Loading...
HomeMy WebLinkAbout10105RESOLUTION NO. 10105 A RESOLUTION RATIFYING AND APPROVING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $85,470.76 TO PARKER EXCAVATING, INC., AND SETTING FORTH $5,000.00 FOR CONTINGENCIES, FOR THE 12 STREET AND OGDEN EMERGENCY STORM SEWER REPAIR PROJECT AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, proposals for the 12 STREET AND OGDEN EMERGENCY STORM SEWER REPAIR PROJECT have been received and examined, and; WHEREAS, the proposal of PARKER EXCAVATING, INC., of Pueblo, Colorado was the lowest of those bids determined to be responsible; BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A contract for the 12 STREET AND OGDEN EMERGENCY STORM SEWER REPAIR PROJECT be, and the same is hereby ratified and approved to said bidder in the amount of $85,470.76. SECTION 2. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work .....$5,000.00 SECTION 4. Funds for said project shall be from SW0403. INTRODUCED Aoril26.2004 ALo. �4 10(09 M 0 EN E ONE! i "- Background Paper for Proposed RESOLUTION AGENDA ITEM # IO DATE: April 26, 2004 DEPARTMENT: STORMWATER UTILITY, Dennis Maroney, P.E. TITLE A RESOLUTION RATIFYING AND APPROVING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $85 TO PARKER EXCAVATING, INC. AND SETTING FORTH $5,000.00 FOR CONTINGENCIES FOR THE 12 STREET AND OGDEN EMERGENCY STORM SEWER REPAIR AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME. ISM Should City Council ratify and approve a construction contract for 12 STREET AND OGDEN EMERGENCY STORM SEWER REPAIR to PARKER EXCAVATING, INC., for $85,470.76. RECOMMENDATION Approval of this Resolution. BACKGROUND In accordance with City Ordinance Sec 1 -10 -5, the City Manager was notified of needed emergency storm sewer repairs at the intersection of I P Street and Ogden and emergency authorization was given. This project consists of the construction of 2 new 18" pipe installations, a 30" stormwater main extension, new manhole construction, filling and stabilization of cavities under street areas, and repair to the 72" brick main located at IP Street and Ogden intersection. Field inspections of the I P Street storm sewer found large open cavities created by the failure of existing storm drains connecting to 72" brick trunk line at the intersection of 12 Street and Ogden. These unsafe conditions mandated the closure of I Street and Ogden intersection, plugging of all storm drain inlets tied to the collection system and immediate implementation of emerging design procedures and construction measures. Parker Excavating, Inc. was awarded the contract and construction was initiated April 8, 2004. The project will be completed within 30 days. The intersection will then be open to traffic and bus routes will be reestablished on 12 Street. FINANCIAL II"ACT Funding for this project will come from capital improvement funds for E. 12� Storm Sewer Construction SW0403. Attached is a bid summary showing the results of competitive bids on this project. Stormwater System Emergency Repair 12th Street & Ogden Avenue Modify Existing Inlet (typ.) 1) Repair & Replace Concrete Lid 2) Apply Thinset Non Sbrink Grout To Inside Walls 3) Plug Existing Outlet Pipe 4) Construct New Invert Exe MH # 2 5) Paint Face Angle & Support Rods Remove & Replace Feast 7.s Below crude rnv. m (N) 64 lay. in (w) -6ess rev. m (e) -6455 FL Inlet revar (s) -63 1uv. out -66.16 30, Plug &Abandon Ext. Inlet Run (Flowfill) — — — — — — 16" Ductile HP Water —,�' �— — — — — Fill Existing Cavity With Concrete & Plowable Fill i -- W 12th Street Estimated 6 e.y-+ Flowaab Concre Fill 72" Storm �Ext. Gas Main Plug & Brace 72" Mam At Inlet Run NOTE: — Pothole water Tine prior to Storm Sewer & MH installation N ST x 5 ST L- MH #1 BM = 72.14 Modify Existing Inlet ®R FL Inlet Inv. Out -67.25 r =Plug &Abandon (Flowfill, See Detail For New Mrr 1u .xu(N) -6357 O I t Q" N.T.S. Fill Existing Cavity With Concrete & Plowable Fill Estimated 30 c.y. L Concrete Estimated 32 c.y.f Flowable Fill Plug & Brace 72" Brick Main At Existing Opening STORMWATERUTI M G1S 10 211 E. "D" Street Pueblo, Colorado 61003 (719) 553 -2299 Fax (719) 553 -2294 DATE: 03/26/04 REV. DATE: DRAWN BY: smd CHECKED BY: dw