HomeMy WebLinkAbout10971RESOLUTION NO. 10971
A RESOLUTION APPROVING A PROPOSAL FROM TETRA TECH FOR THE SPILL
PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN UPDATE AT THE
PUEBLO MEMORIAL AIRPORT AVIATION FUELS STORAGE FACILITY IN THE AMOUNT OF
$3,604 PLUS $360 FOR CONTINGENCIES AND AUTHORIZING THE PRESIDENT OF THE CITY
COUNCIL TO EXECUTE SAME
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO. that:
SECTION 1.
Tetra Tech Proposal No. P75000010, a copy of which is attached hereto and made part
hereof by reference relating to the Spill Prevention Control and Countermeasures (SPCC) Plan
Update at the Pueblo Memorial Airport Aviation Fuels Storage Facility, is hereby approved and
accepted.
SECTION 2.
The President of City Council is hereby authorized to execute the Proposal on behalf of
Pueblo, a Municipal Corporation.
SECTION 3.
Funds in the amount of $3,604 plus $360 for contingencies will be expended from the 2007
Airport Budget.
INTRODUCED April 9, 2007
APPROVED:
ESID NTof City Council
ATTESTED BY:
CITY CLERK
BY Randy Thurston
Councilperson
Rf,s lbq
J
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # S
DATE: April 9, 2007
DEPARTMENT: AVIATION - JERRY 13RIENZA
TITLE
A RESOLUTION APPROVING A PROPOSAL FROM TETRA TECH FOR THE
SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN
UPDATE AT THE PUEBLO MEMORIAL AIRPORT AVIATION FUELS STORAGE
FACILITY IN THE AMOUNT OF $3,604 PLUS $360 FOR CONTINGENCIES AND
AUTHORIZING THE PRESIDENT OF THE CITY COUNCIL TO EXECUTE SAME
ISSUE
Should City Council approve a proposal from Tetra Tech to update the Spill Prevention
Control and Countermeasure (SPCC) Plan at the Pueblo Memorial Airport Aviation Fuels
Storage Facility.
RECOMMENDATION
Approval of this Resolution.
BACKGROUND
This proposal reflects labor and other direct costs required to update the Aiprort's SPCC
Plan in order to comply with U.S. Environmental Protection Agency Oil Pollution
Prevention regulations and to re- certify the SPCC Plan by a registered professional
engineer as required by the regulations.
FINANCIAL IMPACT
Funds in the amount of $3,604 plus $360 for contingencies will be expended from the
2007 Airport Budget.
TETRATECH, INC.
March 28, 2007
Mr. Jerry Brienza
Pueblo Memorial Airport
31201 Bryan Circle
Pueblo, CO 81001
RE: Pueblo Memorial Airport Aviation Fuels Storage Facility
Spill Prevention Control and Countermeasures (SPCC) Plan Update
Tetra Tech Proposal No: P75000010
Dear Mr. Brienza:
Tetra Tech, hic. (Tetra Tech) is pleased to present the following proposal to update and certify
the Spill Prevention Control and Countermeasure (SPCC) Plan for the Pueblo Memorial Airport
(PMA) Aviation Fuels Storage Facility. This proposal reflects labor and other direct costs
(ODCs) required to update PMA's SPCC Plan to comply with U.S. Environmental Protection
Agency (USEPA) Oil Pollution Prevention regulations as set forth at 40 CFR 112 and re- certify
the SPCC Plan by a Registered Professional Engineer as required by the regulations at 40 CFR
112.3(d). The following proposed scope of work details the projected level of effort to prepare
the SPCC Plan.
Scope of Work
Tetra Tech proposes to undertake the following tasks to prepare and certify an SPCC Plan in
accordance with the requirements of the Oil Pollution Prevention regulations set forth at 40 CFR
112.
Task 1--Site Visit and Records Review — includes the labor and materials to verify existing
conditions including facility physical dimensions, review current policies and procedures used to
manage the fuels facility, and review existing operating records. The following activities will be
completed as part of this task:
Conduct a site visit to survey, measure, and verify physical dimensions of the tank farm
and containment areas including containment barrier heights. These measurements are
required to calculate the containment storage volume.
Review current policies and procedures for spill prevention, spill control, and spill
response at the facility.
Review and identify facility records, logs, and reports for inclusion in the SPCC.
363 Centennial Parkway, Suite 210, Louisville, CO 80027
Tel 303.665.4392 Fax 303.665.4391
www.tetratech.com
Mr. Jerry Brienza
Page 2 03/28/07
Task 2--Spill Prevention Control and Countermeasure (SPCC) Plan Update — includes
updating the existing SPCC Plan to comply with federal regulations at 40 CFR 112. A Colorado
Registered Professional Engineer (P.E.) will certify the final Plan. This task includes the
following activities:
• Rearrange plan sections to conform to the sequencing requirements of the regulations at
40 CFR 112.7(a).
• Update, add to, and/or expand existing plan sections to provide required detail to
conform to the regulations at 40 CFR 112.7 and 112.8.
• Prepare inspection forms and log forms for use by the facility. Review and update
inspection procedures to be used at the facility as required at 40 CFR 112.7(e).
• Update and prepare required facility drawings including detailed facility drainage map
and descriptions as required at 40 CFR 112.7(b).
• Update personnel training procedures and records of training to be kept at the facility in
accordance with the regulation at 40 CFR 112.7(f).
Task 3— Project Management — involves coordinating all project — related activities and senior
management review of all deliverables.
Tetra Tech will perform the scope of work in good and workmanlike manner consistent with
applicable industry standards.
Cost Estimate
The following breakdown presents the costs, including labor and ODCs, by task to complete the
above detailed scope of work:
Task 1 —Site Visit and Records Review $ 760.00
Task 2 —SPCC Plan Development and P.E. Certification 2,173.00
Task 3— Project Management 6 71.00
Total Costs $ 3,604.00
Tetra Tech proposes to undertake this project on a Lump Sum basis for a total cost of $ 3,604.00.
The total cost will be invoiced at the completion of the work and payment will be due within 30
days of receipt of invoice.
Schedule and Availability
Tetra Tech is available to begin this project immediately upon contract award. Tetra Tech
proposes to complete this project not later than 60 days from the date of contract award and
expects that a draft SPCC Plan for PMA's review and comments could be completed within 30
days of contract award.
Mr. Jerry Bdenza
Page 3
03/28/07
Exhibit "A ": State - Imposed Mandates Prohibiting Illegal Aliens From Performing Work is
incorporated herein and Tetra Tech as Contractor shall abide by and be bound by the provisions
thereof.
Please sign the acceptance box below to authorize the work to commence. We appreciate this
opportunity to support Pueblo Memorial Airport with your environmental requirements. Please
contact me at (303) 665 -4392 if you have any questions or comments regarding this proposal.
Sincerely,
TETRA TECH
�� �1'
MARK DALEY
OFFICE MANAGER
Rev: GR
CLIENT: City of Pueb
Accepted By: �
JudV P. W aver
Title: President of City Counri 1
Date: April 9, 2007
TETRATECH, INC.
Pueblo Memorial Airport, 31201 Bryan Circle, Pueblo, Colorado _
Aviation Fuels Storage Facility - SPCC Plan
Dale March 26, 20
Proposal #: P75000010
Task
1
Task
2
Task 3
LABOR
Professional Engineer
Senior Staf(Eng /Sci)
Admin
Site Visit
S
SPCC
Plan S,
Project Management
Category
Total
Racortls
Raviaw
P.E. Certlflcalion
and Re
portin
Am ount
QTY.
Amount
_ $1 ,980
Rate
QTY.
Amount
OTV _.
Amount
—
OTV.
16
__—
$110.00
2
8
$880
8
$860
$72.00
4
_$
$288
$0
6
$432
_._
6
_
_ $432
_ _.
_ 16
$1.152
$45.00
0
4
$180
3
$135
7
$315
Labor Total
ODCs
TraveVShippin
Shippinglpackagelreproduction
6
$508
78
$1,492
17
$1,447
41
$3,447
$25.00
0
0
300
$0
$0
1
$25
1
_ $25
Vehicle Milea elmile
$0.440
$132
$0
0
$0
300
$132
Travel Total
$132
$0
$25
$157
Equipment Rental
CDC Subtotal
$162
1
$0
$25
$157
Less Unus ODCs
$0
Total Cost
i
53,604
363 Centennial Parkway, Suite 210, Louisville, CO 80027
Tel 303.665.4392 Fax 303.665.4391
vwew.tetratech.com
Hr lConowkI5000631Revlsad MV Copy of SPCC U,odate W2007.uaSCost Basis 1of1