Loading...
HomeMy WebLinkAbout10203RESOLUTION NO. 10203 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $342,463.00 TO TOTAL TERRAIN, INC., AND SETTING FORTH $34,246.30 FOR CONTINGENCIES, FOR THE FY 2004 FAIRMOUNT PARK ENHANCEMENT PROJECT — BID NO. 04 -062 AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, proposals for the FY 2004 Fairmount Park Enhancement Project — Bid No. 04- 062 have been received and examined, and; WHEREAS, the proposal of Total Terrain, Inc., of Pueblo, Colorado was the lowest of those bids determined to be responsible. BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A contract for the FY 2004 Fairmount Park Enhancement Project — Bid No. 04 -062 is hereby awarded to Total Terrain, Inc. in the amount of $342,463.00. .qFr.T101\1 9 The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. In addition to the amount of the bid set forth, as aforementioned, funds in the amount of $34,246.30 is hereby established for contingencies and additional work. .qF('TIr)N d Funds for said project shall be from Capital Project Account Number PL0302. INTRODUCED Auaust 23. 2004 a r Background Paper for Proposed RESOLUTION AGENDA ITEM 9 DATE: AUGUST 23, 2004 DEPARTMENT: COMMUNITY DEVELOPMENTMIM MUNCH PLANNING DEPARTMENTMIM MUNCH TITLE A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $342,463.00 TO TOTAL TERRAIN, INC., AND SETTING FORTH $34,246.30 FOR CONTINGENCIES, FOR THE FY 2004 FAIRMOUNT PARK ENHANCEMENT PROJECT — BID NO. 04 -062 AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME Should the City Council award a construction contract in the amount of $342,463.00 to Total Terrain, Inc., for the FY 2004 Fairmount Park Enhancement Project, Bid No. 04- 062? RECOMMENDATION Approval of this Resolution. BACKGROUND The Base Bid for the Fairmount Park Enhancement Project consists of installing a new irrigation system, 26 diameter pavilion shelter, concrete walkways, trees, a new lawn, as well as an underground drainage system in the southwest comer of the park (see attached location map). In addition to the base bid the following five (5) alternatives were included as part of the bid and could be awarded subject to the funding available for the project: Item Description Bid Amount No. 1 Extending the underground drain along 29"' Street and $69,151.00 connecting it with an outlet approximately four blocks to the west No. 2 Additional concrete pathway - 2,559 sf $11,387.55 No. 3 Additional concrete pathway — 3260 sf $14 No. 4 Asphalt parking lot $13,820.00 No. 5 Additional trees — 48 trees $17,315.00 The awarding of the base bid for $342,463.00 and setting aside 10% in contingency funds in the amount of $34,246.30, leaves approximately $22,300 in remaining project funds that can be used to fund alternative construction items. As part of the grant applications to the National Park Service and GOCO, the City identified the strong need to plant a large number of trees and bring the park back to its historical appearance. Staff has determined that in the best interest of the project the base bid, plus Alternate No. 5 (an additional 48 trees) in the amount of $17, 315.00 should be funded per this resolution (see attached "Final Bid Summary"). The underground drainage system that is part of the park renovation project is included to solve the ground water problems that have caused the degeneration of the grass areas and the loss of a significant number of trees within the park. The drainage system is designed to connect into a future stormwater pipe along 29"' Street. A future stormwater project along 29 Street is identified in the Stormwater Capital Improvement Plan to be completed within an 8-10 year timeframe. Bid Alternate No. 1 was included in the project to extend a 6" temporary underground pipe along 29 Street to an outlet four blocks west of the park. The temporary pipe included within the bid for a cost of $69,151.00 would keep the water collected in the underground drainage system in the park from emptying into the gutter along 2e Street. The project budget does not have sufficient funds to pay for the extension of the pipe and also complete the park improvements that were included within the grant agreements with the National Park Service and GOCO. The temporary pipe was not identified in the scope of work for either grant and is likely to be considered an off -site expense that does not qualify for use of the grant funds. As a result of this the ground water from the park will empty into the gutter along 29 Street until the permanent stormwater system is installed. The new drain system within the park will concentrate the amount of water flowing from the park and empty the water into the gutter along 2e Street west of Franklin Avenue. Currently the ground water from the park empties into the gutter at the intersection of 29"' Street and Franklin Avenue. FINANCIAL IMPACT Funds for this project in the amount of $376,709.30 will be paid from Account PI-0302. The funds were budgeted and appropriated in Ordinance No. 6997 approved by City Council on June 9, 2003. The funding sources for the project include: National Park Service Funds $204,000.00 GOCO Grant Funds $100,709.30 (note: $24,290.70 of GOCO grant used at Morton Elementary School & electrical work not included in this contract) Conservation Trust Funds $ 72.000.00 Total $376,709.30 NOT TO SCALE PROJECT LOCATION