Loading...
HomeMy WebLinkAbout10601RESOLUTION NO. 10601 A RESOLUTION APPROVING A PROPOSAL FROM MAXIM TECHNOLOGIES, INC. FOR THE CORRECTIVE ACTION PLAN (CAP) IMPLEMENTATION, GROUNDWATER MONITORING, PROJECT MANAGEMENT, AND REIMBURSEMENT SUPPORT AT THE PUEBLO MEMORIAL AIRPORT MAINTENANCE FACILITY IN THE AMOUNT OF $44,513 PLUS $6,677 IN CONTINGENCIES AND AUTHORIZING THE PRESIDENT OF THE CITY COUNCIL TO EXECUTE SAME WHEREAS, Maxim Technologies, Inc. has been monitoring groundwater samples at the Pueblo Memorial Airport Maintenance Facility since 1989 and the City of Pueblo accepted a proposal from Maxim Technologies, Inc. on March 28, 2005 to prepare a Corrective Action Plan (CAP) that was submitted to the State of Colorado Department of Oil and Public Safety; and WHEREAS, the State of Colorado Department of Oil and Public Safety is now granting approval to proceed with the Corrective Action Plan (CAP); now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. Maxim Technologies, Inc. Proposal No. P65009056, a copy of which is attached hereto and made part hereof by reference relating to the Corrective Action Plan (CAP) implementation, groundwater monitoring, project management, and reimbursement support at the Pueblo Memorial Airport Maintenance Facility, is hereby approved and accepted. SECTION 2. The President of City Council is hereby authorized to execute the Proposal on behalf of Pueblo, a Municipal Corporation. SECTION 3. Funds in the amount of $44,513 plus $6,677 in contingencies will be expended from the 2006 Airport Budget. INTRODUCED December 27, 2005 Mr-11 M1 BY Michael Occhiato Councilperson P O •A)0(001 Background Paper for Proposed RESOLUTION AGENDA ITEM # 0 DATE: December 27, 2005 DEPARTMENT: AVIATION - DANIEL E. CENTA, P.E. TITLE A RESOLUTION APPROVING A PROPOSAL FROM MAXIM TECHNOLOGIES, INC. FOR THE CORRECTIVE ACTION PLAN (CAP) IMPLEMENTATION, GROUNDWATER MONITORING, PROJECT MANAGEMENT, AND REIMBURSEMENT SUPPORT AT THE PUEBLO MEMORIAL AIRPORT MAINTENANCE FACILITY IN THE AMOUNT OF $44,513 PLUS $6,677 IN CONTINGENCIES AND AUTHORIZING THE PRESIDENT OF THE CITY COUNCIL TO EXECUTE SAME ISSUE Should City Council approve a proposal from Maxim Technologies for additional work at the Pueblo Memorial Airport Maintenance Facility. RECOMMENDATION Approval of this Resolution. BACKGROUND In 1989, petroleum hydrocarbon - contamination was found in groundwater at the Pueblo Airport Maintenance Facility. Since that time, Maxim Technologies has been monitoring the groundwater. In June 2003, the groundwater samples showed an increase in benzene concentrations. The State of Colorado Division of Oil and Public Safety (OPS) required an investigation to delineate the source and extent of this contamination and the submittal of a Site Characterization Report. This report was submitted to OPS and a Corrective Action Plan (CAP) was then required. The CAP was submitted to OPS and OPS is now granting approval to proceed with the CAP. This proposal is for the CAP implementation, ground water monitoring, project management and reimbursement support. FINANCIAL IMPACT Funds in the amount of $44,513 plus $6,677 in contingencies have been budgeted in the 2006 Airport Budget. A majority of these funds are eligible for reimbursement from the Colorado Department of Oil and Public Safety. /MAXIM T E C H N O L O G I E S A DIVISION OF TETRA TECH, INC. December 9, 2005 Mr. Jerry Bri enza Director of Aviation Pueblo Memorial Airport 31201 Bryan Circle Pueblo, CO 81001 363 Centennial Parkway, Suite 210 Louisville, CO 80027 -1269 Telephone: (303) 666.4392 Facsimile: (303) 665 -2961 Subject: Proposal for CAP Implementation, Three Quarters of Groundwater Monitoring and Reporting, Project Management, and Reimbursement Support, Pueblo Memorial Airport Maintenance Facility, Pueblo, Colorado Maxim Proposal No. P65009056 Dear Mr. Brienza: This letter presents a proposal and associated cost -basis spreadsheets for the Subject. The purpose of the work proposed herein is to implement the Corrective Action Plan (CAP), and conduct three rounds of quarterly groundwater monitoring with associated reporting and project management relating to the area adjacent to the Maintenance Facility at Pueblo Memorial Airport (PMA). The Colorado Department of Labor and Employment Division of Oil and Public Safety (OPS) has granted approval to proceed with the CAP. This proposal covers the site remediation activities, replacement well installation, monitoring and reporting for one year, and continued support obtaining reimbursement from the OPS Storage Tank Fund. Additional monitoring, reporting, management and closure activities will be covered in a future proposal to bring the site to closure. The scope -of -work, schedule, and costs proposed to achieve this purpose are discussed in the following sections. Work described herein will be performed in accordance with the Agreement for Professional Consulting Services that incorporates the changes to the terms and conditions mutually agreed upon by the Pueblo City Attorney and Maxim's corporate attorney, dated April 14, 2003. SCOPE OF WORK Four main tasks are proposed to accomplish the purpose of this work. Task i involves implementing the CAP; Task 2 involves conducting three rounds of quarterly groundwater monitoring; Task 3 involves groundwater- monitoring reporting and project management activities; and Task 4 involves continued support in obtaining reimbursement from the OPS Storage Tank Fund. A detailed description of the main tasks and associated subtasks is presented below. Task I— Corrective Action Plan Implementation- -This task includes subtasks and subcontractor activities to implement remediation activities at the site. • Develop scope of work for drilling and excavaon bids. Oversee and assist in the implementation of the remedial activities as outlined in the CAP. Refer to CAP for details. PMA will procure contractors to install replacement wells and Jerry Bdenza December 9, 2005 perform the excavation. The excavation and drilling scope of work is outlined in the PMA Revised Invitation for Bids, dated November 22, 2005. • Attend a PMA pre -bid meeting. • Review bids and assist in bid award. • Manage the drilling and excavation contractors and review invoices. • Conduct an MTBE assessment, per OPS requirements, including a receptor survey, an analysis of MTBE analytical results, and an MTBE Priority Classification. Task 2— Groundwater Sampling —This task includes work that will be conducted to satisfy OPS Operations and Maintenance (O &M) requirements for the CAP. This task includes three quarterly rounds of sampling and laboratory analysis of groundwater from 10 wells located in the maintenance facility area that are required to be monitored in the Corrective Action Plan. The existing wells will be purged in accordance with OPS protocol. The wells will be allowed to stabilize after pre - sample purging. Field measurements will be obtained for temperature, dissolved oxygen concentrations, pH, and conductivity parameters. Laboratory analyses of groundwater will be completed for benzene, toluene, ethyl benzene, and xylenes (BTEX) and methyl tertiary -butyl ethylene (MTBE) using EPA Method 8260B, and for total volatile petroleum hydrocarbons (TPVH) using EPA Method 8015B. One trip blank (water) will accompany the samples and will be laboratory analyzed using EPA method 8260B. One duplicate sample will be obtained and sampled for the same parameters as the original sample. Investigation- derived wastes will be containerized, transported, and disposed in compliance with applicable regulations. Maxim will document disposal procedures and provide copies of the waste manifests to Pueblo Memorial Airport. Task 3— Groundwater Report Preparation and Project Management— This task includes work that will be conducted to manage the project management and prepare reports relating to the three quarterly monitoring events and the MTBE assessment. Project management involves coordinating all project activities including scheduling and tracking laboratory analyses; updating the site - specific health and safety plan (HASP); procuring rental and expendable equipment; scheduling access with the Site owner; and managing investigative- derived waste. Groundwater report preparation involves integrating the results of the quarterly groundwater - monitoring events into three reports, including updating of tables, drawing the figures (including groundwater elevation contour map and groundwater analytical results), and submitting the reports to OPS. MTBE assessment report preparation involves reporting the results of the MTBE receptor survey, analytical data review, and MTBE Priority Classification. Page 2 Jerry Bnenza December 9, 2005 Remediation system startup and implementation report preparation involves a summary of remediation activities. Task 4— Continued Reimbursement Support —This task includes subtasks and subcontractor activities to continue obtaining reimbursement for allowable costs through the OPS Storage Tank Fund. • Continue the ongoing process of allowable cost reimbursement from the State Storage Tank Fund as detailed in Maxim's proposal to Pueblo Memorial Airport, dated November 9, 2004. COST ESTIMATE The following breakdown presents the estimated costs by task, including labor and ODCs, to complete the above detailed scope of work: Task 1--CAP Implementation $ 20,961 Task 2 -3 Rounds of Quarterly Groundwater Monitoring $16,193 Task 3— Groundwater Reporting and Project Management $ 4,755 Task 4--Continued Reimbursement Support $ 2,604 Total Estimated Costs $ 44,513 Maxim proposes to perform the foregoing scope of work under on a Time and Materials basis with a total cost not to exceed $44,513. Costs will be invoiced on a monthly basis and payment will be due within 30 days of receipt of invoice. Costs are detailed on the attached cost basis spreadsheet. Please refer to the Economic Feasibility Summary (EFS) in the CAP for a breakdown of potentially reimbursable costs and further cost basis detail relating to excavation, Startup and Implementation Report preparation, and well sampling. Most of the drilling and excavation and much of the scope of work presented in this proposal are expected to be reimbursable. The difference between the potentially reimbursable costs and actual costs results from the following items that are not allowed to be included in the EFS: • By PMA directly hiring the excavation and drilling contractors, the markup on subcontractors no longer apples, therefore, all non -field work relating to the contractors will not be reimbursable • Clean overburden soils excavation and replacement • QA/QC laboratory analyses (trip blanks, duplicates) • Swell factor in soils resulting in a higher actual volume for transportation and disposal (assumed to be approximately 20 %) • Additional travel time required due to the site location • Project management and general consulting services, including regulatory interface • Preparation of a site specific health and safety plan • Additional site visit(s) to address unforeseen conditions Page 3 Jeny Bnenza December 9, 2005 • Surveying and GPS locating of the replacement wells • Some of the reimbursement application research and preparation SCHEDULE AND AVAILABILITY Maxim is available to begin this project within two weeks of notification to proceed. Excavation is expected to take one to two weeks. Replacement wells are expected to be installed within three weeks of completion of excavation. The remediation startup and implementation report will be submitted within three weeks of installation of the new wells. Maxim proposes to complete the quarterly groundwater monitoring in March, June, and September of 2006. Field work will take approximately two days for each round of monitoring. The Groundwater Monitoring Report will be completed for PMA's review and comments within 30 days of the completion of each quarterly field program. Reimbursement support will continue on an as- needed basis. Please sign the acceptance box below to authorize the work to commence. We appreciate this opportunity to support Pueblo Memorial Airport with your environmental requirements. Please contact me at (303) 665 -4392 if you have any questions or comments regarding this proposal. Sincerely, Rev: KT Att: Cost Basis Spreadsheet EFS CLIENT: C f eb Accepted obert Schil Jr. Title: Presid nt of C't ouncil Date: December 27, 2005 Page 4 Denver Operations COST BASIS SPREADSHEET Pueblo Memorial Airpo 31201 Bryan Circle, Pueblo, Co M aintenance Facility Groundwater Sampli CAP Imp lementation Groundwater Reporting, Proje M an_ag_ement antl Reimbursement Support Dale December 9, 2005 ProposalC P5500 Task 1 Task 2 Task 3 Task 4 LA ___ Project Manager CAP Impementation Groundwater Monitoring G W Reporting Management and Reimburse antSupport Category Total Rate OTY � - Amount ___.. unt a0 $3,680 _ 8. $592 8 4 $ _ $184 40 20 $1,260 mt GTV. _ Amount -- 6 $552 0 $0 24 $15 CITY. -__ 18 0 M 12 8 0 W. QTV. A 0 $0 0' $0 0 $0 QTY. Amount Amount $1,656 $0 $ 2,2 6 8 $552 $9200 $]4.00 -- $4600 $3500 64 8 $_5,888 $592 Project �_ �- CAD O erson rails - - p _ 148 $9,324 0 $0 0 $0 16 $1,134 _ i6 $736 Cled al Coude Geologist O mer Travel T a $260 _. $0 _ 60 $2,100 $0 _ _ _ ]0 _ $2,450 $6300 38 $2,394 - -- La To tal 156: $10,896 48 $3,198 72 $4,686 0 $ 68 $2,604 344 $21,384 $5000 ODCS TravellShipping _.. 8 $400 $ 8 $280 8 $552 700 $252 0 $0 ..____ 14 $]00 F ield Vehicle/Day -_ _. 6' $300 8 $210 3 $20] 700 $252 Per Diem Lodging $35 .00 $6900 $0360 0. $0 0..._ 0 $0 0. $0 --- - - 0i -- $0 0 $0 14 $490 _ - -- 11 $759 Vehicle Mileage/mile 14W $504 Travel Total Equipment Rental PI ORental /d pH /contluMVrymeter /tlay -_ __ - Wate Le vel Meter /day DO meter/day $4000 $5500 $1,576 8 $320 0 $0 -- 1 $10 0 $0 8., _____$ $3 1 $30 1 $250 8 $184 6 fi 6 fi 0 � ._ $969 8240 $330 $60 $330 $0 $69 $0 $2,614 O 50 0 $0 0 $0 0 $0 0 $0 0 $0 14 $560 0 0 $0 __. $0 6 $330 $1000 $5500 ] $70 0 _$0 0 $0 8 $330 Lantech LEUO2O02 Meter /tlay _ Interface ProOe/tlay PelrcOag rental /week _. $5000 $3000 $250.00 _ 81 $400 0 6 $0 6 $138 -- -_ -- 0 $0 0, $0 0 $0 - _ _ C, 0 $0 $0 _ - _ 1 1 _ $30 $250 FIeItl Supplies S231dav $23.00 0 $0 14 $322 Maxim Fee 15% 0% $0 $0 $0 $0 0 $0 Equipment Total $1,194 0 100 $1098 $ 0 $0 $2,292 Expendlbles 23 $SBB 100 $100 $0 $ 100 - 0 0 __..___ Petroflag Kite Miscellane SUpplie $2600 $1.00 $6 $0 0 0 $0 $0 23' $59 200 $200 Maxim Fee 15% 15% $195 $15 $0 $0 i _ $120 Expendibles Total $$6600 $803 -_ -. 1 $ $6 6 $115 $0 36 $2376 $0 _ 0 $0 01 $0 0 $0 0 so 0 $0 0 $0 $0 $918 Expedited TAT Premium/sample B TEX/MTBE(8260}a aiysis/sampie- Groundw 0 ' $0 0 $0 0� $0 4 37 $432 $2,42 BTE%RVPHS (8021, 8015) analysis/sample-Soil TPH Sam P elroflaQConelahon T VPH Analys - Groundwat /samp $10800 $2300 $6600 30 10 0 $3,240 $230 $0 0 $0 0 $0 33 $2178 0� $0 Al 30 10 $3,2240 0 o $0 $0 $230 33 $2,178 _ RI CITCLP W aste Cha2clenzat on Maxim Fee 15% $13000 15% 1 $130 $615 0 $0 $0 1 125 $130 $0 $1,298 Lab l RadAVeek $12500 $4,713 1 $125 i 0 $5,237 -. $0 $0 0 $0 $0 $9,950 Su neyl� __ Survey level and 0 $0 1 $125 Surveying T.Ul Other $116000 $12145 $125 1 $1,160 _ _ 0 $0 01 30 $0 _$0 _ $3,664 0 0 $0 $0 O $0 _ _.. 0 $0 $125 Slaril Implementation Repon - per EFS Sam le Wells- per EFS each $0 $0 1 1, $1,180 30 $3,644 Other Total $1,160 1_ $3,644 of $0 6 - $0 3 $420 _6 _ _ $270 6 $570 6 $420 $252 1 0 0 0 $0 _ _. $4,804 _ _$0 _ 0 $0 Well Perm ting 8 Waste D sposal Permit (Intent) Fee/Well _ GPS Field Unit/ Mlkmn Waste Disposal Flat Fee/Dmm(14 dorms) $19000 $5 2 1 Oa 0 0 0 $380 $ 50 $0 _ $0 _ $0 $0 $65 _ $0 $0 _ 2 1 $380 $50 0 $0 0 $0 _ 0 $0 0 $0 0 $0 $0 3 $420 Dorm Cast Wavle Disposal /Drum __ $4500 $95.00 0 0' _$0 $0 fi $270 _ _ 6 $570 $420 Lift Truck /hour Maxim Fee 15% $7000 15% 0' $0 $0 6 1 _ _ _ _ $0 $317 Permitting 8 Waste Disposal Total ODIC Total $495 $10,065 $1,93 $12,995 $0 $69 $0 $2,427 $0 $23,1 Task Total $20,661 $16,193 $4,755 $2,604 $44,51 Total Cost $44 51 CAP lmpkmenraton Foal 1 of 1