Loading...
HomeMy WebLinkAbout10585RESOLUTION NO. 10585 A RESOLUTION AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE AND DELIVER AN APPLICATION TO THE DEPARTMENT OF LOCAL AFFAIRS FOR STATE ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM FUNDS TO FUND ADA IMPROVEMENTS TO EL CENTRO DEL QUINTO SOL COMMUNITY CENTER BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: The President of the City Council is hereby authorized to execute and deliver the attached application requesting State Energy and Mineral Impact Assistance Funds in the name of the City, to the Department of Local Affairs to fund ADA improvements to El Centro Del Quinto Sol Community Center. INTRODUCED December 12, 2005 APP ' 9F CITY - CPYWIL BY Michael Occhiato Councilperson Background Paper for Proposed RESOLUTION )&O. # KTSgS AGENDA ITEM # j I DATE: 12, 2005 DEPARTMENT: COMMUNITY DEVELOPMENT /JIM MUNCH PLANNING DEPARTMENT /JIM MUNCH TITLE A RESOLUTION AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE AND DELIVER AN APPLICATION TO THE DEPARTMENT OF LOCAL AFFAIRS FOR STATE ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM FUNDS TO FUND ADA IMPROVEMENTS TO EL CENTRO DEL QUINTO SOL COMMUNITY CENTER ISSUE Should the City Council submit an Energy and Mineral Impact Assistance Fund application to the Department of Local Affairs requesting financial assistance to fund ADA improvements to El Centro Del Quinto Sol Community Center? Approve the Resolution. BACKGROUND The City of Pueblo is required by the Department of Justice Settlement Agreement DJ 204 -13 -269 to make ADA improvements or to close the El Centro Del Quinto Sol facility within three years from the effective date of the agreement. The City of Pueblo has engaged the firm of Architectural Innovations to prepare an inspection and report on the non - compliant ADA issues, preliminary design solutions, and budget of expected costs to make the facility compliant. The firm has completed the study and has identified the cost to construct the needed facility improvements to be $621,000. An additional 15% or $93,150 has been included for contingencies and 10% or $71,415 is included for the architectural, engineering and testing fees resulting in a total project cost of $785,565. FINANCIAL IMPACT The City of Pueblo has budgeted $200,000 in the 2005 budget (CP0504) and an additional $200,000 in the 2006 budget for this project. The City will be requesting the balance of $385,565 from the Department of Local Affairs. Rev 71W STATE OF COLORADO # (For Use by State) Department of Local Affairs ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM APPLICATION Public Facilities/Public Services/Community Development Projects (Refer to back page for application filing information) A. GENERAL AND SUMMARY INFORMATION 1. Namefrrtle of Proposed Project: El Centro Del Quinto Sol Community Center ADA Improvements 2. Applicant: City of Pueblo (In the case of a multilurisdictional application, name of the "lead" municipality, county, special districts or other polilcal Subdivision). In the case of a multi - jurisdictional application, names of other directly participating political subdivisions: City of Pueblo If applying on behalf of a non -profit corporation, the eligible local government must assume responsibility for the administration of any funds awarded. Name of the non -profit corporation: N/A 3. Chief Elected Official (In the case of a multi - jurisdictional application, chief elected official of the "lead" political subdivision): Name: Robert Schilling _ Title: President of City Council Mailing Address: 1 City Hall Place Phone: (719) 553 -2655 E -mail Address: rschillinmMpueblo us Fax: (719) 553 -2698 4. Designated Contact Person for the Application Name: James F. Munch Title: Asst City Mar. Community Development Mailing Address: 211 E. D Street Pueblo CO 81003 Phone: (719) 553 -2242 E -mail Address: imunchgbpueblo us Fax: (719) 553 -2359 5. Amount requested: 38$ 5.565 Does the applicant jurisdiction have the ability to receive and spend state grant funds under TABOR spending limitations? Yes X No If no, please explain. 6. Brief Description of Proposed Project (iw v rds or less): The City of Pueblo is requesting $385.565 to fund ADA re aired impr ovements to the El Centro Del Quinto Sol Recreation Center. This facility is the C only Recreation center. It was established in 1976 when the former Fountain Elementary School was demolished except for th gymnasium which was retained and modified to create the Center. The Cent serves grimadly the City's H ispanic eastside neiahborhood In 2004 following an ADA investigation the City entered into a settlement a areement which requires the City to complete the required ADA modifications within a three -year_ pe riod. The total cost for the improvements is $601,000, the City in the oast two years ha budgeted $400.000 for the improvements. 7. a. Local priority as assigned by county -wide impact team: Relative to other applications (e.g., 1 of 2, 2 of 4, etc.) submitted by jurisdictions in the county in current fund cycle. b. What is the composition of the countywide impact team? (e.g., energy /mineral industry representation, county commissioners, municipalities, schools districts, emergency service agencies, etc.). Page 1 of 5 Pages S. DEMOGRAPHIC AND FINANCIAL INFORMATION 1. Population a. What was the 2000 population of the applicant jurisdiction? 102 121Citv of Pueblo (Census) 2. b. What is the current estimated population for the applicant jurisdiction? 105,000 (2005 estimate) (current/most recent lottery distribution estimate is acceptable.) What is the source of the estimate? City of Pueblo Department of Planning Update of 2004 lottery estimate using new h ousing starts c. What is the population projection for the applicant in 5 years? 108,000 What is the source of the projection? City of Pueblo Department of Planning Financial Information (Provide for all municipalities, counties, and political subdivisions directly participating in the application and for any entity on whose behalf the application is being submitted. Attach additional sheets if necessary). ❑ Sum of mall levies of overlapping jurisdictions (e.g., sum of levies including applicant's levy and other taxing entities such as special districts, school district, etc.). ❑ For fund most relevant to application (e.g., General Fund, Sewer Fund, etc.). ❑ Use only In the case of nadh jurisdictional or on- behaN-of applications to provide the requested information for other directly participating antities. ❑ Not required ff not relevant to application. V Divide sum of monthly residential revenues by number of residential taps served. Page 2 of 5 Pages Entity Name Entity NameO Entity Name0 a. Assessed Valuation (Year 2004 ) $539,427,500 b. Mill Levy /Annual Revenue 15.633/$8,189,000 c. Sales Tax Rate ( %) /Annual Revenue 3.5 %/$42,288,902 d. Long -Term Finance Obligation, by Type/Amount e. Annual Budget FundO General Year 2005 Total Amount $68,852.894 Fund Cash Balance (as of 1 /1 / $19,700,000 f. Water0 (water projects only) Tap Fee - Res. 1" line, inci. Plant investment fee $2,533 Avg. Monthly User ChargesO $26.31 Number of Taps Served by Applicant 38,756 Fund Cash Balance (as of 1/1/-N) $16,887,000 g. SewerO Tap Fee $1,150 Avg. Monthly User Charges0 $11.96 Number of Taps Served by Applicant 34,820 Fund Cash Balance (as of 12/31/04) $7516.150 ❑ Sum of mall levies of overlapping jurisdictions (e.g., sum of levies including applicant's levy and other taxing entities such as special districts, school district, etc.). ❑ For fund most relevant to application (e.g., General Fund, Sewer Fund, etc.). ❑ Use only In the case of nadh jurisdictional or on- behaN-of applications to provide the requested information for other directly participating antities. ❑ Not required ff not relevant to application. V Divide sum of monthly residential revenues by number of residential taps served. Page 2 of 5 Pages ,... � .,n �nr V. rr%Lhpm i r mu WG 1 PROJECT REVENUES PROJECT EXPENDITURES Project Budget Items Total Impact Other Funds Requested or Committed (If a direct impact, multi -year Cost Assistance request, subtotal by year or include budgets as an attachment for the additional years). Amount Source Unit Cost Status' Land Acquisition General Fund Design (Archttect/Engineedng) $ 71,415 $ 71,415 Conservation Committed Trust Fund Constriction (List by Unit Costs) $714,150 $385,565 $328,5 Conservation Committed Trust Fund Exterior Accessible Routes 2,000 Drinking Fountains 6,000 Ramps 10,000 Stairs 22,000 Entrances and Exits 71,000 Doors and Gates 42,000 Elevators 275,000 Toilet Rooms and Bathrooms 52,000 Signage 3,000 Alarms 60,000 Detectable Warnings 1,000 Basement Fire Sprinkler 75,000 contingency enc at 15% 93 TOTAL $785,565 $385,565 $400,000 e.g., committed, in application stage, etc. D. RELATIONSHIP TO ENERGY /MINERAL IMPACT. Assistance program is to provide financial assistance to an opportunity for the applicant to p of application to those impacts. The statutory purpose to the Energy and Mineral Impact Is and mineral fuels This section of the application is it energy /mineral impacts, both direct and indirect, and the 1. Explain how this project is directly or indirectiv related to energy /mineral impacts, including whether it mitigates any adverse impacts. Many of the families which are employed in the local energy /mineral sectors reside within Pueblo's eastside neighborhoods. This recreation facility serves those families. 2. a. What direct energy /mineral impacts are being experienced by the applicant? Examples of direct impacts include: road /bridge /culvert damage, fire protectiontemergency medical services, dust suppression, sound visual mitigation, weed control, economic boom /busts and other direct physical, social or economic impacts. Energy /mineral sector employment continues to show a general trend of decline, due primarily to reduction in the demand for oil exploration pipe products manufactured by Rocky Mountain Steel Mills. (Please see attached table). For the third quarter of 1995, energy /mineral sector workers in Pueblo numbered 2,337. For 3 quarter 2006, this sector's employment was 1,665. This represents a 29.2% decrease. Although Rocky Mountain Steel will be hiring approximately 150 workers to reopen its pipe mill, the demand for seamless pipe remains volatile. b. What types and amounts of local funds and resources are being used by the applicant to address direct energy /mineral impacts? Examples of funds and resources include: road and bridge funds, Highway User Trust Fund allocations, industry assessments or contributions, sales or property taxes, staff time, etc. Pueblo has a 0.6 -cent sales tax which is used to attract primary jobs, and we use numerous funding sources to create affordable housing and community amenities. Page 3 of 5 Pages 3. List energy /mineral activities (past, present and future) affecting the applicant. Be as specific as possible by listing company names, locations, production levels, employment levels, etc. Include not only production projects (e.g., oil, gas, carton dioxide, coal, molybdenum, gold, etc.), but also processing, transmission (e.g., oil /gas pipelines, electric transmission lines, etc.), transportation (e.g., roads, rail lines, etc.) and energy conversion facilities (e.g., coal and gas -fired electric generating facilities). Subsequent to the strike of 1997, RMS is operating with a work force of approximately 300 less than at the pre- strike level. RMS has reopened the seamless tube mill, employing an additional 150 workers, which is directly related to demand for seamless tube products for the oil industry, there remains considerable fluctuation in demand and employment. Abandonment of rail lines located E/W through Pueblo as a result of the UP/SP rail merger resulted in a loss of approximately 139 workers and Shipment of ENV coal through Pueblo. The expansion of Xcel's Comanche coal fired generating facility will result in an additional 1000 construction jobs over a 4 year period and an additional 30 to 40 permanent jobs created to operate the facility. Please see attached Related Employment. 4. Are energy /mineral companies that impact the applicant jurisdiction aware of and supportive of this request? Yes No X Attach supporting documentation when appropriate. They are not directly aware of the request. E. OTHER PROJECT INFORMATION 1. Why is the project needed? What are the specific goals of the project? The El Centro facility was created from the former Fountain Elementary School gymnasium in 1976. When the facility was created, ramps and other accessibility improvements were made to the building. These improvements do not meet current ADA standards. The City entered into a settlement agreement, which requires this facility to be brought up to standard within three years, or the facility will be closed. The City reeds these additional funds to meet the deadline of having the improvements completed within the three - year period. Funding through the Department of Local Affairs will allow the City to meet this deadline. 2. How were the cost estimates arrived at? Have preliminary architectural /engineering studies been completed? What additional design work must still be completed? (Attach preliminary engineering reports, architectural drawings, cost estimates.) The City has hired the firm of Architectural Innovations to perform the analysis, prepare preliminary architectural /engineering studies, and preliminary cost estimates which are attached. Final construction drawings remain to be prepared. 3. a. Describe local commitment to the project, including local fees or regulations altered to ensure project success, local taxing efforts to address continuing development and maintenance needs, and local citizen support. Describe any in -kind contributions, by type and value, in support of this project. The City has budgeted $W,000 in support of this project. These funds include General Fund and funds from the Conservation Trust Fund. b. Was the cash value of the in -kind contributions calculated into the Project Budget (C)? Yes _ No X 4. What other funding alternatives have been explored? City General Fund and Community Development Black Grants 5. Has the applicant jurisdiction been subject to any refund under TABOR or statutory tax limitations? Has the applicant sought voter approval to keep revenues above fiscal spending limits ?Yes _ No X If yes, please explain. When required, the City has sought voter approval to keep revenues above fiscal annual spending limits. Only once has the City not received voter approval. In 2003 a broad based citizen initiative to remove the City from TABOR spending limits failed. Page 4 of 5 Pages 6. If the applicant jurisdiction is classified as an enterprise under TABOR, will acceptance of a state grant affect this status? Yes_ No X Please explain. 7. If the project is funded, what on -going operational obligations will be incurred? What is the applicant's plan for addressing these additional costs? (Attach a detailed budget showing annual operating revenues and expenses, by amounts and sources.) No ongoing operational obligations 8. When do you expect the project to start? 2006 When will lt be completed? Summer 2007 9. Indicate below whether any of the proposed project activities: a. Will be undertaken in flood hazard areas. Yes No X List flood plain mapststudies reviewed in reaching this conclusion. Describe altematives considered and mitigation proposed. b. Will affect historical, archeological or cultural resources, or be undertaken in geological hazard area? Yes _ No X Describe aftematives considered and mitigation proposed. c. Create or fail to address any other related public health or safety concerns? Yes — No X Describe. To the best of my knowledge and belief, the statements end data in this ap 'cation are true and correct. i nature, Chief Ele O cial Name (typed or printed) Date Please submit one original and three copies to Sue Schneider Department of Local Affairs 222 South Sixth Street #409 Grand Junction, Colorado 81501 Also submit: ► 1 copy to the local Council of Governments or Regional Planning Commission No 1 copy to the local county impact (prioritization) team Attachments List (check and submit if applicable; one set per application): ► Preliminary Engineering Reports ► Architectural Drawings ► Cost Estimates ► Map showing location of the project ► Scope of Work Page 5 of 5 Pages Preliminary Cost Estimates Exterior Accessible Routes $ 2,000 Drinking Fountains 8,000 Ramps 10,000 Stairs 22,000 Entrances and Exits 71,000 Doors and Gates 42,000 Elevators 275,000 Toilet Rooms and Bathrooms 52,000 Signage 3,000 Alarms 60,000 Detectable Warnings 1,000 Basement Fire Sprinkler 75,000 Contingency at 15% 93,150 Total $714,150 Architect/Engineering 71,415 Grand Total $785,565