HomeMy WebLinkAbout09607RESOLUTION NO. 9607
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE
AMOUNT OF $156,372.62 TO SHISLER CONCRETE, INC., AND
SETTING FORTH $24,000.00 FOR CONTINGENCIES, FOR THE FY 2002
EASTSIDE SIDEWALK & HANDICAP RAMPS (CDBG) PROJECT AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
WHEREAS, proposals for the FY 2002 Eastside Sidewalk & Handicap Ramps (CDBG)
Project have been received and examined, and;
WHEREAS, the proposal of Shisler Concrete, Inc., of Pueblo, Colorado was the lowest
of those bids determined to be responsible;
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
A contract for the FY 2002 Eastside Sidewalk & Handicap Ramps (CDBG) Project be,
and the same is hereby awarded to said bidder in the amount of $156,372.62.
SECTION 2.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 3.
In addition to the amount of the bid set forth, as aforementioned, an additional amount
as stipulated in this section is hereby established for contingencies and additional work.
Contingencies and Additional Work .....$24,000.00
SECTION 4.
Funds for said project shall be from Account Number 250 - 9540 -600.80 -50, CD 0217 and
Account Number 250 - 9540 -600.80 -50, CD 0218.
INTRODUCED: May 28, 2002
BY: Al Gurule
CO U ILPERSON
APPROVED:
PR ENT OF CITY COUNCIL
1
ATTESTED BY:
CITY CLERK
PWo
o � o
0
1�� e Q
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # 7
DATE: May 28, 2002
DEPARTMENT: PUBLIC WORKS, Tom Cvar
TITLE
18 aao
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF
$156,372.62 TO SHISLER CONCRETE, INC., AND SETTING FORTH $24,000.00 FOR
CONTINGENCIES, FOR THE FY 2002 EASTSIDE SIDEWALK & HANDICAP RAMPS (CDBG)
PROJECT AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
ISSUE
Should City Council award a construction contract for the FY 2002 EASTSIDE SIDEWALK &
HANDICAP RAMPS (CDBG) PROJECT to Shisler Concrete, Inc., for $156,372.62
RECOMMENDATION
Approval of this Resolution.
BACKGROUND
This project combines two approved CDBG projects on the east side. This project will construct
approximately 10,664 sq. ft. of missing sidewalk and install 31 new handicap curb ramps in the
City's continuing effort to comply with the Americans with Disabilities Act (ADA). The
locations of the handicap ramps and missing sidewalk to be installed are shown on the attached
vicinity maps. This project will complete the installation of sidewalks in the area except for that
portion of 8 Street which does not have curb and gutter.
FINANCIAL IMPACT
Funds for this project will be paid from Community Development Block Grant funds, Account
Number 250- 9540- 600.80 -50, CD 0217 and CD 0218.
Attached is a bid summary showing the result of competitive bids on this project.
FY 2002 EASTSIDE SIDEWALK & HANDICAP RAMPS
(ARLINGTON HEIGHTS AREA)
F 15H
• .—
- 1 �
w
J
Q
T =
RED SHADED AREAS
ARE WHERE MISSING
SIDEWALK IS
BEING INSTALLED
=-= = = E_,� 14TH = ST
w
Q
E. 13TH ST.
E. 12TH
e
II
II
II
NI
11
II
ST.
w
N Q
z
II >
ST.
E. 10TH - - - - --
r I� I
9TH ST. ___
:1
FY 2002 EASTSIDE SIDEWALK & HANDICAP RAMPS
(EASTWOOD HEIGHTS AREA)
E 7TH ST
RED SHADED AREAS
ARE WHERE MISSING
SIDEWALK IS
BEING INSTALLED
JBID SUMMARY BIDDERS
BID NO. 02 -043 Byerly & Shisler Goldstar
Cosyleon Concrete Construction
DATE: 4/23/02 TIME: 10:00 AM
COMMODITY: 2002 EASTSIDE
SIDEWALK & HANDICAP RAMPS
JITEM
QUANTITY
Arlington Hts Area Improvements
1
Remove Curb & Gutter
524
UP
9.65
4.00
4.44
(524 U.)
AMT
5056.60
2096.00
2326.56
2
Remove Concrete
932
UP
1.55
2.00
2.45
(932 s.f.)
AMT
1444.60
1864.00
2283.40
3 Remove 7" Reinf Concrete
930
UP
2.20
3.00
2.48
(930 s.f.)
AMT
2046.00
2790.00
2306.40
4 Remove Asphalt
1388
UP
1.55
2.00
1.50
(1388 s.f.)
AMT
2151.40
2776.00
2082.00
5 Const. Curb & Gutter
524
UP
16.25
15.00
19.50
(5241.f.)
AMT
8515.00
7860.00
10218.00
6 Const. 4" Concrete
17315
UP
3.00
2.40
2.42
(17315
s.f.)
AMT
51945.00
41556.00
41902.30
7 Const 6" Concrete
7518
UP
5.00
3.00
3.90
(7518 s.f.)
AMT
37590.00
22554.00
29320.20
8 Const 7" Reinf Concrete
1150
UP
4.80
3.90
4.00
(1150 s.f.)
AMT
5520.00
4485.00
4600.00
9 Const 12" Wide Asphalt
595
UP
2.90
4.00
8.48
(6" Thick) 595 s.f.
AMT
1725.50
2380.00
5045.60
10
Const 2" Thick Asphalt
122
UP
1.80
3.85
3.75
(122 s.f.)
AMT
219.60
469.70
457.50
11
Remove Tree
3
UP
300.00
250.00
248.00
AMT
900.00
750.00
744.00
12
Remove Tree
1
UP
700.00
250.00
475.00
AMT
700.00
250.00
475.00
13
Relocate Fence
302
UP
14.00
20.00
11.00
(3021.f.)
AMT
4228.00
6040.00
3322.00
14
Mobilization
1
UP
6800.00
4000.00
6550.00
AMT
6800.00
4000.00
6550.00
SUB TOTAL
AMT
128841.70
99870.70
111632.96
Eastside Heights Sidewalk & Handicap
Ramps Replacement
15
Remove Curb & Gutter
244
UP
9.65
4.00
4.44
(2441.f.)
AMT
2354.60
976.00
1083.36
16
Remove Concrete
800
UP
1.55
2.00
2.45
(800 s.f.)
AMT
1240.00
1600.00
1960.00
17
Remove 7" Reinf Concrete
248
UP
2.20
3.00
2.48
(248 s.f.)
AMT
545.60
744.00
615.04
18
Remove Asphalt
645
UP
1.55
2.00
1.50
(645 s.f.)
AMT
999.75
1290.00
967.50
19
Const. Curb & Gutter
387
UP
16.25
15.00
19.50
(3871.f.)
AMT
6288.75
5805.00
7546.50
20
Const. 4" Concrete
7368
UP
3.00
2.40
2.42
(7368 s.f.)
AMT
22104.00
17683.20
17830.56
21
Const 6" Concrete
3296
UP
5.00
3.00
3.90
(3296 s.f.)
AMT
16480.00
9888.00
12854.40
22
Const. 7" Reinf Concrete
248
UP
4.80
3.89
4.00
(248 s.f.)
AMT
1190.40
964.72
992.00
23
Const 12" Wide Asphalt
749
UP
2.90
4.00
8.48
(749 s.f.)
AMT
2172.10
2996.00
6351.52
24
Relocate Fence
424
UP
14.00
20.00
11.00
(4241.f.)
AMT
5936.00
8480.00
4664.00
25
Relocate Fence w /conc base
29
UP
58.00
25.00
25.00
(29I.f•)
AMT
1682.00
725.00
725.00
26
Remove Stump
1
UP
250.00
300.00
150.00
AMT
250.00
300.00
150.00
27
Remove Tree
4
UP
300.00
210.00
248.00
AMT
1200.00
840.00
992.00
28
Remove Tree
1
UP
700.00
210.00
475.00
AMT
700.00
210.00
475.00
29
Mobilization
1
UP
4700.00
4000.00
4700.00
AMT
4700.00
4000.00
4700.00
Sub -Total
AMT
67843.20
56501.92
61906.88
Grand Total
AMT
196684.90
156372.62
173539.84