28/2007 03:38:02 PM Pa Gilbert Ortiz Clerk Pueblo County, Co ■III K N71011FAIKAW N N N 11111 RESOLUTION NO. 11111 A RESOLUTION APPROVING AN EASEMENT BETWEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND COMCAST CABLEVISION, LLC, A COLORADO CORPORATION, AND AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE SAME BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1, The Easement between the City of Pueblo, a Municipal Corporation, and Comcast Cablevision, LLC, a Colorado Corporation, a copy of which is attached hereto, having been approved as to form by the City Attorney, is hereby approved. The President of City Council is authorized to execute and deliver the Easement in the name of the City. SECTION 2 . This Resolution shall become effective upon final passage and approval INTRODUCED: September 24, 2007 BY: Randy Thurston COUNCILM APPROVED: W PRE DEN F CITY COUNCIL ATTESTED BY: CITY CLERK Res. (it II Sol" Background Paper for Proposed RESOLUTION AGENDA ITEM # 7 DATE: SEPTEMBER 24, 2007 DEPARTMENT: PUBLIC WORKS DIRECTOR -DANIEL E. CENTA, P.E., TITLE A RESOLUTION APPROVING AN EASEMENT BETWEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND COMCAST CABLEVISION, LLC, A COLORADO CORPORATION AND AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE SAME ISSUE Should the City Council approve the granting of an easement to Comcast Cablevision, LLC, a Colorado Corporation, for the purpose of installing and maintaining a fiber optics communication system in Parcel "B" (drainage and utility purposes) of the Pueblo Memorial Airport Industrial Park Subdivision, Filing #4. RECOMMENDATION Approval of this Resolution BACKGROUND Comcast Cablevision, LLC, a Colorado Corporation, has requested a 10 -feet by 430 -feet (centerline) easement adjacent to other exclusive utility easements in Parcel `B" of the Pueblo Memorial Airport Industrial Park Subdivision, Filing #4, for the purpose of installing and maintaining fiber optics to provide telecommunication services. FINANCIAL IMPACT There is no financial impact to the City associated with the granting of this easement. 17 EASE 09/28/2007 03:38:02 PM Gilbert Ortiz Cle rT Puebla County, Co ■III K I.L WIWI11III EASEMENT AGREEMENT THIS EASEMENT is granted on September 24, 2007, by CITY OF PUEBLO, a Municipal Corporation, 41 City Hall Place, Pueblo, Colorado (Grantor), to COMCAST CABLEVISION, LLC (Grantee). W 1TNF,SSETH: Inconsideration of Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is acknowledged by Grantor, Grantor grants and conveys to Grantee, its successors and assigns, a 10 -foot by 430 -foot exclusive easement for the purpose of constructing, maintaining, installing and/or removing buried telecommunication utility cable upon Grantor's property situated in Pueblo County, Colorado, and described and shown in the attached Exhibits "A ", "B ", and "C" ( "Easement Area "). Grantee shall have the right of ingress and egress to and from the Easement Area during all periods of construction, maintenance, installation, reinforcement, repair and removal over and across Grantor's adjacent lands within Parcel `B ". Grantee shall repair any and all damage caused to Grantor's lands and improvements thereon by Grantee's use thereof. Grantor reserves the right to use the Easement Area for purposes not inconsistent with the rights granted in this Agreement. Grantee acknowledges Grantor's right to permit other public entities or utility companies use of the Easement Area jointly with the Grantee for utility purposes. Grantee shall indemnify, defend, and hold harmless the Grantor and its officers and employees from and against any and all claims, expenses (including reasonable attorney fees), liabilities, loss, or damage to property or injury to or death of persons, caused by or arising out of the construction, installation, maintenance, or use of the Easement Area and the easement hereby granted. If Grantee shall default in the performance of any of Grantee's covenants hereunder and such default shall remain uncorrected for sixty (60) days after written notice specifying the default is given to the Grantee by the Grantor, Grantor may terminate this easement. Upon such termination or the abandonment of this Easement, all rights, privileges and interests hereby granted to Grantee shall cancel and terminate and Grantee shall remove its property from the Easement Area and return same to its original condition. This Easement shall be deemed abandoned if the Easement Area is not used for its stated purpose for a period of twenty -four (24) consecutive months. Termination or abandonment of this Easement shall not release or discharge Grantee from its indemnification obligations hereunder. 1743622 EASE 09/28/2007 03:38:02 PM P il 8 bert Ortiz Cle Publ r r T eo County, Co mill K RN WI AWMI0111 II This easement shall run with the land and be binding upon and inure to the benefit of the Grantee and the Grantor and their respective successors and assigns. The singular includes the plural and the masculine includes the feminine and neuter. STATE OF COLORADO ) ss. COUNTY OF PUEBLO ) The foregoing instrument was acknowledged before me this 2y day of S-eptenr,her , zov by Jtk.dtA P. OM\je)r President of City Council, and Gina Dutcher, as d ity Clerk of Pueblo, a Municipal Cor orafi n P 4 .. `Witness my hand and official seal. ~. `;!- 8NIyebrnmissionexpires: li lZ'Ug n S� ` SUSAN M. BEERY Nota Public o I otaryPublic y GRANTOR: i 17 EASE 09/28/2007 03:38:02 PM Gi l6ert Ortiz Clerk/Recorder, o County, Co ■III K M«ERKMI N LM IIF111111 EXHIBIT A EXCLUSIVE UTILITY EASEMENT LAND DESCRIPTION An easement for exclusive utility purposes located in a portion of Parcel B in Pueblo Memorial Airport Industrial Park Subdivision, Filing No. 4 according to the recorded plat thereof as filed for record at Reception No. 1731695 in the Pueblo County records and located in a portion of Section 26, Township 20 South, Range 64 West of the 6"' P.M. in the County of Pueblo and State of Colorado being 10 feet in width, 5 feet on each side of the following described centerline: Considering the West line of the NW 1 /4 of Section 26, Township 20 South, Range 64 West of the 6"' P.M. to bear N, 01 0 2731" W., and all bearings contained herein being relative thereto. Commencing at the Wl/4 corner of Section 26, Township 20 South, Range 64 West said point also being on the West line of Parcel B in said Pueblo Memorial Airport Industrial Park Subdivision, Filing No. 4 thence N. 01 *2731" W. along the West line of said Parcel B, a distance of 582.85 feet to the North line of said Parcel B said point also being on the Southerly right -of -way line of William M. White Boulevard as presently located; thence S. 76 0 44'30" E., along the Southerly right -of -way line of said William M. White Boulevard a distance of 67.20 feet to the Point of Beginning; thence S. 01 E., a distance of 430.00 feet to the Point of Terminus. Prepared by: NORTHSTAR ENGINEERING AND SURVEYING, INC. 111 E. 5"' Street Pueblo, Colorado 81003 September 4, 2007 IN 07 033 00 Page 1 of 2 c NW CORNER, - 7 SEC77ON 26 • O O P.O.B. P.O.C. PCs �N 2• Q� : S76 44'30 E 6Z20'— I m 3 m N 3 N n NORTH LINE OF THE SOUTHEAST 114, SECTION 27, TOWNSHIP 20 SOUTH, RANGE 64 WEST W 114 CORNER SEC77ON 26 p EA:: R r.-.i ✓E: T r PRir' ,1PAL E r.,EPr, ^;Ar1 p R 12.6'. E D FOUND AXLE IN 12 X12" CONC. PAD FOUND 16 REBAR IN 12X12" CONC. BASE FOUND ,0 REBAR W /YELLOW PLAS77C CAP PLS NO. 34578 POINT OF BEGINNING POINT OF COMMENCEMENT ' O. Be SCALE: 1" = 200' 0 100' 200' 400' '�..f5012731 E l 430.00 10' COMCAST & UNITE EXCLUSIVE NETWORK EASEMENT ENCROACHMENT PERMIT SIGNED SEPTEMBER 13, 2007 SEE EXHIBIT C" PUc FLr� r•1EPORlA "C. A:PPEIPT i I IPUlUS T ?L PARk: t';/F.Dr�; r;; rr7Ay J F "ii.ir: rJi7. 1 I Ll_ II V_ —25' EASEMENT /SOUTHERN COLORADO POWER RECORDED IN BOOK 1294 AT PAGE 488 -50' EASEMENT TO COLORADO INTERSTATE GAS COMPANY. RECORDED IN BOOK 1708 AT PAGE 67, AND AMENDED RECORDED IN BOOK 2097 ' AT PAGE 308 Cam RIGHT -OF -WAY EASEMENT AS GRANTED TO COLORADO INTERSTATE GAS COMPANY IN BOOK 2368 AT PAGE 252 B Y NORTHSPAR ENGPaMMG AND SURVEYING, INC. NOTE: THIS EXHIBIT WAS NOT PREPARED AS A MONUMENTED LAND SURVEY, AND WAS ONLY PREPARED TO DEPICT THE ATTACHED LEGAL DESCRIPTION. V� Y� IL o N V a0 A rol3 ro n o� m mv BB N Y� C4 _J16 CO M LLI m u N w �; `o o Na " mum 1:mmnllW HTRMT 0703100 -FYHk1 Awn. 911 i00W i'.0704 W4. \IgrANNFRWmlta Nlgl0511200 M 6 Revision Date: 715/2007 ❑ Cheyenne Plains Gas Pipeline Co. ® Colorado Interstate Gas Co. ❑ El Paso Natural Gas Co. ❑ Mojave Pipeline Operating Co. ❑ Wyoming Interstate Company Permit Requested b�yy C O -� Name M i a 4 GG aLy_ Addres 07 N G-rrrer woe Phone (111) P53- 3609 Your gas company representative is Bill Thomas (719) 251.4500 cell If - Phone (Collect Calls Accepted) pas One Call number for your area Is (800) 922 -1987 Colorado Interstate Gas Company CGrantor") hereby grants a permit to install, maintain and operate the above- referenced encroachment facilities ( 'Permitted Facility') on the above - referenced Company easement or other property ( "the Properly"). This permit is granted subject to the terms, requirements, and conditions shown below and strictly in accordance with the general requirements and item(s) of the encroachment specifications shown on the following page(s). DAMAGE PREVENTION: Permittee agrees that it shall not begin construction upon and along the Property until Permittee first provides Grantor with plans and specifications and until such plans and specifications have been approved by Grantor. Permittee further agrees to contact the following the statewide associations (One Call) within its area at least two working days prior to the commencement of construction on the property. Such construction shall be made only when a representative of Grantor is present at the time and place of construction. The Instructions of such representative relating to the safety of the pipelines or other facilities of Grantor shall be followed by the Permittee, Its agents and employees. Any damage done to Grantor's facilities incurred due to Permittee's failure to adhere to the state "CALL BEFORE YOU DIG" law, or incurred during construction of the Permitted Facility, shall be paid for or repaired at the expense of the Permittee. This P rm shall be revocable in t eve pt of noncompliance of any terms requi ments, conditions, an specifications hereof upon written nptic given t Permittee and /or o er of record. COM NY: LORADO WERSTATE GAS COMPANY By. GRANTOR EXHIBIT C INDEMNIFICATION: Permittee covenants and agrees to at all times protect, indemnify, hold harmless, and defend Grantor, its officers, agents or employees, from any liability or expense, including attorneys' fees, arising from claims asserted by any person or persons for personal Injuries, death or property damage including but not limited to employees of the Permittee or its contractors, subcontractors or their employees, arising from or growing out of the construction, existence, maintenance, operation or removal of the Permitted Facility. ENVIRONMENTAL AND SAFETY LAWS: Permittee shall comply with all federal, state, and local laws, rules and regulations, agency policies, guidance documents or common law including, but not limited to, those related to safety or pollution or protection of the public health and the environment that govern the emission, discharge, release, manufacture, processing, distribution, use, treatment, handling, storage, disposal, or transportation of hazardous or non - hazardous substances, materials, pollutants, contaminants, chemicals, and /or waste. I acknowledge that I am authorized to execute this Encroachment Permit for the above stated entity and that I have carefully read the requirements, terms and conditions of this Permit. I also understand the provisions and prescribed , penalties as provided under the laws regarding excavation. PERMITTEE 37 EASE 09/28/2007 03:38:02 PM Gilbert Ortiz Clerrrk /Recorderr,TPuebBlo County, Co .00 0.00 1111 K 11471011 PIKHM KN 1 1111 ENCROACHMENT LOCATION SECTION: Wr/z1N112 of 26 TOWNSHIP: 2os RANGE: 64W COUNTY: pueblo ST. CO PM ' 6th LATITUDE: LONGITUDE: LENGTH: STATION NO: LINE LIST NO.: 32A-004/32B .014 ROW WIDTH: 65' ± ALIGNMENT SHEET NO.: 32A -002 / 32B -002 ENCROACHMENT DESCRIPTION Comcast is laying a fiber optic line which will cross CIG's two 8 Inch diameter high pressure natural gas pipelines. Each crossing is at a 90 angle. One Call number for your area Is (800) 922 -1987 Colorado Interstate Gas Company CGrantor") hereby grants a permit to install, maintain and operate the above- referenced encroachment facilities ( 'Permitted Facility') on the above - referenced Company easement or other property ( "the Properly"). This permit is granted subject to the terms, requirements, and conditions shown below and strictly in accordance with the general requirements and item(s) of the encroachment specifications shown on the following page(s). DAMAGE PREVENTION: Permittee agrees that it shall not begin construction upon and along the Property until Permittee first provides Grantor with plans and specifications and until such plans and specifications have been approved by Grantor. Permittee further agrees to contact the following the statewide associations (One Call) within its area at least two working days prior to the commencement of construction on the property. Such construction shall be made only when a representative of Grantor is present at the time and place of construction. The Instructions of such representative relating to the safety of the pipelines or other facilities of Grantor shall be followed by the Permittee, Its agents and employees. Any damage done to Grantor's facilities incurred due to Permittee's failure to adhere to the state "CALL BEFORE YOU DIG" law, or incurred during construction of the Permitted Facility, shall be paid for or repaired at the expense of the Permittee. This P rm shall be revocable in t eve pt of noncompliance of any terms requi ments, conditions, an specifications hereof upon written nptic given t Permittee and /or o er of record. COM NY: LORADO WERSTATE GAS COMPANY By. GRANTOR EXHIBIT C INDEMNIFICATION: Permittee covenants and agrees to at all times protect, indemnify, hold harmless, and defend Grantor, its officers, agents or employees, from any liability or expense, including attorneys' fees, arising from claims asserted by any person or persons for personal Injuries, death or property damage including but not limited to employees of the Permittee or its contractors, subcontractors or their employees, arising from or growing out of the construction, existence, maintenance, operation or removal of the Permitted Facility. ENVIRONMENTAL AND SAFETY LAWS: Permittee shall comply with all federal, state, and local laws, rules and regulations, agency policies, guidance documents or common law including, but not limited to, those related to safety or pollution or protection of the public health and the environment that govern the emission, discharge, release, manufacture, processing, distribution, use, treatment, handling, storage, disposal, or transportation of hazardous or non - hazardous substances, materials, pollutants, contaminants, chemicals, and /or waste. I acknowledge that I am authorized to execute this Encroachment Permit for the above stated entity and that I have carefully read the requirements, terms and conditions of this Permit. I also understand the provisions and prescribed , penalties as provided under the laws regarding excavation. PERMITTEE 37 EASE 09/28/2007 03:38:02 PM Gilbert Ortiz Clerrrk /Recorderr,TPuebBlo County, Co .00 0.00 1111 K 11471011 PIKHM KN 1 1111 ENCROACHMENT REQUIREMENT Said company is an Interstate transporter of natural gas and hazardous liquids and as such, is regulated by the Department of Transportation, Office of Pipeline Safety (OPS). In some cases state and local law may exceed the federal regulations. The general requirements listed below have been designed to comply with state and federal regulations as well as insuring the safety of the public and protecting the pipeline. The following requirements have been developed to cover a wide variety of proposed uses that may run parallel with or encroach under, over or on the right -of -way easements or other property. These minimum requirements for most proposed encroachments are Incorporated into this Permit to avoid conflict with existing easement rights. Additional requirements may be required depending upon the proposed encroachments. For a review of your individual situation, please contact the nearest CIG office at (719) 948 - 5260 GENERAL REQUIREMENTS FOR SURFACE ALTERATIONS A. ® Many states have laws which require 48 hours notice be given to the operators of underground facilities prior to beginning excavation. This may be accomplished by contacting a One Call system (check your state). B. ® Company's easement restricts the placement of a structure, or any part of a structure, within the right-of-way. C. ® An authorized Company representative must boon site during any work performed on or across the right -of -way, and will remain as long as power equipment Is utilized. D. ❑ The Company representative will determine the amount of cover over the pipeline that may be required. E. ❑ Any change in the amount of existing material (soil) on and over the right -of -way must be approved in advance. I. FENCES A. ❑ Fence posts shall not be installed within 5 feet of the center of the pipeline, and the first post either side of the pipe shall be set In hand dug holes. B. ❑ To perform normal maintenance, access through or around fences crossing the right of -way must be provided. C. ❑ Installer shall adhere to provisions A & C of GENERAL REQUIREMENTS FOR SURFACE ALTERATIONS It. LANDSCAPING (plantings which require excavating beyond t foot in depth) A. ❑ Flower beds and shrubs are permitted within the right of -way after Company review and approval. Heavy maintenance may require total clearing of the right of way. R ❑ Lawns and vegetable gardens are acceptable uses. No trees are allowed on the right -of way. C. ❑ Provisions A & C of the GENERAL REQUIREMENTS FOR SURFACE ALTERATIONS pertain to this type of planting. STREETS, ROADS, DRIVEWAYS, PARKING LOTS A. ❑ Residential driveways, streets, or public parking lots which affects existing pipelines and easements will be evaluated on a case by case basis by our Engineering Department for acceptable cover. B. ❑ Driveways or roads shall not run lengthwise within the right-of- way and must cross on an angle, which is not less than 45 degrees. C. ❑ An opportunity for Company to make a pipe inspection must be given prior to the start of any construction. D. ❑ At Company's discretion, sniffer holes may be required for parking lots which cover the pipeline(s) up to the edge of the building(s). E. ❑ Highway, residential street, road construction, or parking lots requires a special encroachment agreement from the Land Department, and plans for such crossings should be submitted 90 days prior to work commencement to allow time for project impact review by the Company' Engineering Department, IV. TEMPORARY EQUIPMENT CROSSINGS A. ❑ Equipment utilized for construction, logging, etc., must cross the pipeline(s) only at approved crossing locations where the cover has been checked and determined adequate to meet bearing load requirements. Crossings must be at 90' angle across the pipeline(s). - V. OPEN WATERWAYS A. ❑ Open waterways smaller than 3 feet wide at the bottom are defined as "ditches" and must have a minimum of 3.5 feet of cover from the top of the pipe to the bottom of the ditch, or the ditch must be lined using an approved method and material. Larger open waterways are defined as "canals' and are considered on an individual basis. B. ❑ Anyone altering (clearing, regrading or changing alignment) a waterway must obtain approval from Company prior to making changes and shall meet Provisions A & C of the GENERAL REQUIREMENTS FOR SURFACE ALTERATIONS. VI. EXCAVATION A. ® Plans for any excavation on the right of way must be approved prior to commencing work. Excavating closer than 2 feet to the pipeline shall be done by hand until the pipeline is exposed and shall be done only under the supervision of an authorized Company representative. B. ® When a backhoe is used, the bucket teeth should be curled under each time It's brought back into the ditch to reduce the chance of teeth contacting the pipe. C. ® Any plowing or ripping of soil on the right -of -way, including agricultural, at depths greater than 1 foot will require specific authorization from the Company.. GENERAL FOR BURIED LINE CROSSINGS A. ® All buried lines crossing Company's right -of -way shall be installed adhering to all applicable codes and requirements governing such installations. B. ® All buried lines crossing the right-of -way must cross on an angle at 9D degrees or as close to it as possible. This angle must be maintained across the entire width of the easement. C. ® All buried lines should cross under the pipeline. However, when obstructions or unfavorable soil conditions are encountered, or when the Company's pipeline is located at a depth greater than 4 feet, approval to cross over the line may be granted by said Company.. D. ® To avoid unexpected service Interruptions of buried lines, crossing over Company's pipeline, a minimum of 24 inches of cover (or local minimum required depth) must be provided over the existing crossed line. 1743622 EASE 09/28/2007 03:38:02 PM P e ' 6 of 7 R 36.00 D 0.00 T 36.00 Gilbert Ortiz Clerk/Recorder, Pueblo C Ca t GENERAL REQUIREMENTS FOR BURIED LINE CROSSINGS CONT. E. ® All burled lines crossing the pipeline shall maintain a minimum separation of 24 Inches between the two lines, and shall remain level across the entire right-of way. F. ® No foreign appurtenances (meters, poles, drop boxes, collection basins, etc.) shall be located on the right -of -way. G. ® A six Inch wide vinyl burial warning tape shall be placed 12 to 18 Inches above the crossing line and extend across the entire right-of-way, as a protective measure. H.0 A joint trench Is the recommended method for utilities to cross, and under normal circumstances only requires that one permit be obtained by the excavating company. I. COMMUNICATION LINES (TELEPHONE, TV, OTHER DATA LINES) A.0 Shall meet all provisions for GENERAL REQUIREMENTS - BURIED LINE CROSSINGS B. ® Shall be encased in a rigid nonmetallic conduit across the full width of the right -of -way and buried at constant depth across the right of way(s). C. ® Fiber optic lines must be encased In PVC or equal conduit and the conduit must be encased with a minimum 5 inch red dye concrete with minimum strength of 2,500 psi across the full width of the right of -way. D. ❑ There will be no intentional grounding within 200 feet of the pipeline. II. BURIED POWER LINES A. ❑ Shall meet all of the GENERAL REQUIREMENTS -BURIED LINE CROSSINGS, except for item E. B. ❑ Shall have minimum clearances between lines of 24 inches for 0 to 800 volts; 30 inches for 601 to 22,000 volts; 36 Inches for 22,001 to 40,000 volts; and 42 Inches for 40,001 volts and above. C. ❑ In the event an underground electric line crosses the pipeline, It will be necessary to install the crossing line in pvc or rigid heavy wall steel conduit with a minimum 5 inch red dye concrete with minimum strength of 2,500 psi across the full width of the right of -way. D. ❑ Signs should be placed at each edge of the right -of -way to mark the underground cable angle and path of crossing. if the underground cable crosses above the pipeline, the signs shall so indicate. These signs are to be furnished by the power company or the encroaching party. III. SEWER AND WATER LINES A. ❑ Shall meet all of the GENERAL REQUIREMENTS - BURIED LINE CROSSINGS. B. ❑ No manholes or other appurtenances shall be installed in the right of way. C. ❑ Septic tanks and drainfields are not permitted In the right of- way. IV. SUBSURFACE DRAINAGE TILE (NON - METALLIC) A. Shall meet provisions A, B, E, G & H of GENERAL REQUIREMENTS- BURIED LINE CROSSINGS. V. METALLIC PIPE CROSSINGS A. ❑ All 4 inch and larger metallic pipes crossing Company's pipeline or any metallic pipe transporting potential hazardous material (petroleum, natural gas, etc.) shall have two corrosion test leads Installed on Company's pipeline and two on the crossing pipe at the point of Intersection. B. ❑ Company personnel must install the leads on company's Pipeline(s) and, if requested, will also install the leads on the crossing pipe. C. ❑ Metallic pipe crossings shall have an electrical insulation coating for the full width of the right-of-way. ABOVE GROUND UTILITY LINE CROSSINGS A. ❑ Power lines shall maintain a minimum height of 30 feet of clearance over the right -of -way grade. B. ❑ Shall have no poles or appurtenances located on the right-of- way. C. ❑ Above ground crossings shall not be above or closer than 200 feet horizontally to any gas escape vent (e.g., relief valve vent, station blowdown vent). D. ❑ Any pot hole (bell hole) request shall be made through a Company's representative. E. ❑ Any facilities laying on or just above the surface on the right of way that would Impede the access of company vehicles shall have a vehi cular ramp installed over the facilities. Special provisions not addressed in this document shall be listed below or as an attachment labeled as (EXHIBIT "A") attached to this form and initialed by the Permittee. State One Cell Contacts Arizona (800) 782 -5348 www.azbsinc.com Maricopa County (602) 263 -1100 California (800) 227 -2600 wwwAlcalert.om Colorado (800) 922 -1987 www.uncc2.om Kansas ( 800) 344 -7233 www.kansasonecall.com Nevada (800) 227 -2600 www.usanorth.ora New Mexico (800) 321 -25378 (ALERT) www.nmonecall.orb Oklahoma (600) 522 -6543 www.callokie.com Texas Lone Star Notification (800) 669 -8344 Texas Excavating Safety System (800) 344 -8377 Texas One Call (800) 245.4545 Utah (800) 662 -4111 Wyoming Wyoming One Call (800) 348 -1030 Call Before You Dig of Wyoming (800) 849 -2476 1743622 EASE 09/28/2007 03:38:02 PM Page: 7 of 7 R 36.00 D 0.00 T 36.00 Gilbert. Ortiz Clerk /Recorder, Pueblo County, Cc mill K R71WIRM ION WAVI01 11111