HomeMy WebLinkAbout10585RESOLUTION NO. 10585
A RESOLUTION AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE AND
DELIVER AN APPLICATION TO THE DEPARTMENT OF LOCAL AFFAIRS FOR STATE ENERGY
AND MINERAL IMPACT ASSISTANCE PROGRAM FUNDS TO FUND ADA IMPROVEMENTS TO
EL CENTRO DEL QUINTO SOL COMMUNITY CENTER
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
The President of the City Council is hereby authorized to execute and deliver the attached
application requesting State Energy and Mineral Impact Assistance Funds in the name of the City,
to the Department of Local Affairs to fund ADA improvements to El Centro Del Quinto Sol
Community Center.
INTRODUCED December 12, 2005
APP
' 9F CITY - CPYWIL
BY Michael Occhiato
Councilperson
Background Paper for Proposed
RESOLUTION
)&O. # KTSgS
AGENDA ITEM # j I
DATE:
12, 2005
DEPARTMENT: COMMUNITY DEVELOPMENT /JIM MUNCH
PLANNING DEPARTMENT /JIM MUNCH
TITLE
A RESOLUTION AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE
AND DELIVER AN APPLICATION TO THE DEPARTMENT OF LOCAL AFFAIRS FOR
STATE ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM FUNDS TO
FUND ADA IMPROVEMENTS TO EL CENTRO DEL QUINTO SOL COMMUNITY
CENTER
ISSUE
Should the City Council submit an Energy and Mineral Impact Assistance Fund
application to the Department of Local Affairs requesting financial assistance to fund
ADA improvements to El Centro Del Quinto Sol Community Center?
Approve the Resolution.
BACKGROUND
The City of Pueblo is required by the Department of Justice Settlement Agreement DJ
204 -13 -269 to make ADA improvements or to close the El Centro Del Quinto Sol facility
within three years from the effective date of the agreement. The City of Pueblo has
engaged the firm of Architectural Innovations to prepare an inspection and report on
the non - compliant ADA issues, preliminary design solutions, and budget of expected
costs to make the facility compliant. The firm has completed the study and has
identified the cost to construct the needed facility improvements to be $621,000. An
additional 15% or $93,150 has been included for contingencies and 10% or $71,415 is
included for the architectural, engineering and testing fees resulting in a total project
cost of $785,565.
FINANCIAL IMPACT
The City of Pueblo has budgeted $200,000 in the 2005 budget (CP0504) and an
additional $200,000 in the 2006 budget for this project. The City will be requesting the
balance of $385,565 from the Department of Local Affairs.
Rev 71W STATE OF COLORADO #
(For Use by State)
Department of Local Affairs
ENERGY AND MINERAL IMPACT ASSISTANCE PROGRAM APPLICATION
Public Facilities/Public Services/Community Development Projects
(Refer to back page for application filing information)
A. GENERAL AND SUMMARY INFORMATION
1. Namefrrtle of Proposed Project: El Centro Del Quinto Sol Community Center ADA Improvements
2. Applicant: City of Pueblo
(In the case of a multilurisdictional application, name of the "lead" municipality, county, special districts or other polilcal Subdivision).
In the case of a multi - jurisdictional application, names of other directly participating political subdivisions:
City of Pueblo
If applying on behalf of a non -profit corporation, the eligible local government must assume responsibility for the
administration of any funds awarded. Name of the non -profit corporation: N/A
3. Chief Elected Official (In the case of a multi - jurisdictional application, chief elected official of the "lead" political
subdivision):
Name: Robert Schilling _ Title: President of City Council
Mailing Address: 1 City Hall Place Phone: (719) 553 -2655
E -mail Address: rschillinmMpueblo us Fax: (719) 553 -2698
4. Designated Contact Person for the Application
Name: James F. Munch Title: Asst City Mar. Community Development
Mailing Address: 211 E. D Street Pueblo CO 81003 Phone: (719) 553 -2242
E -mail Address: imunchgbpueblo us Fax: (719) 553 -2359
5. Amount requested: 38$ 5.565 Does the applicant jurisdiction have the ability to receive and spend state grant
funds under TABOR spending limitations? Yes X No If no, please explain.
6. Brief Description of Proposed Project (iw v rds or less): The City of Pueblo is requesting $385.565 to fund ADA
re aired impr ovements to the El Centro Del Quinto Sol Recreation Center. This facility is the C only
Recreation center. It was established in 1976 when the former Fountain Elementary School was demolished
except for th gymnasium which was retained and modified to create the Center. The Cent serves grimadly
the City's H ispanic eastside neiahborhood In 2004 following an ADA investigation the City entered into a
settlement a areement which requires the City to complete the required ADA modifications within a three -year_
pe riod. The total cost for the improvements is $601,000, the City in the oast two years ha budgeted $400.000
for the improvements.
7. a. Local priority as assigned by county -wide impact team: Relative to other applications (e.g., 1
of 2, 2 of 4, etc.) submitted by jurisdictions in the county in current fund cycle.
b. What is the composition of the countywide impact team? (e.g., energy /mineral industry representation,
county commissioners, municipalities, schools districts, emergency service agencies, etc.).
Page 1 of 5 Pages
S. DEMOGRAPHIC AND FINANCIAL INFORMATION
1. Population
a. What was the 2000 population of the applicant jurisdiction? 102 121Citv of Pueblo (Census)
2.
b. What is the current estimated population for the applicant jurisdiction? 105,000 (2005 estimate)
(current/most recent lottery distribution estimate is acceptable.) What is the source of the estimate?
City of Pueblo Department of Planning Update of 2004 lottery estimate using new h ousing starts
c. What is the population projection for the applicant in 5 years? 108,000
What is the source of the projection? City of Pueblo Department of Planning
Financial Information
(Provide for all municipalities, counties, and political subdivisions directly participating in the application and for
any entity on whose behalf the application is being submitted. Attach additional sheets if necessary).
❑ Sum of mall levies of overlapping jurisdictions (e.g., sum of levies including applicant's levy and other taxing entities such as special
districts, school district, etc.).
❑ For fund most relevant to application (e.g., General Fund, Sewer Fund, etc.).
❑ Use only In the case of nadh jurisdictional or on- behaN-of applications to provide the requested information for other directly
participating antities.
❑ Not required ff not relevant to application.
V Divide sum of monthly residential revenues by number of residential taps served.
Page 2 of 5 Pages
Entity Name
Entity NameO
Entity Name0
a. Assessed Valuation (Year 2004 )
$539,427,500
b. Mill Levy /Annual Revenue
15.633/$8,189,000
c. Sales Tax Rate ( %) /Annual Revenue
3.5 %/$42,288,902
d. Long -Term Finance Obligation,
by Type/Amount
e. Annual Budget
FundO General
Year 2005
Total Amount
$68,852.894
Fund Cash Balance (as of 1 /1 /
$19,700,000
f. Water0 (water projects only)
Tap Fee - Res. 1" line, inci. Plant investment
fee
$2,533
Avg. Monthly User ChargesO
$26.31
Number of Taps Served by Applicant
38,756
Fund Cash Balance (as of 1/1/-N)
$16,887,000
g. SewerO
Tap Fee
$1,150
Avg. Monthly User Charges0
$11.96
Number of Taps Served by Applicant
34,820
Fund Cash Balance (as of 12/31/04)
$7516.150
❑ Sum of mall levies of overlapping jurisdictions (e.g., sum of levies including applicant's levy and other taxing entities such as special
districts, school district, etc.).
❑ For fund most relevant to application (e.g., General Fund, Sewer Fund, etc.).
❑ Use only In the case of nadh jurisdictional or on- behaN-of applications to provide the requested information for other directly
participating antities.
❑ Not required ff not relevant to application.
V Divide sum of monthly residential revenues by number of residential taps served.
Page 2 of 5 Pages
,... � .,n �nr
V. rr%Lhpm i r mu WG 1
PROJECT REVENUES
PROJECT EXPENDITURES
Project Budget Items
Total
Impact
Other Funds Requested or Committed
(If a direct impact, multi -year
Cost
Assistance
request, subtotal by year or include
budgets as an attachment for the
additional years).
Amount
Source
Unit Cost
Status'
Land Acquisition
General Fund
Design (Archttect/Engineedng)
$ 71,415
$ 71,415
Conservation
Committed
Trust Fund
Constriction (List by Unit Costs)
$714,150
$385,565
$328,5
Conservation
Committed
Trust Fund
Exterior Accessible Routes 2,000
Drinking Fountains 6,000
Ramps 10,000
Stairs 22,000
Entrances and Exits 71,000
Doors and Gates 42,000
Elevators 275,000
Toilet Rooms and Bathrooms 52,000
Signage 3,000
Alarms 60,000
Detectable Warnings 1,000
Basement Fire Sprinkler 75,000
contingency enc at 15% 93
TOTAL
$785,565
$385,565
$400,000
e.g., committed, in application stage, etc.
D. RELATIONSHIP TO ENERGY /MINERAL IMPACT.
Assistance program is to provide financial assistance to
an opportunity for the applicant to
p of application to those impacts.
The statutory purpose to the Energy and Mineral Impact
Is and mineral fuels This section of the application is it
energy /mineral impacts, both direct and indirect, and the
1. Explain how this project is directly or indirectiv related to energy /mineral impacts, including whether it mitigates
any adverse impacts.
Many of the families which are employed in the local energy /mineral sectors reside within Pueblo's eastside
neighborhoods. This recreation facility serves those families.
2. a. What direct energy /mineral impacts are being experienced by the applicant? Examples of direct impacts
include: road /bridge /culvert damage, fire protectiontemergency medical services, dust suppression, sound
visual mitigation, weed control, economic boom /busts and other direct physical, social or economic impacts.
Energy /mineral sector employment continues to show a general trend of decline, due primarily to reduction
in the demand for oil exploration pipe products manufactured by Rocky Mountain Steel Mills. (Please see
attached table). For the third quarter of 1995, energy /mineral sector workers in Pueblo numbered 2,337. For
3 quarter 2006, this sector's employment was 1,665. This represents a 29.2% decrease. Although Rocky
Mountain Steel will be hiring approximately 150 workers to reopen its pipe mill, the demand for seamless
pipe remains volatile.
b. What types and amounts of local funds and resources are being used by the applicant to address
direct energy /mineral impacts? Examples of funds and resources include: road and bridge funds,
Highway User Trust Fund allocations, industry assessments or contributions, sales or property taxes,
staff time, etc.
Pueblo has a 0.6 -cent sales tax which is used to attract primary jobs, and we use numerous funding sources
to create affordable housing and community amenities.
Page 3 of 5 Pages
3. List energy /mineral activities (past, present and future) affecting the applicant. Be as specific as possible by listing
company names, locations, production levels, employment levels, etc. Include not only production projects (e.g., oil,
gas, carton dioxide, coal, molybdenum, gold, etc.), but also processing, transmission (e.g., oil /gas pipelines, electric
transmission lines, etc.), transportation (e.g., roads, rail lines, etc.) and energy conversion facilities (e.g., coal and
gas -fired electric generating facilities).
Subsequent to the strike of 1997, RMS is operating with a work force of approximately 300 less than at the pre-
strike level. RMS has reopened the seamless tube mill, employing an additional 150 workers, which is directly
related to demand for seamless tube products for the oil industry, there remains considerable fluctuation in
demand and employment. Abandonment of rail lines located E/W through Pueblo as a result of the UP/SP rail
merger resulted in a loss of approximately 139 workers and Shipment of ENV coal through Pueblo. The
expansion of Xcel's Comanche coal fired generating facility will result in an additional 1000 construction jobs
over a 4 year period and an additional 30 to 40 permanent jobs created to operate the facility. Please see
attached Related Employment.
4. Are energy /mineral companies that impact the applicant jurisdiction aware of and supportive of this request?
Yes No X Attach supporting documentation when appropriate.
They are not directly aware of the request.
E. OTHER PROJECT INFORMATION
1. Why is the project needed? What are the specific goals of the project?
The El Centro facility was created from the former Fountain Elementary School gymnasium in 1976. When
the facility was created, ramps and other accessibility improvements were made to the building. These
improvements do not meet current ADA standards. The City entered into a settlement agreement, which
requires this facility to be brought up to standard within three years, or the facility will be closed. The City
reeds these additional funds to meet the deadline of having the improvements completed within the three -
year period. Funding through the Department of Local Affairs will allow the City to meet this deadline.
2. How were the cost estimates arrived at? Have preliminary architectural /engineering studies been completed?
What additional design work must still be completed? (Attach preliminary engineering reports, architectural
drawings, cost estimates.)
The City has hired the firm of Architectural Innovations to perform the analysis, prepare preliminary
architectural /engineering studies, and preliminary cost estimates which are attached. Final construction
drawings remain to be prepared.
3. a. Describe local commitment to the project, including local fees or regulations altered to ensure project success,
local taxing efforts to address continuing development and maintenance needs, and local citizen support.
Describe any in -kind contributions, by type and value, in support of this project.
The City has budgeted $W,000 in support of this project. These funds include General Fund and funds from
the Conservation Trust Fund.
b. Was the cash value of the in -kind contributions calculated into the Project Budget (C)? Yes _ No X
4. What other funding alternatives have been explored?
City General Fund and Community Development Black Grants
5. Has the applicant jurisdiction been subject to any refund under TABOR or statutory tax limitations? Has the applicant
sought voter approval to keep revenues above fiscal spending limits ?Yes _ No X
If yes, please explain.
When required, the City has sought voter approval to keep revenues above fiscal annual spending limits. Only
once has the City not received voter approval. In 2003 a broad based citizen initiative to remove the City from
TABOR spending limits failed.
Page 4 of 5 Pages
6. If the applicant jurisdiction is classified as an enterprise under TABOR, will acceptance of a state grant affect this
status? Yes_ No X Please explain.
7. If the project is funded, what on -going operational obligations will be incurred? What is the applicant's plan for
addressing these additional costs? (Attach a detailed budget showing annual operating revenues and expenses,
by amounts and sources.)
No ongoing operational obligations
8. When do you expect the project to start? 2006 When will lt be completed? Summer 2007
9. Indicate below whether any of the proposed project activities:
a. Will be undertaken in flood hazard areas. Yes No X List flood plain mapststudies reviewed in
reaching this conclusion. Describe altematives considered and mitigation proposed.
b. Will affect historical, archeological or cultural resources, or be undertaken in geological hazard
area? Yes _ No X Describe aftematives considered and mitigation proposed.
c. Create or fail to address any other related public health or safety concerns? Yes — No X
Describe.
To the best of my knowledge and belief, the statements end data in this ap 'cation are true and correct.
i nature, Chief Ele O cial
Name (typed or printed)
Date
Please submit one original and three copies to
Sue Schneider
Department of Local Affairs
222 South Sixth Street #409
Grand Junction, Colorado 81501
Also submit:
► 1 copy to the local Council of Governments or Regional Planning Commission
No 1 copy to the local county impact (prioritization) team
Attachments List (check and submit if applicable; one set per application):
► Preliminary Engineering Reports
► Architectural Drawings
► Cost Estimates
► Map showing location of the project
► Scope of Work
Page 5 of 5 Pages
Preliminary Cost Estimates
Exterior Accessible Routes
$ 2,000
Drinking Fountains
8,000
Ramps
10,000
Stairs
22,000
Entrances and Exits
71,000
Doors and Gates
42,000
Elevators
275,000
Toilet Rooms and Bathrooms
52,000
Signage
3,000
Alarms
60,000
Detectable Warnings
1,000
Basement Fire Sprinkler
75,000
Contingency at 15%
93,150
Total $714,150
Architect/Engineering 71,415