Loading...
HomeMy WebLinkAbout10704RESOLUTION NO. 10704 A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND DESIGN STUDIOS WEST, INC., FOR PERFORMING AND COMPLETING THE CONSTRUCTION DOCUMENTATION AND BIDDING PHASE SERVICES FOR PHASE III A -1 OF THE HISTORIC ARKANSAS RIVERWALK OF PUEBLO, AND AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE SAME WHEREAS, the City approved an agreement with Design Studios West, Inc. ( "DSW ") on February 27, 2006 to perform "Part A" of the Construction Documentation and Bidding Phase for Phase III A -1 of the Historic Arkansas Riverwalk of Pueblo ( "HARP "). WHEREAS the City now desires to have DSW complete the Construction Documentation and Bidding Phase for this Phase of HARP; and WHEREAS, the City of Pueblo and the HARP Foundation have funds available for completion of the Construction Documentation and Bidding Phase for HARP Phase III A -1; NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO. COLORADO. that: SECTION 1. Amendment No. 1 to the Agreement for Professional Design Services dated February 27, 2006, between the City of Pueblo, a Municipal Corporation, and Design Studios West. Inc. ( "Amendment No. 1 "), a copy of which is attached and incorporated herein and having been approved as to form by the City Attorney, is hereby approved. SECTION 2. The President of City Council is hereby authorized to execute and deliver Amendment No. 1 in the name of and on behalf of the City of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. Funds in the amount of $129,300 will be paid from the HARP Phase III A -1 Capital Improvement Project No. PWHP07 for performance and completion of the Construction Documentation and Bidding Phase for Phase III A -1 of HARP. INTRODUCED April 24, 2006 BY Jeff Chostner Councilperson /�� "�" APPROVED: �C UJtx VICE FFRESIDLINTof City Council ATTESTED BY: CITY CLERK &4. #1070 Background Paper for Proposed Resolution AGENDA ITEM # DATE: APRIL 24, 2006 DEPARTMENT: COMMUNITY DEVELOPMENT /JIM MUNCH PLANNING DEPARTMENT /JIM MUNCH TITLE A RESOLUTION APPROVING AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND DESIGN STUDIOS WEST, INC., FOR PERFORMING AND COMPLETING THE CONSTRUCTION DOCUMENTATION AND BIDDING PHASE SERVICES FOR PHASE III A -1 OF THE HISTORIC ARKANSAS RIVERWALK OF PUEBLO, AND AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE SAME ISSUE Should the City Council approve an amendment to the Agreement with Design Studio West, Inc. to complete the Construction Documentation and Bidding Phase for the HARP Phase III A -1 project? RECOMMENDATION Approve the Resolution. BACKGROUND Ordinance No. 7442 established a budget for completing Phase III A -1 of the Historic Arkansas Riverwalk of Pueblo project. The City divided the Construction Documentation and Bidding Phase into two parts. The first part, ( "Part A "), is completed and included the consultant's verifying the site design, identifying the construction materials, updating the cost estimate, establishing the phasing perimeters and addressing all of the concerns that the partners have identified. The City is ready to complete the Construction Documentation and Bidding Phase ( "Part B "). The construction documents will be completed in June 2006, bidding will take place during the month of July, and construction should begin in September or October 2006. Construction will be completed by February 2008. The City entered into an Agreement for Professional Design Services with Design Studios West, Inc. on February 27, 2006 to complete "Part A" of the Construction Documentation and Bidding Phase for the project. This Amendment No. 1 will direct DSW to complete the Construction Documentation and Bidding Phase for Phase III A -1 of the project. FINANCIAL IMPACT The final step, "Part B ", in completing the Construction Documentation and Bidding Phase will cost $129,300. DSW will be paid from the HARP Phase III Capital Improvement Project No. PWHP07. AMENDMENT NO.1 AGREEMENT FOR PROFESSIONAL DESIGN SERVICES THIS AMENDMENT NO. 1 to the Agreement for Professional Design Services is made and entered into this 24th day of April 2006 by and between the City of Pueblo, a Municipal Corporation (hereinafter referred to as "Owner") and Design Studios West, Inc., a professional planning and design firm (hereinafter referred to as "Consultant "). WHEREAS, Owner and Consultant have heretofore entered into an Agreement (hereinafter "the Agreement ") dated February 27, 2006, wherein the Consultant agreed to render certain professional planning, design, engineering and related services for Owner in connection with the Historic Arkansas Riverwalk Project, Phase III A -1 (hereinafter referred to as the "Project"); and WHEREAS, the parties agree that this Amendment No. 1 to the Agreement is necessary and desirable to modify the Agreement to provide for the Consultant to perform and complete the additional design work and preparation of Bid Documents (including Contract Documents, Plans and Specifications), including all remaining work of the Construction Documentation and Bidding Phase of the Project and performance of construction administration activities by the Consultant now remaining with respect to the Project (that is, all services described in Subsection 2.4 of the Agreement which remain with respect to Phase III of the Project) and to modify the Agreement to include required provisions applicable thereto; NOW, THEREFORE, in consideration of the foregoing and mutual terms and conditions set forth herein, the parties agree as follows: 1. The Agreement is amended by expanding the scope of work to include all professional planning, design, engineering and related services and functions reasonably required or necessary for the Construction Documentation and Bidding Phase, as contemplated within Sections 1 and 2 of the Agreement, as amended, with respect to the Project. 2. Appendix "A" to this Amendment No. I shall be added to the original scope of work, and the Consultant shall complete the work items described generally in Appendix "A" to this Amendment No. 1 in accordance with the terms of the Agreement, and all prior amendments thereto for the performance of professional services with respect to the Project. 3. With respect to services provided under this Amendment No. 1, Appendix `B" to this Amendment No. 1 shall apply to compensation payable to the Consultant, and to key personnel and consultants employed or retained by the Consultant, in connection with the Consultant's services for the work authorized by this Amendment No. 1. The aggregate compensation payable to the Consultant for performance of the additional services and reimbursable expenses authorized by this Amendment No. 1 shall not exceed the maximum amount of $129,300. 4. Appendix "C" shall be added to this Amendment No. 1 and identify key personnel who will be involved in the Project on behalf of the Consultant. 5. Except as expressly modified by this Amendment No. 1, the Agreement, including all prior written amendments thereto, shall remain in full force and effect. Any obligations remaining to be performed under the original Agreement (and all prior amendments) by either party, relating to the professional services to be performed by the Consultant generally or with respect to other phases of the project are not waived or excused in any manner, but shall be fully performed in accordance with the terms and conditions of the Agreement as it existed prior to this Amendment No. 1. 6. The Agreement is amended by the addition of the following subsections 10.3 and 10.4 under Section 10: 10.3 ACCESS TO RECORDS — Consultant shall make available to the City, Economic Development Administration (EDA), the Comptroller General of the United States, the Inspector General of the Department of Commerce, or any of their duly authorized representatives, all documents, books, papers, and records of the architect/engineer (which are directly pertinent to the HARP project) for the purpose of making an audit, examination, excerpts, and transcriptions. The Consultant shall maintain all required records for at least three years after the City makes final payment and all pending matters are closed. 10.4 Consultant shall comply with all bidding and construction requirements identified under the City of Pueblo's Economic Development Administration Grant, Award No. 05 -01- 04239. IN WITNESS WHEREOF, Owner and Consultant have executed this Amendment No. 1 to the Agreement For Professional Design Services as of the date first above written. OWNER City of Pueblo By • A/.2aML Presi nt of t1k City Council CONSULTANT Design Str0ios N Don If. Brandes, Jr. Attest: City Cgrk [SEAL] BALANCE OF APPROPRIATION EXISTS FOR THIS CONTRACT AND FUNDS ARE AVAILABLE. Director of Finance APPROVED AS TO FORM: /tom Z � City Attome APPENDIX A Amendment No. 1 Scope of Work HARP PHASE 111A-1 — Construction Documents Part B. — Progration of Construction Documents and Bidding Phase A. PROFESSIONAL SERVICES Below is the Scope of Work for the preparation of the Construction Documents for HARP Phase III A -1. The design team is as follows: Prime Consultant: Design Studios West, Inc. Subconsultants: Sellards & Grigg, Inc. HydroSystems *KDI, Inc. Aqua Engineering, Inc. Terracon Project Limits: The project limits arc defined by the attached Project Limits diagram (Exhibit A). Definitions: The term "Consultant" shall be used to refer to the Prime consultant and /or any of the sub - consultants listed herein. Project Description: L Design ofNavigable Channel Consultant shall complete final design of the navigable channel from the point of connection with the current channel terminus point immediately north of the Grand Avenue Bridge to the terminus point as shown on the attached project limits diagram (Exhibit A). The Navigable channel as described above shall include the following elements: The modification of the wall alignment in the turning basin to provide for curvature rather than an angle point at the connections between the navigable channel and the turning basin. The reinforced concrete channel bottom within the project limits as described in Exhibit A. • The reinforced concrete channel walls within the project limits as described in Exhibit A. The design of channel walls shall specifically include the design of the coping stone surface that shall be used for the top surface of the wall and any elevation variations in the top of the channel wall that are determined during the final design process. The sub -drain system that serves the entire Phase III navigable channel as described in Exhibit A. The reinforced concrete foundation for the Boathouse is not included in the design for Phase IIIA -1. The consultant shall provide design of the channel walls and channel floor in the boat storage area to allow for the future removal of the channel floor to receive the building foundation. It is understood that the channel floor in the boat storage area will need to be removed and replaced as necessary for the boathouse structure foundation, which will be constructed in a future phase. The current design phase will allow for boat storage and the use of a temporary boat ramp in the Boathouse area. • The sidewalk adjacent to the navigable channel. 2 Environmental Consulting Services for the Prepamdon ofa Voluntary Cleanup Program Application • Consultant shall perform environmental consulting services for a Phase I Environmental Site Assessment (PHl ESA) and the preparation of a Voluntary Cleanup Program (VCUP) application. The purpose of the ESA is to assist in the development of information to identify recognized environmental conditions (RECs) in connection with the site. • A Phase II, Environmental Site Investigation (PH2) may be necessary depending on the findings of Phase I (PHI ESA). If the Phase II investigation is required, a request for modification to the Agreement would be made with the appropriate costs to proceed with Phase II. 3. Americans with Disabilides Act (ADA) Compliance Consultant shall be responsible for the design of all pedestrian walkways within the project limits of the HARP Phase IIIA -1 project limits to be in accordance with ADA standards. 4 Utility Relocation required for construction of the Phase III -A Navigable Channel Due to the elapsed time since the completion of the Design development Phase of the HARP Phase IIIA -1 project, Consultant shall be responsible for placing a request for the marking of underground utilities with the project limits as described by Exhibit A. Consultant shall be responsible for surveying ground markings of underground utilities within the project limits as described by Exhibit A and annotating utility locations on the construction drawings. Page 2 of 8 The design of water line relocations required for the construction of the navigable channel. The design of water line relocation within the limits of Richmond Avenue as shown on the attached Exhibit A shall be specifically excluded from the scope or services for the HARP Phase IILA -1 project. 5. Drainage Infrastructure Required for Construction of the Navigable Channel The final design of storm sewer infrastructure necessary for the construction of the HARP Phase IIIA -1 project described as follows: The final design of approximately 90 lineal feet of reinforced concrete pipe that will ultimately provide for discharge of parking lot overflows for extreme flood events into the navigable channel. For the interim condition associated with Phase IIIA -1, the reinforced concrete storm sewer will be terminated and temporarily blocked at a location south of the exiting flow line of Richmond Avenue so as to avoid disruption of Richmond Avenue at this location as described on Exhibit A. The final design of storm sewer connections to the existing sump condition inlets at the intersection of Richmond and Mechanic that will provide for collection of stormwater at this location and discharge into the proposed storm sewer that will discharge to the existing storm sewer trunk line beneath the navigable channel. The final design of the storm sewer system at the intersection of Richmond and Mechanic will be a design for an interim condition due to the fact that the existing vertical alignment of Richmond Avenue is not being significantly changed as part of the HARP Phase III -A project. The design concept for the interim drainage condition at the intersection of Richmond & Mechanic will provide sufficient storm sewer capacity from the sump condition at the intersection to insure that the stormwater ponding depths at the intersection under the interim condition do not exceed the ponding depths under the existing condition for a full range of flood return periods. • The final design of a storm sewer lateral connecting to the existing sump conditions on the police department site as described in Exhibit A. 6. Extension of the Raw Water Delivery System to the Navigable Channel The final design of the extension of the existing raw waterline that currently conveys raw water from Lake Elizabeth to a point of discharge in the navigable channel under the Grand Avenue Bridge. The design of the raw water line extension shall specifically include the development of the horizontal and vertical alignment of the pipe from the point of connection with the exiting raw water line under the Grand Avenue Bridge to the point of discharge into the navigable channel near the upstream terminus of the navigable channel. The raw water line extension shall include valves that will allow for control of discharge to the navigable channel at the existing point of discharge under the Grand Avenue Bridge and at the new point of discharge near the upstream terminus of the navigable channel. Page 3 of 8 Z Decorative Wall Tiles for the Turning Basin The final design of decorative wall tiles in the turning basin of the navigable channel 8. Landscaping and Irrigation Design for the HARP Phase I1I4-1 Project The final design of the landscaping within the project limits as described by Exhibit A. The final design of Irrigation systems with the project limits as described by Exhibit A, but with consideration for the entire Phase III project. 9. Sidewalk, Site Furnishings, Lighting and Fountain Design for the Phase III4-1 Project The final design of the pedestrian sidewalk system, site furnishings, site lighting and the Basin fountain within the project limits as described by Exhibit A. This does not include the relocation of the Wet Design Fountain at this time. The Wet Design Fountain relocation will need to be a modification to the Agreement based on the results of the Aqua Engineering investigation that is part of this phase and further direction from the City of Pueblo and HARP. 10. Consultation with the Pueblo Board of Water Works regarding Water Line Relocation Requirements Consultant shall meet with a representative of the Pueblo Board of Water Works for the purpose of obtaining a decision regarding the relocation or abandonment of a water line that is presently on an alignment that intersects the HARP Phase IIIA -1 navigable channel. In the event that the Pueblo Board of Waterworks decides to relocate the existing water line to a location underneath the navigable channel, the consultant design contract will be modified /amended to include the design of the relocated waterline underneath the navigable channel. 11. Water Line Relocation under the HARP Phase I1I4-1 Channel (Potential addition to the Scope ofServices for the HARP Phase ILI4-1 Project) The final design of a relocation of the existing waterline that is presently located in Mechanic Street at a location that will intersect the Phase III navigable channel is not a part of this design contract and will need to be added, if required, as an amendment to this agreement. The water line relocation design will be compliant with design standards of the Pueblo Board of Water Works if authorized. 12. Storm water Quality Improvement Design for the HARP Phase III -A Project Preparation of a Stormwater Management Plan for submittal to the City of Pueblo Stormwater Utility Page 4 of 8 • Preparation of a Plan that shall be included in Construction documents that sets forth all requirements for temporary erosion control during construction • The final design of an oil and grease separator for the manhole that receives stormwater from the existing inlets at the intersection of Richmond and Mechanic. • The final design of a stormwater quality detention basin within the project limits of the HARP Phase IIIA -1 project as described by Exhibit A. The Water Quality Capture Volume for the Stormwater Quality Basin will be based in part on the available space for water quality detention with the project limits. The final design of the stormwater quality detention basin will include a slow release outlet system that discharges to the storm sewer system while promoting infiltration through a long detention time. 13. Pedestrian Bridge Abutments • Consultant shall design the foundations for the planned pedestrian bridge over the navigable channel. 14. Retaining Walls Adjacent to Grand Avenue Bridge Consultant shall design retaining walls as necessary adjacent to the Grand Avenue Bridge to provide for a detached sidewalk with a planting zone between the curb and the sidewalk on Grand Avenue. The retaining walls shall include storage chambers with access doors. The storage chambers will be located on both sides of the navigable channel. 15 Construction Drawin , Requrremems Consultant shall provide construction drawings Using AutoCAD using a 22'x 34" sheet size. Lettering shall be of a size and weight to allow for reduction one -half size. Construction drawings shall include the following drawings at a minimum: • Cover sheet, which shall include project title showing participating agency names, signatures for approval, location map and sheet index. • Construction notes, pay limits and legends • Structural details showing reinforcing steel and all embedded elements. • Typical navigable channel cross sections • Utility relocation details (does not include design and detailed plans for relocation of electric, gas, cable television and telephone utilities) • Standard details for manholes, inlets, curb and gutter and sidewalk • Plan and profiles sheets showing area topography and horizontal alignment of site features and utilities • Plan and profiles for all sidewalks with the HARP Phase III -A project limits. Plan and profile drawings shall indicate longitudinal slopes and cross slopes for pedestrian walkways. All pedestrian sidewalks with the project limits of the HARP Phase III -A Page 5 of 8 project shall be compliant with the requirements of Americans with Disabilities Act (ADA). • Landscaping plans and details • Irrigation plans and details • Lighting plans with conduit runs and sleeving locations 16. Technical Speci& cation Requirements Consultant shall prepare technical specifications on 8 -1 /2" by 11" paper. The technical specifications shall follow the Construction Specifications Institute (CSI) format and shall include the following (but not be limited to): • Title Sheet • Approval Signature with the same approval signature lines that are shown on the construction drawings. • Bid, Invitation for Bids, Instructions to bidders (Provided by Client) • Bid Schedule • Bonds and Contracts forms (Provided by Client) • General Contract Conditions • Measurement and Payment Section for all bid items • Soils report • Technical Specifications in CSI format (Following are the anticipated technical specification sections required for the HARP Phase III -A Project) Section 01010 Section 01070 Section 01150 Section 01200 Section 01300 Section 01400 Section 01510 Section 01563 Summary of Work Abbreviations Measurement and Payment Project Meetings Submittals Quality Control Temporary Facilities Water and Erosion Control Section 01570 — Traffic Control Section 01580 — Project Sign Section 01700 — Project Closeout Section 02050 — Demolition, Clearing and Grubbing Section 02410 — Groundwater Drainage Systems Section 02425 — Chain Link Fences Section 02486 — Lawn Sodding Section 02490 — Seeding Section 02513 — Hot Mix Asphalt Paving Section 02515 — Portland Cement Concrete Flatwork Section 02580 - Pavement Markings Section 02601 - Manholes Section 02612 — Reinforced Concrete Pipe Section 02615 — Exterior Ductile Iron Pipe Page 6 of 8 Section 02641 —Valves Section 02810 — Irrigation Section 02910 — Planting Section 03300 — Cast -in -Place Concrete Section 16100- Electrical Site Improvements 17 Opinion ofProbable Construction Cost Consultant shall prepare an opinion of probable construction cost for the HARP Phase IIIA -1 project as described by the construction drawings and the technical specifications. The opinion of probable construction cost shall be based on the extension of unit prices and quantities determined by the consultant. Opinions of cost prepared by the Consultant represent Consultants best judgment as a design professional and are supplied for general guidance to the client. It shall be understood that Consultant has not control over cost of labor or material, or over competitive bidding or marketing conditions. Consultant does not guarantee that the low bidder shall provide a project cost that is at or below the opinion of probable construction cost provided by the Consultant. 18. Design Report Consultant shall provide a design report presenting the following information: Hydrologic analysis; Hydraulic analysis; Structural analysis and other pertinent information developed during the course of the design. Design report shall be bound and included among the deliverables for the Final Plan Review Meeting. 19. Project Meetings Consultant shall attend four meetings in Pueblo during the final design phase of the HARP Phase IIIA -1 project. The final design phase of the project shall be the time period from the beginning of the design phase completion of approved contract documents for the construction of the HARP Phase IIIA -1 project. • Project Kickoff meeting • 70 % Submittal Progress meeting • Final Plan Review meeting • Pre -Bid meeting 20. Plan Approval Consultant shall submit 70 % Submittal Package and Final Submittal Package with inclusions as set forth in the Deliverables Section of this Scope of Services to the following designated review entities for the HARP Phase IIIA -I project. Consultant shall submit bid tabulation subsequent to bid opening to the HARP Authority. City of Pueblo Planning Department HARP Authority Pueblo Police Department Page 7of8 • Pueblo Convention Center • Pueblo City Transportation Department • Department of Public Works • City Stormwater Utility • Pueblo Board of Water Works • City of Pueblo Water Department • City of Pueblo Wastewater Department 21. Deliverables During Final Design Phase ofFIARP Phase 771 - -A Project Kickoff Meeting- Meeting summaries for Project Kickoff meeting distributed to all attendees at the meeting and designated project participants by E -mail or FAX Project 70 % Completion Meeting - Meeting summaries far the 70% Project Completion meeting distributed to all attendees at the meeting and designated pmjectpatti ipants by E -mail or FAX • 10 sets of progress plans and project technical specifications and draft updated opinion of probable construction cost Final Plan Review Meeting - Meeting rummages for the Ptvjed ftnal Plan Retdew meeting dr'stri bute to all attendees at the meeting and designated project participants by e -mail or FAX. • 10 sets of construction drawings • 10 sets of the project manual for the HARP Phase III -A Project • 10 sets of the design report for the HARP phase III -A Project • 10 sets of the Final Opinion of Probable Construction Cost prepared by the Consultant 22. Deliverables —Final Construction Documents for Bidding • One original reproducible copy and 25 useable copies of the Final bid documents. • All documents shall be electronically provided to the Owner in standard word processing format designated by the Owner with drawings provided in AutoCAD files, readable by AutoCAD version to be specified by the Owner. Page 8 of 8 Legend f mng Sim Impmremanh dip d �a,heg Pavement I _ Concrete Sidewalk - -� Retaining Wale 111 sham Proposed Sile lnn ov nneMa Cab Conerele PaAng SMM.M Sidewalk P.mg Concrete Pavem • W er Aeretion Channel Lawn Area L W Sh.be • -- Pham One Limit Line FuWre Site Imp nen% - -� Boamoum Pedeatnan Bndge RIUEHIllNLN City of Pueblo �w.ea.ua.a.�wre��•�.am� vmm.� HARP Phase IIIA -1 Gateway Park Apn1 16, 2006 i Exhibit A DSW m�eimwanc Sellacds & Grigg, Inc. • HARP Phase IIIA -1 Gateway Park Apn1 16, 2006 i Exhibit A