Loading...
HomeMy WebLinkAbout09481RESOLUTION NO. 9481 A RESOLUTION APPROVING A DEVELOPMENT AGREEMENT BETWEEN THE CITY OF PUEBLO AND MIDWEST CONSTRUCTION CORP. CONCERING THE BOULEVARD PARK DEVELOPMENT BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. An Agreement dated December 5, 2001, a copy of which is attached hereto and made a part hereof, after having been approved as to form by the City Attorney, by and between Pueblo, a Municipal Corporation, and Midwest Construction Corp. is hereby approved. SECTION 2. The President of City Council is hereby authorized to execute the said Agreement on behalf of Pueblo. a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. INTRODUCED: January 14 .1 2002 BY: Robert Schilling COWqCIL PERSON APPROVED: PRE ENT OF CITY COUNCIL ATTESTED BY: C Y CLERK gvgl Background Paper for Proposed RESOLUTION AGENDA ITEM # I (C.a DATE: JANUARY 14, 2002 DEPARTMENT: PUBLIC WORKS TOM CVAR - DIRECTOR TITLE A RESOLUTION APPROVING A DEVELOPMENT AGREEMENT BETWEEN THE CITY OF PUEBLO AND MIDWEST CONSTRUCTION CORP. CONCERNING THE BOULEVARD PARK DEVELOPMENT ISSUE Should the City Council enter into a development agreement with Midwest Construction Corp. concerning the Boulevard Park Development. RECOMMENDATION Approval of this Resolution. BACKGROUND This Resolution will establish a development agreement, with addendums for phased construction and storm water detention facility maintenance, for the Boulevard Park Development. The developer, Midwest Construction Corp., is developing lots platted in the Chamberlain's Subdivision, for which there is no subdivision improvements agreement. This development agreement is patterned after the subdivision improvements agreement used for new subdivisions. The amount for the maintenance contribution in the addendum for Detention Facility Maintenance is based upon the negotiated amount for a previous subdivision and is approximately the amount necessary to subsidize annual maintenance costs of the stormwater detention facility from investment earnings. FINANCIAL IMPACT This agreement will allow the development of 409 single family lots, with associated infrastructure that will eventually be maintained by the City. The estimated cost of this future maintenance has not been established. RESO. #9481 1421809 Page: 1 of 31 ChrisC.Munoz Pueb10CtyC1k &Rec AGREE R 155.00 /23 BOULEVARD PARK DEVELOPMENT AGREEMENT THIS AGREEMENT is made on December 5 , 2001, between the CITY OF PUEBLO, a Municipal Corporation ( "City "), and Midwest Construction Corp. RECITALS ( "Developer ") WHEREAS, Developer is the owner of, and plans to develop a certain tract of land located in the City and legally described in attached Exhibit "A" ( "Subdivision "), and WHEREAS, the Developer, as a condition of approval of the issuance of building permits within the Subdivision, wishes to enter into this Boulevard Park Development Agreement as authorized by Chapter 4, Title XII of the 1971 Code of Ordinances; and WHEREAS, Developer is required by Chapter 4, Title XII of the 1971 Code of Ordinances of the City to construct and install certain public improvements generally described in attached Exhibit "B" and shown on approved construction plans and documents on file at the office of the City's Director of Public Works ( "Required Public Improvements "); and WHEREAS, by Chapter 4, Title XII of the 1971 Code of Ordinances, Developer is obligated to provide security or collateral in an amount not less than the Director of Public Works' ( "Director ") estimate for all Required Public Improvements ( "Director's Estimate ") to construct and complete the Required Public Improvements. NOW THEREFORE, in consideration of the following mutual covenants and agreements, the City and Developer agree as follows: ;Q 1. Except as may be otherwise specifically provided in paragraph 7 hereof, Developer agrees within one hundred and eighty (180) days after applying for a building permit to construct any building or structure on any building site within the Subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, to construct and install at its sole cost all of the Required Public Improvements. 2. In lieu of installing the Required Public Improvements within the time period prescribed in paragraph 1, Developer or any subsequent owner of the land or any portion thereof may deposit cash or other collateral in an amount not less than the Director's Estimate with the City Director of Finance, or with any bank or trust company licensed in the State of Colorado, subject to an escrow agreement approved by the Ci ty Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time to complete all Required Public Improvements in the Subdivision or any Phase thereof, by Developer or subsequent owner, expires. Such deposit or escrow agreement shall be referred to as the "Deposit ". 1421809 Page: 2 of 31 ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.01/23D20.0011:33G 3. In the event the Developer or any subsequent owner of the land fails to complete the Required Public Improvements in the Subdivision or any Phase thereof, or to make such Deposit, within the required time, no additional building permits shall be issued to the Developer or the subsequent owner or to any other person to build or construct any building or structure in the Subdivision until such failure is remedied. In addition the City may treat the amount of such Deposit as a debt due the City from the Developer or subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) years from the date of filing such lien for record. All remedies provided for in this Agreement are cumulative and the use of one shall not prohibit the use of another. 4. Upon completion of the Required Public Improvements or upon making such Deposit, the Director shall release the property within the Subdivision, or the applicable Phase thereof, from the terms of this Agreement except the terns of paragraph 6 below which shall continue in effect. 5. As a condition of approval of this Agreement, and to meet the requirements of Chapter 4 of Title XII of the 1971 Code of Ordinances, Developer specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Building Department until the Required Public Improvements, or those improvements in any Phase necessary as determined by the Director, to totally serve specific lot(s) or block(s) within the Phase for which certificates of occupancy are sought, have been properly designed, engineered, constructed and accepted as meeting the specifications and standards of the City. The restrictions on issuing certificates of occupancy contained in this paragraph 5 and the restriction on the issuance of building permits contained in paragraph 3 shall run with the land and shall extend to and be binding upon the heirs, legal representatives, successors and assigns of Developer and may be specifically enforced by the City. 6. Until the Required Public Improvements have been installed and meet the requirements, standards, and specification of the City, its Subdivision ordinances, and any applicable Parks Department specifications, and such are specifically approved and accepted in writing by the Director, and, if appropriate, the City Director of Parks and Recreation, the maintenance, construction, and all other matters pertaining to or affecting the Required Public Improvements and rights -of -way are the sole responsibility of the Developer and any subsequent owner(s) of the land within the Subdivision. 7. The required time to complete all Required Public Improvements by Developer within any Phase of the development of this Subdivision as defined in the addendum to this Agreement shall be one hundred eighth (180) days from the date of application for the first building permit issued within such Phase. Upon completion and written approval and acceptance of the Required Public Improvements within the Subdivision or any applicable Phase, within the required time and payment of all inspection costs by Developer, the Director shall cause all obligations of the -2- 14218 @9 Page: 3 of 31 01/23/2002 11:33E ChrisC.Munoz PuebloCtyC1k &Rec AGREE R 155.00 D 0.00 Developer relating to the Required Public Improvements within the Subdivision or for any applicable Phase, to be released. If such Required Public hmprovements are not completed within the required time, the Director may cause the proceeds of all Deposits to be used to complete the same. If insufficient monies are available at the end of the required time to complete all Required Public Improvements for the entire Subdivision or for any applicable Phase, the Director shall cause the Deposit to be reduced to cash and shall deposit the same with the Director of Finance. Such cash shall be used to complete that portion of the Required Public Improvements as the Director, in his sole discretion, shall determine. Until all the Required Public Improvements within the Subdivision or for any applicable Phase thereof, are completed and approved by the Director, Developer and the land within the Subdivision or any applicable Phase thereof shall remain liable and responsible for all Required Public Improvements. 8. Developer agrees to provide the City with a current title insurance commitment prior to execution of this Agreement evidencing that fee simple title of all land in the Subdivision is totally vested in the Developer free and clear of all liens and encumbrances. If such land is not free and clear, the holder of any such lien or encumbrance shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions and restrictions. 9. The City or the purchaser of any lot(s) within the Subdivision shall have the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this Agreement or any amendment hereto. Venue for any such action shall be Pueblo County, Colorado. Such authority shall include the right to compel rescission of any sale, conveyance or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this Agreement. In the event of any litigation concerning this Agreement, the Court shall award the prevailing party its costs and expenses, including reasonable expert witness and attorneys' fees. 10. The parties agree this Agreement may be periodically amended by mutual consent provided such amendment is in writing and signed by all parties. 11. This Agreement shall extend to and be binding upon the successors and assigns of the City and upon the heirs, successors, assigns and legal representatives of Developer, and shall be recorded in the office of the County Clerk and Recorder of Pueblo County, Colorado, and shall constitute an agreement running with the land until released as described above. The parties have caused this Agreement to be executed and attested by its duly authorized and acting officer. E A TL j, Developer - By By 1421809 Page: 4 of 31 STATE OF COLORADO ) 01/23/2002 11:33E ) ss. ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 COUNTY OF PUEBLO ) The foregoing instrument was acknowledged before me o_ n , > �1 2001 by % i �f /�r���r as }� / Of /7�ji��� yJ / G��l f /!' Developer. My [SEAL s 0 S Notary Public r ' ,M 4wiaon i;.�;.;, City 1 STATE OF Mj -, -ADO ) ss. COUNTY OF PUEBLO ) CITY PUEBLO, a Municipal Corporation 13y President of City Council The foregoing instrument was acknowledged before me on January 14, 2002 Michael O cchiato ,as President of City Council, and Gina Dutcher f the City of Pueblo, Colorado. My cq ssion expires: 8-21-2003 :z f. N ary Public '4 COnA IMTO FORM: City Attorney M 1421809 Page: 5 of 31 ChrisC.Munoz Pueb10CtYC1k &Rec AGREE R 155.00 /23D20 0011:339 BOULEVARD PARK DEVELOPMENT AGREEMENT EXHIBIT "A" Blocks 6, 7; All of Block 8, including ' / 2 of vacated Sherman Avenue adjacent to Lot 40, Less portion dedicated as Perry Avenue and less portion sold to Heritage Homes, Inc., in deed recorded at Reception No. 1392070; lots 21 -40 of Block 9, including ' / 2 of vacated Grant Avenue adjacent to Lot 40, and' /2 of vacated Sherman Avenue adjacent to Lot 21, Less portion dedicated as Newport Avenue, Lots 21 -40 of Block 10, including ' / 2 of vacated Grant Avenue adjacent to Lot 21 and'' /2 of vacated 21 Street adjacent to Lots 28 through 40, Less portion dedicated to 21 Street, Blocks 16, 17, Lots 1 -40 of Block 18, Block 19, and all of the vacated alley in Block 19, Block 20 and all of the vacated alley in Block 20, Blocks 26, 27, 28, 29, 30, 36, 37, 38, 39, 40, 46, 47, 48, Lots 1 -36 of Block 49 and Block 50; All in Chamberlin's Subdivision, excepting herefrom property conveyed in Deed recorded in Book 1752 at page 289 to the Department of Highways. 1421809 Page: 6 of 31 01/23/2002 11:33; ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT SUBDIVISION NAME: Boulevard Park EXHIBIT `B" DEVELOPER: Midwest Construction Corp. PHASE: II, 27 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 9; 21- 28, Block 10; 1 -20, Block 19; and 1 - 8, Block 20. New legal descriptions: See attached Exhibit LD. A. STREETS - Candice Lane from Perry Avenue to the cul -de -sac at the west side of the detention basin, Perry Avenue from 22' Street to the south boundary of Lot 1, Block 19, and Newport Avenue from 22' Street to the south boundary of Lot 20, Block 19. 1) Pavement a) 3" asphalt on 8" base, 36' fl to fl Candice Lane Perry Avenue Newport Avenue b) 3" asphalt on 6" base, 16' wide Alley behind Blocks 9 & 10 2) Concrete a) Curb & gutter, 2,920 @ $19.50 S.Y. = 1,784 @ $19.50 S.Y. = 1,958 @ $19.50 S.Y. = 1,918 @$17.50 S.Y.= Candice Lane 1,460 @ $10.00 L.F. = Perry Avenue 772 @ $10.00 L.F. = Newport Avenue 859 @ $10.00 L.F. = b) 4" concrete walks are included with home construction Detention Facility 1,344 @ $2.50 S.F. = c) Handicap ramps ramps are included with home construction d) 7" concrete 240 @ $3.80 S.F. = 3) Sanitary Sewer a) 8" main Candice Lane Perry Avenue Newport Avenue b) 48" diameter manholes Candice Lane c) Service lines, 60' ROW Candice Lane Newport Avenue 794 @ $32,00 L.F. = 168 @ $32.00 L.F. = 144 @ $32.00 L.F. = 4 @ $2,202.00 each = 25 @ $787.00 each = 2 @ $787.00 each = $56,940.00 34,788.00 38,181.00 33,565.00 14,600.00 7,720.00 8,590.00 0.00 3,360.00 0.00 912.00 25,408.00 5,376.00 4,608.00 19,675.00 1,574.00 Phase II, Page 1 (07/27/01) 1421809 01/23/2002 11:3W 4) Water ChrisC.Munoz PuebloCtYClk &Rec AGREE I R I 115.00 D 0.00 a) Main, including valves 1,500 @ $40.00 L.F. = 60,000.00 b) Fire hydrant assembly 4 @ $2,700.00 each = 10,800.00 c) Service lines, 60' ROW 27 @ $500.00 each = 13,500.00 5) Monument Boxes 2 @ $575.00 each = 1,150.00 6) Street Lights 4 @ $1,300 each = 5,200.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW 4 @ $300.00 each = 1,200.00 8) Barricades, L = 24' 2 @ $1,125.00 each = 2,250.00 B. DRAINAGE 1) Storm Sewer a) onsite Candice Lane, 30" 397 @ $60.00 L.F. = 23,820.00 Candice Lane, 36" 397 @ $66.00 L.F. = 26,202.00 Perry Avenue, 24" 168 @ $48.00 L.F. = 8,064.00 Basin, 36" 187 @ $66.00 L.F. = 12,342.00 18" pipe, offsite 3,000 @ $36.00 L.F. = 108,000.00 b) Manhole, 60" diameter, onsite 2 @ $2,000.00 each = 4,000.00 Manhole, 60" diameter, offsite 9 @ $2,000.00 each = 18,000.00 c) Type "S" inlet - L = 9' 2 @ $3,700.00 each = 7,400.00 2) Channel - N/A 0.00 3) Detention Facility a) Outlet structure 1 @ $3,000.00 each = 3,000.00 b) Grading 2 @ $16,000.00 per acre = 32,000.00 c) Vegetation 2.31 @ $12,000.00 per acre = 27,769.00 4) Rip Rap 28 @ $50.00 C.Y. = 1,400.00 C. PARKS - N/A 0.00 TOTAL $630,202.00 Phase H, Page 2 (07/27/01) 1421809 Page: 8 of 31 01/23/2002 11:33E ChrisC.Munoz PuebloCtvC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: III, 46 buildable R -2 Lots, consisting of platted Lots: 27 - 40, Block 26; 21 - 40, Block 27; 21 - 40, Block 28; 1 - 20, Block 37; and 21 - 40, Block 38 A. STREETS - 18" Street from Pueblo Blvd. to Perry Avenue, Perry Avenue from the north boundary of Lot 40, Block 18, to the south boundary of Lot 20, Block 38, Logan Avenue from the north boundary of Lot 21, Block 28, to the south boundary of Lot 1, Block 38, Thomas Street from the north boundary of Lot 21, Block 27, to 18" Street and Golf Glen Drive from 18' Street to the south boundary of Lot 1, Block 37. 1) Pavement a) 4" asphalt on 15" base, 44' fl to fl 18" Street 7,803 @ $28.50 S.Y. = b) 3" asphalt on 8" base, 36' fl to fl Perry Avenue 2,368 @ $19.50 S.Y. = Logan Avenue 1,024 @ $19.50 S.Y. = Thomas Avenue 512 @ $19.50 S.Y. = Golf Glen Drive 512 @ $19.50 S.Y. = 2) Concrete a) Curb & gutter 18' Street Perry Avenue Logan Avenue Thomas Avenue Golf Glen Drive b) 4" concrete c) Handicap ramps d) 7" concrete 2,832 @ $10.00 L.F. = 1,064 @ $10.00 L.F. = 512 @ $10.00 L.F. = 256 @ $10.00 L.F. = 256 @ $10.00 L.F. = walks are included with home construction ramps are included with home construction 1,440 @ $3.80 S.F. = 3) Sanitary Sewer a) 8" main, 0'- 12' depth 18t' Street Perry Avenue 1,450 @ $32.00 L.F. = 500 @ $32.00 L.F. = Phase III, Page 1 (07/27/01) $222,386.00 46,176.00 19,968.00 9,984.00 9,984.00 28,320.00 10,064.00 5,120.00 2,560.00 2,560.00 0.00 0.00 5,472.00 46,400.00 16,000.00 1421809 Page: 9 of 31 01/23/2002 11:33E ChrisC.Munoz Pueb1oCtyC1k &Reo AGREE R 155.00 D 0.00 b) 48" diameter manholes 18 1h Street 4 @ $2,202.00 each = 8,808.00 Perry Avenue 3 @ $2,202.00 each = 6,606.00 c) Service lines, 80' ROW 18` Street 46 @ $1,049.00 each = 48,254.00 4) Water a) Main, including valves 1,416 @ $40.00 L.F. = 56,640.00 b) Fire hydrant assembly 4 @ $2,700.00 each = 10,800.00 c) Service lines, 80' ROW 46 @ $650.00 each = 29,900.00 5) Monument Boxes 4 @ $575.00 each = 2,300.00 6) Street Lights 9 @ $1,300 each = 11,700.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 80' ROW 3 @ $400.00 each = 1,200.00 8) Barricades - L = 24' 5 @ $1,125.00 each = 5,625.00 B. DRAINAGE 1) Storm Sewer - N/A 0.00 2) Channel - 700 L.F. X 4' 2,800 @ $2.00 S.F. = 5,600.00 3) Detention Facility a) Outlet structure - N/A 0.00 b) Grading .4 @ $16,000 per acre = 6,400.00 c) Planting vegetation - N/A 0.00 4) Rip Rap 22 @ $50.00 S.Y. = 1,100.00 C. PARKS - N/A 0.00 TOTAL $619,927.00 Phase I11, Page 2 (07/27/01) 1421809 Page: 10 of 31 01/23/2002 11:33F ChrisC.Munoz PuebloCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT 1: : SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: IV, 52 buildable R -2 Lots, consisting of platted Lots: 8 - 20, Block 26; 28 - 40, Block 16; 1 - 20, Block 27; 21 - 40, Block 17; 21 - 40, Block 18; and 1 - 20, Block 28. A. STREETS - 19t Street from Perry Avenue to Pueblo Blvd, cul -de -sac, Thomas Avenue from the north boundary of Lot 21, Block 17, to the south boundary of Lot 1, Block 27, and Logan Avenue from the north boundary of Lot 40, Block 17, to the south boundary of Lot 20, Block 27. Vacation and dedication of areas at the west end of 19" Street will be done according to local ordinances in order to build cul -de -sacs. 1) Pavement a) 3" asphalt on 8" base, 36' fl to fl 19' Street Thomas Avenue Logan Avenue 2) Concrete a) Curb & gutter, 19 Street Thomas Avenue Logan Avenue b) 4" concrete c) Handicap ramps d) 7" concrete e) Square pan radius 5,780 @ $19.50 S.Y. = 112,710.00 1,104 @ $19.50 S.Y. = 21,528.00 1,104 @ $19.50 S.Y. = 21,528.00 2,890 @ $10.00 L.F. _ 552 @ $10.00 L.F. _ 552 @ $10.00 L.F. _ walks are included with home construction ramps are included with home construction 1,155 @ $3.80 S.F. _ 350 @ $4.25 S.F. _ 3) Sanitary Sewer a) 8" main, 0'- 12' depth, 19t Street b) 48" diameter manholes c) Service lines, 60' ROW 4) Water a) Main, including valves 19t Street b) Fire hydrant assembly 1,445 @ $32.00 = 3 @ $2,202.00 each = 52 @ $787.00 each = 1,445 @ $40.00 L.F. _ 3 @ $2,700.00 each = Phase IV, Page 1 (07/27/01) 28,900.00 5,520.00 5,520.00 0.00 0.00 4,3 89.00 1,487.50 46,240.00 6,606.00 40,924.00 57,800.00 8,100.00 1421809 Page: 11 of 31 01/23/2002 11:33F ChrisC.Muncz PuebloCtyCI Mec AGREE R 155.00 D 0.00 c) Service lines, 60' ROW 52 @ $500.00 each = 26,000.00 d) High pressure water line 22n Street to 18"' Street 1,000 @ $45.00 L.F. = 45,000.00 Assumes water line built from 24` Street to 22" Street 5) Monument Boxes 2 @ $575.00 each = 1,150.00 6) Street Lights 5 @ $1,300 each = 6,500.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW 5 @ $300.00 each = 2,250.00 b) T- intersection 1 @ $200.00 each = 200.00 8) Barricades 2 @ $1,125.00 each = 1,125.00 B. DRAINAGE 1) Storm Sewer a) 18" pipe, 19` Street 200 @ $36.00 L.F. = 7,200.00 b) 24" pipe, 19` Street 50 @ $44.00 L.F. = 2,200.00 24" pipe, Perry Avenue 325 @ $44.00 L.F. = 14,300.00 c) Manhole, 60" diameter 2 @ $2,000.00 each = 4,000.00 d) Type "S" inlet - L = 9' 2 @ $3,700.00 each = 7,400.00 2) Channel - N/A 0.00 3) Detention Facility - N/A 0.00 4) Rip Rap - N/A 0.00 C. PARKS - N/A 0.00 TOTAL $478,952.50 Phase IV, Page 2 (07/27/01) 1421809 Page: 12 of 31 01/23/2002 11:33; ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT 101 SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: V, 52 buildable R -2 Lots, consisting of platted Lots: 27 -40, Block 6; 8 - 20, Block 16; 21 - 40, Block 7; 1 - 20, Block 17; 21 - 40, Block 8; and 1 - 20, Block 18. A. STREETS - Candice Lane from Perry Avenue to Pueblo Blvd. cul -de -sac, Thomas Avenue from the north boundary of Lot 21, Block 7, to the south boundary Lot 1, Block 17, and Logan Avenue from the north boundary of Lot 40, Block 7, to the south boundary of Lot 20, Block 17. Vacation and dedication of areas at the west end of Candice Lane will be done according to local ordinances in order to build cul -de -sacs. 1) Pavement a) 3" asphalt on 8" base, 36' fl to fl Candice Lane 5,780 @ $19.50 S.Y. = Thomas Avenue 1,072 @ $19.50 S.Y. = Logan Avenue 1,072 @ $19.50 S.Y. = 2) Concrete a) Curb & gutter, Candice Lane Thomas Avenue Logan Avenue b) 4" concrete c) Handicap ramps d) 7" concrete e) Square pan radius 3) Sanitary Sewer a) 8" main, 0'- 12' depth, Candice Lane b) 48" diameter manholes c) Service lines, 60' ROW 2,890 @ $10.00 L.F. = 536 @ $10.00 L.F. = 536 @ $10.00 L.F. = walks are included with home construction ramps are included with home construction 1,155 @ $3.80 S.F. = 350 @ $4.25 S.F. = 4) Water a) Main, including valves 19' Street b) Fire hydrant assembly 1,445 @ $32.00 = 3 @ $2,202.00 each = 52 @ $787.00 each = 1,445 @ $40.00 L.F. = 3 @ $2,700.00 each = Phase V, Page 1 (07/27/01) 112,710.00 20,904.00 20,904.00 28,900.00 5,360.00 5,360.00 0.00 0.00 4,389.00 1,487.50 46,240.00 6,606.00 40,924.00 57,800.00 8,100.00 B. DRAINAGE 1) Storm Sewer a) 18" pipe, Candice Lane b) 24" pipe, Candice Lane c) Manhole, 60" diameter d) Type "S" inlet - L = 9' 2) Channel - N/A 3) Detention Facility - N/A 4) Rip Rap - N/A C. PARKS - N/A 200 @ $36.00 L.F. = 7,200.00 50 @ $48.00 L.F. = 2,400.00 2 @ $2,000.00 each = 4,000.00 2 @ $3,700.00 each = 7,400.00 0.00 0.00 0.00 0.00 TOTAL $418,284.50 Phase V, Page 2 (07/27/01) 1421809 Page: 13 of 31 01/23/2002 11:33E ChrisC.Munoz Pueb1oCtyC1k &Reo AGREE R 155.00 D 0.00 c) Service lines, 60' ROW 52 @ $500.00 each = 26,000.00 5) Monument Boxes 2 @ $575.00 each = 2,875.00 6) Street Lights 5 @ $1,300 each = 19,500.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW 5 @ $300.00 each = 1,500.00 b) T- intersection 1 @ $200.00 each = 200.00 8) Barricades 2 @ $1,125.00 each = 1,125.00 B. DRAINAGE 1) Storm Sewer a) 18" pipe, Candice Lane b) 24" pipe, Candice Lane c) Manhole, 60" diameter d) Type "S" inlet - L = 9' 2) Channel - N/A 3) Detention Facility - N/A 4) Rip Rap - N/A C. PARKS - N/A 200 @ $36.00 L.F. = 7,200.00 50 @ $48.00 L.F. = 2,400.00 2 @ $2,000.00 each = 4,000.00 2 @ $3,700.00 each = 7,400.00 0.00 0.00 0.00 0.00 TOTAL $418,284.50 Phase V, Page 2 (07/27/01) 1421809 Page: 14 of 31 01/23/2002 11:33F ChrisC.Munoz Pueb10CtyC1k&Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT 1 4 - M IN SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: VI, 41 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 19; 21 - 40, Block 20; 1 - 20, Block 29; 1 - 20, Block 30; and 19 & 20, Block 10. A. STREETS - 19` Street from Perry Avenue to Spaulding Avenue, Spaulding Avenue from 22 " Street to south end of Lot 20, Block 30, and Newport Avenue from the north boundary of Lot 21, Block 20, to the south boundary of Lot 1, Block 30_ 1) Pavement a) 3" asphalt on 8" base, 36' fl to fl 19 Street 3,667 @ $19.50 S.Y. _ Newport Avenue 1,232 @ $19.50 S.Y. _ b) 3" asphalt on 16" base, 44' fl to fl Spaulding Avenue 3,940 @ $27.50 S.Y. _ 2) Concrete a) Curb & gutter 19` Street Newport Avenue Spaulding Avenue b) 4" concrete c) Handicap ramps d) 7" concrete - N/A 3) Sanitary Sewer a) 8" main (0'- 12' depth) 19` Street Newport Avenue b) 48" diameter manholes c) Service lines, 60' ROW 4) Water a) Main, including valves b) Fire hydrant assembly c) Service lines, 60' ROW 2,120 @ $10.00 L.F. _ 552 @ $10.00 L.F. _ 1,616 @ $10.00 L.F. _ walks are included with home construction ramps are included with home construction 1,050 @ $32.00 L.F. _ 163 @ $32.00 L.F. _ 4 @ $2,202.00 each = 40 @ $787.00 each = 2,000 @ $40.00 L.F. _ 4 @ $2,700.00 each = 40 @ $500.00 each = Phase VI, Page 1 (07/27/01) 71,500.00 24,024.00 108.362.00 21,200.00 5,520.00 16,160.00 0.00 0.00 0.00 33,600.00 5,216.00 8,808.00 31,480.00 80,000.00 10,800.00 20,000.00 1421809 Page: 15 of 31 01/23/2002 11:33F ChrisC.Munoz PuebloCtyC1k &Rec AGREE R 155.00 D 0.00 5) Monument Boxes z L each = 1,150.00 6) Street Lights 4 @ $1,300 each = 5,200.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW 3 @ $300.00 each = 900.00 8) Barricades, L = 24' 3 @ $1, 125.00 each = 3,375.00 B. DRAINAGE 1) Storm Sewer a) 18" pipe, 19 Street 200 @ $36.00 L.F. = 7,200.00 b) 24" pipe, 19 Street 150 @ $48.00 L.F. = 7,200.00 c) Manhole, 60" diameter 3 @ $2,000.00 each = 6,000.00 d) Type "S" inlet - L = 9' 2 @ $3,700.00 each = 7,400.00 2) Channel - N/A 0.00 3) Detention Facility - N/A 0.00 4) Rip Rap - N/A 0.00 C. PARKS - N/A 0.00 TOTAL $475,095.00 Phase VI, Page 2 (07/27/01) 1421809 Page: 16 of 31 01/23/2002 11:33F ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT 10. SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: VII, 40 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 29; 21 - 40, Block 30; 1 - 20, Block 39; and 1 - 20, Block 40. A. STREETS - 18t Street (A) from Perry Avenue to Spaulding Avenue, 18t Street (B) from Spaulding Avenue to the east side of Hyde Park School, Newport Avenue from the north boundary of Lot 40, Block 29, to the south boundary of Lot 20, Block 39, and Spaulding Avenue from 18' Street to south boundary of Lot 20, Block 40. 1) Pavement a) 4" asphalt on 15" base, 44' fl to fl 18` Street (A) 5,476 @ $28.50 S.Y. = $156,066.00 18t Street (B) 6,752 @ $28.50 S.Y. = 192,432.00 b) 3" asphalt on 16" base, 44' fl to fl Spaulding Avenue 1,252 @ $27.50 S.Y. = 34,418.00 c) 3" asphalt on 8" base, 36 fl to fl Newport Avenue 1,024 @ $19.50 S.Y. = 19,968.00 Perry Avenue 512 @ $19.50 S.Y. = 9,984.00 2) Concrete a) Curb & gutter 18t Street (A) 18" Street (B) Spaulding Avenue Newport Avenue Perry Avenue b) 4" concrete c) Handicap ramps d) 7" concrete - N/A 2,240 @ $10.00 L.F. = 2,762 @ $10.00 L.F. = 512 @ $10.00 L.F. = 512 @ $10.00 L.F. = 256 @ $10.00 L.F. = walks are included with home construction ramps are included with home construction 3) Sanitary Sewer a) 8" main, 0'- 12' depth 18t' Street (A) 18t Street (B) Spaulding Avenue Newport Avenue 1,050 @ $32.00 L.F. = 1,381 @ $32.00 L.F. = 175 @ $32.00 L.F. = 325 @ $32.00 L.F. = Phase VII, Page 1 (07/27/01) 22,400.00 27,620.00 5,120.00 5,120.00 2,560.00 0.00 0.00 0.00 33,600.00 44,192.00 1,750.00 3,250.00 4) Water a) Main, including valves 1,100 @ $40.00 L.F. = 1421809 18' Street (A) 1,120 @ $40.00 L.F. = Page: 17 of 31 18" Street (B) 1,381 @ $40.00 L.F. = 01/23/2002 11:33; b) 48" diameter manholt ChrisC.Munoz PuebloCtyC1k &Rec AGREE R 155.00 D 0.00 18" Street (A) 3 @ $2,202.00 each = 6,606.00 18' Street (B) 4 @ $2,202.00 each = 8,808.00 c) Service lines, 80' ROW c) Service lines, 80' ROW, 18t Street (A) 40 @ $1,049.00 each = 41,960.00 18t Street (B) 17 @ $1,049.00 each = 17,833.00 4) Water a) Main, including valves 1,100 @ $40.00 L.F. = 44,000.00 18' Street (A) 1,120 @ $40.00 L.F. = 44,800.00 18" Street (B) 1,381 @ $40.00 L.F. = 55,240.00 b) Fire hydrant assembly 18" Street (A) 2 @ $2,700.00 each = 5,400.00 18" Street (B) 3 @ $2,700.00 each = 8,100.00 c) Service lines, 80' ROW, 18t' Street (A) 40 @ $650.00 each = 26,000.00 18" Street (B) 17 @ $650.00 each = 11,050.00 5) Monument Boxes - N/A 6 @ $575.00 each = 3,450.00 6) Street Lights 11 @ $1,300 each = 14,300.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 80' ROW 5 @ $400.00 each = 2,000.00 8) Barricades, L = 24' 1 @ $1,125.00 each = 1,125.00 B. DRAINAGE 1) Storm Sewer a) 18" pipe 18 Street (A) 200 @ $36.00 L.F. = 7,200.00 b) 24" pipe 18" Street (A) 25 @ $48.00 L.F. = 1,200.00 c) 30" pipe Spaulding Avenue 175 @ $60.00 L.F. = 10,500.00 2) Channel - N/A 0.00 3) Detention Facility - N/A 0.00 4) Rip Rap - N/A 0.00 C. PARKS - N/A 0.00 TOTAL $868,052.00 Phase VII, Page 2 (07/27/01) 1421809 Page: IS of 31 01/23/2002 11:33F ChrisC.Munoz Pueb1oCtvC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT IM 01015 C SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: VIII, 40 buildable R -2 Lots consisting of platted Lots: 21 - 40, Block 39; 21 - 40, Block 40; and 1 - 20, Block 50. A. STREETS - 17` Street from Perry Avenue to Spaulding Avenue, Spaulding Avenue from the north boundary of Lot 40, Block 40, to the south boundary of Lot 20, Block 50, Perry Avenue from the north boundary of Lot 21, Block 39, to the south boundary of Lot 1, Block 49, and Newport Avenue from the north boundary of Lot 21, Block 40, to the south boundary of Lot 1, Block 50. 1) Pavement a) 3" asphalt on 8" base, 36' fl to fl 17 Street 4,240 @ $19.50 S.Y. _ Perry Avenue 1,072 @ $19.50 S.Y. _ Newport Avenue 1,072 @ $19.50 S.Y. _ b) 3" asphalt on 16" base, 44' fl to fl Spaulding Avenue 1,344 @ $19.50 S.Y. _ 2) Concrete a) Curb & gutter, I r Street Perry Avenue Newport Avenue Spaulding Avenue b) 4" concrete c) Handicap ramps d) 7" concrete e) Square pan radius 2,000 @ $10.00 L.F. _ 536 @ $10.00 L.F. _ 536 @ $10.00 L.F. _ 536 @ $10.00 L.F. _ walks are included with home construction ramps are included with home construction 216 @ $3.80 S.F. _ 800 @ $4.25 S.F. _ 3) Sanitary Sewer a) 8" main, 0'- 12' depth, 17"' Street Perry Avenue Newport Avenue Spaulding Avenue 1,100 @ $32.00 L.F. _ 150 @ $32.00 L.F. _ 350 @ $32.00 L.F. _ 350 @ $32.00 L.F. _ Phase VIII, Page 1 (07/27/01) $82,680.00 20,904.00 20,904.00 45,173.00 20,000.00 5,360.00 5,360.00 5,360.00 0.00 0.00 820.80 3,400.00 35,200.00 4,800.00 11,200.00 11,200.00 b) 48" diameter manholes c) Service lines, 60' ROW 4) Water a) Main, including valves b) Fire hydrant assembly c) Service lines, 60' ROW 1,400 @ $40.00 L.F. = 56,000.00 2 @ $2,700.00 each = 8,100.00 40 @ $500.00 each = 20,000.00 1421809 Page: 19 of 31 01/23/2002 11:339 ChrisC.Munoz PuebloCtvClk &Rec AGREE R 155.00 D 0.00 3 @ $2,202.00 each = 6,606.00 40 @ $787.00 each = 31,480.00 1,400 @ $40.00 L.F. = 56,000.00 2 @ $2,700.00 each = 8,100.00 40 @ $500.00 each = 20,000.00 5) Monument Boxes 6) Street Lights 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW 8) Barricades - L = 24' B. DRAINAGE 1) Storm Sewer - N/A 2) Channel - N/A 3) Detention Facility - N/A 4) Rip Rap - N /A. C. PARKS - N/A 1 @ $575.00 each = 1,725.00 4 @ $1,300.00 each = 6,500.00 3 @ $300.00 each = 900.00 2 @ $1,125.00 2,250.00 0.00 0.00 0.00 0.00 0.00 TOTAL $405,922.80 Phase VIII, Page 2, (07/27/01) 1421809 Page: 20 of 31 01/23/2002 11:330 ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT 1: C SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: IX, 29 buildable R -2 Lots consisting of platted Lots: 21 - 40, Block 37; 21 - 40, Block 38; and 1 - 20, Block 48. A. STREETS - 17 Street from Perry Avenue to Golf Glen Drive, Logan Avenue from the north boundary of Lot 21, Block 38, to the south boundary of Lot 1, Block 48, and Golf Glen Drive from the north boundary of Lot 21, Block 37, to the south edge of I r Street. Phase IX will be resubdivided to accommodate street realignments at Golf Glen Drive and I r Street. 1) Pavement a) 3" asphalt on 8" base, it Street 4,172 @ $19.50 S.Y. = 81,354.00 Logan Avenue 1,072 @ $19.50 S.Y. = 20,904.00 Golf Glenn Drive 1,192 @ $19.50 S.Y. = 23,244.00 2) Concrete a) Curb & gutter, it Street 2,086 @ $10.00 L.F. = 10,869.00 Logan Avenue 536 @ $10.00 L.F. = 5,360.00 Golf Glenn Drive 596 @ $10.00 L.F. = 5,960.00 b) 4" concrete walks are included with home construction 0.00 c) Handicap ramps ramps are included with home construction 0.00 d) 7" concrete 1,650 @ $3.80 S.F. = 6,270.00 e) Square pan radius 350 @ $4.25 S.F. = 1,487.50 3) Sanitary Sewer a) 8" main, 0'- 12' depth I r Street 550 @ $32.00 L.F. = 17,600.00 Note: Building Lots 3201 - 3233 have no sewer b) 48" diameter manholes 2 @ $2,202.00 each = 4,404.00 c) Service lines, 60' ROW 29 @ $787.00 each = 22,823.00 4) Water a) Main, including valves 1,043 @ $40.00 L.F. = 41,720.00 Phase IX, Page 1 (07/27/01) 8) Barricades - N/A 0.00 B. DRAINAGE 1) Storm Sewer - N/A 0.00 2) Channel - 1,700 L.F. X 4' 6,800 @ $2.00 S.F. = 13,600.00 3) Detention Facility a) Outlet structure - N/A 0.00 b) Grading 1 @ $16,000 per acre 16,000.00 c) Planting vegetation - N/A 0.00 4) Rip Rap 45 @ $50 S.Y. 2,250.00 C. PARKS - N/A 0.00 TOTAL $301,095.50 Phase IX, Page 2 (07/27/01) 1421809 Page: 21 of 31 01/23/2002 11:339 ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 b) Fire hydrant assembly 2 @ $2,700.00 each = 5,400.00 c) Service lines, 60' ROW 29 @ $500.00 each = 14,500.00 5) Monument Boxes 2 @ $575.00 each = 1,150.00 6) Street Lights 4 @ $1,300.00 each = 5,200.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW 2 @ $300.00 each = 600.00 b) T- intersection 2 @ $200.00 each = 400.00 8) Barricades - N/A 0.00 B. DRAINAGE 1) Storm Sewer - N/A 0.00 2) Channel - 1,700 L.F. X 4' 6,800 @ $2.00 S.F. = 13,600.00 3) Detention Facility a) Outlet structure - N/A 0.00 b) Grading 1 @ $16,000 per acre 16,000.00 c) Planting vegetation - N/A 0.00 4) Rip Rap 45 @ $50 S.Y. 2,250.00 C. PARKS - N/A 0.00 TOTAL $301,095.50 Phase IX, Page 2 (07/27/01) 1421809 Page: 22 of 31 01/23/2002 11:339 ChrisC.Munoz PuebloCtyClk &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT `B" SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: X, 56 buildable R -3 Lots, consisting of platted Lots: 21 - 40, Block 48; 21 - 36, Block 49; and 21 - 40, Block 50. A. STREETS - Golf Glenn Drive from Spaulding Avenue to 17" Street, Spaulding Avenue from the north boundary of Lot 40, Block 50, to I I th Street, Logan Avenue from the north boundary of Lot 21, Block 48, to Golf Glenn Drive, Perry Avenue from the north boundary Lot 40, Block 48, to Golf Glenn Drive and Newport Avenue from the north boundary of Lot 40, Block 49, to Golf Glen Drive. Phase X will be resubdivided to accommodate street realignments at Golf Glenn Drive and 17t Street. 1) Pavement a) 3" asphalt on 16' base, 44' fl to fl Spaulding Avenue 11,000 @ $27.50 S.Y. _ b) 3" asphalt on 8" base, 36' fl to fl Golf Glenn Drive 8,820 @ $19.50 S.Y. _ Logan Avenue 584 a, $19.50 S.Y. _ Perry Avenue 584 @ $19.50 S.Y. _ Newport Avenue 584 @ $19.50 S.Y. _ 2) Concrete a) Curb & gutter Spaulding Avenue Golf Glenn Drive Logan Avenue Perry Avenue Newport Avenue b) 4" concrete c) Handicap ramps d) 7" concrete e) Square pan radius 4,500 cr $10.00 L.F. _ 4,410 @ $10. 00 L. F. _ 292 @ $10.00 L.F. _ 292 @ $10.00 L.F. _ 292 a $10.00 L.F. _ walks are included with home construction ramps are included with home construction 1,650 @ $3.80 S.F. _ 350 t) $4.25 S.F. _ 3) Sanitary Sewer a) 8" main, 0'- 12' depth Golf Glenn Drive 1,699 (c� $32.00 L.F. _ $302,500.00 171,990.00 11,388.00 11,388.00 11,388.00 45,000.00 44,100.00 2,920.00 2,920.00 2,920.00 0.00 0.00 6,270.00 1,487.50 54,368.00 Phase X, Page 1 (07/'27/01) Perry Avenue 181 @ $32.00 L.F. = 5,792.00 Newport Avenue Spaulding Avenue b) 48" diameter manholes Golf Glenn Drive c) Service lines, 60' ROW 4) Water a) Main, including valves Golf Glenn Drive b) Fire hydrant assembly c) Service lines, 60' ROW 5) Monument Boxes 6) Street Lights 1,675 @ $40.00 L.F. = 67,000.00 4 d $2,700.00 each = 10,800.00 116 @ $500.00 each = 58,000.00 4 @ $575.00 each = 2,300.00 7 @ $1,300.00 each = 9,100.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW b) T- intersection 8) Barricades - N/A B. DRAINAGE 1) Storm Sewer - N/A 2) Channel - 1,700 L.F. X 4' 3) Detention Facility a) Outlet structure - N/A b) Grading c) Planting vegetation - N/A 4) Rip Rap C. PARKS - N/A 3 ct $300.00 each= 900.00 2 (i:� $200.00 each = 400.00 1 it Kim 6,800 d $2.00 S.F. = 13,600.00 0.00 I @ $16,000 per acre 16,000.00 0.00 45 @ $50 S.Y. 2,250.00 0.00 TOTAL $913,667.50 Phase X, Page 2 (07/27!01) 1421809 Page: 23 of 31 01/23/2002 11:33F ChrisC.Munoz Pueb1oCtvC1k &Rec AGREE R 155.00 0 0.00 181 @ $32.00 L.F. = 5,792.00 181 cc, $32.00 L.F. = 5,792.00 5 @ $2,202.00 each = 11,010.00 116 @ $787.00 each= 91,292.00 1,675 @ $40.00 L.F. = 67,000.00 4 d $2,700.00 each = 10,800.00 116 @ $500.00 each = 58,000.00 4 @ $575.00 each = 2,300.00 7 @ $1,300.00 each = 9,100.00 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW b) T- intersection 8) Barricades - N/A B. DRAINAGE 1) Storm Sewer - N/A 2) Channel - 1,700 L.F. X 4' 3) Detention Facility a) Outlet structure - N/A b) Grading c) Planting vegetation - N/A 4) Rip Rap C. PARKS - N/A 3 ct $300.00 each= 900.00 2 (i:� $200.00 each = 400.00 1 it Kim 6,800 d $2.00 S.F. = 13,600.00 0.00 I @ $16,000 per acre 16,000.00 0.00 45 @ $50 S.Y. 2,250.00 0.00 TOTAL $913,667.50 Phase X, Page 2 (07/27!01) 1421809 Page: 24 of 31 01/23/2002 11:33F ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASE: XI, 24 R -4 Lots, consisting of platted Lots: 7 - 20, Block 6; 1 - 20, Block 7; and I - 18, Block 8. A. STREETS - 22n Street from Perry Avenue to Pueblo Blvd. cul -de -sac, Thomas Avenue from 22n Street to south boundary of Lot 1, Block 7, plus alley, and Logan Avenue from 22' Street to south boundary of Lot 20, Block 7, plus alley. Vacation and dedication of areas at the west end of 22 " Street will be done according to local ordinances in order to build cul -de -sacs. 1) Pavement a) 3" asphalt on 8" base, 44' fl to fl 22 " Street b) 3" asphalt on 8" base, 36' fl to fl Thomas Street Logan Street c) 3" asphalt on 6" base, 16' wide Alley behind Blocks 6, 7 & 8 2) Concrete a) Curb & gutter 22n Street Thomas Avenue Logan Avenue b) 4" concrete c) Handicap ramps d) 7" concrete e) Square pan radius 6,395 @ $19.50 S.Y. _ 544 @ $19.50 S.Y. _ 544 @ $19.50 S.Y. _ 2,325 @ $17.50 S.Y. _ 2,616 @ $10.00 L.F. _ 240 @ $10.00 L.F. _ 240 @ $10.00 L.F. _ walks are included with home construction ramps are included with home construction 1,155 @ $3.80 S.F. _ 350 @ $4.25 S.F. _ 3) Sanitary Sewer a) 8" main, 0'- 12' depth 22n Street b) 48" diameter manholes c) Service lines, 60' ROW 4) Water a) Main, including valves 1,308 @ $32.00 L.F. _ 4 @ $2,202.00 each = 24 @ $787.00 each = 1,308 @ $40.00 L.F. _ Phase XI, Page 1 (07/27/01) $124,696.00 10,608.00 10,608.00 26,160.00 2,400.00 2,400.00 0.00 0.00 4,389.00 1,487.50 41,856.00 8,808.00 18,888.00 52,320.00 b) Fire hydrant assembly C) Service lines, 60' ROW d) High pressure waterline 24 Street to 22` Street 5) Monument Boxes 1,750 @ $45.00 L.F. _ 6) Street Lights 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW b) T- intersection 8) Barricades B. DRAINAGE - N/A 1) Storm Sewer - N/A 2) Channel - N/A 3) Detention Facility - N/A 4) Rip Rap - N/A C. PARKS - N/A 2 @ $575.00 each = 5 @ $1,300 each = 5 @ $300.00 each = 1 @ $200.00 each = 1 @ $1,125.00 each = TOTAL 78,750.00 1,150.00 6,500.00 1,500.00 200.00 1,125.00 0.00 0.00 0.00 0.00 0.00 $373,183.50 The above estimates for Phases H - XI were established per improvement plans and master studies. Such quantities should be reviewed upon the submittal of improvement plans on a phase by phase basis. -�% Date: July 27, 2001 repa ale Tittlemier, President Midwest Construction Corp. l VI 7e Reviewed ��z : . ` L Date: ,z/ i z City of Pueblo J Phase XI, Page 2 (07/27/01) 1421809 Page: 25 of 31 01/23/2002 11:339 ChrisC.Munoz Pueb1oCtvC1k &Rec AGREE R 155.00 D 0.00 2 @ $2,700.00 each = 5,400.00 24 @ $500.00 each = 12,000.00 1,750 @ $45.00 L.F. _ 6) Street Lights 7) Street Name Signs & Stop Signs a) 4 -way intersection, 60' ROW b) T- intersection 8) Barricades B. DRAINAGE - N/A 1) Storm Sewer - N/A 2) Channel - N/A 3) Detention Facility - N/A 4) Rip Rap - N/A C. PARKS - N/A 2 @ $575.00 each = 5 @ $1,300 each = 5 @ $300.00 each = 1 @ $200.00 each = 1 @ $1,125.00 each = TOTAL 78,750.00 1,150.00 6,500.00 1,500.00 200.00 1,125.00 0.00 0.00 0.00 0.00 0.00 $373,183.50 The above estimates for Phases H - XI were established per improvement plans and master studies. Such quantities should be reviewed upon the submittal of improvement plans on a phase by phase basis. -�% Date: July 27, 2001 repa ale Tittlemier, President Midwest Construction Corp. l VI 7e Reviewed ��z : . ` L Date: ,z/ i z City of Pueblo J Phase XI, Page 2 (07/27/01) Phase XI, Page 2 (07/27/01) 1421809 Page: 26 of 31 01/23/2002 11:33G ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT "B" SUBDIVISION NAME: Boulevard Park DEVELOPER: Midwest Construction Corp. PHASES II - XI TABLE OF COSTS Phase II - $630,202.00 Phase III - 619,927.00 Phase IV - 478,952.50 Phase V - 418,284.50 Phase VI - 475,095.00 Phase VII - 868,052.00 Phase VIII - 405,922.80 Phase IX - 301,095.50 Phase X - 913,667.50 Phase XI - 373,183.50 $5,484,382.30 1421809 Page: 27 of 31 01/23/2002 11:339 ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 ADDENDUM TO BOULEVARD PARK DEVELOPMENT AGREEMENT (PHASED CONSTRUCTION) This addendum shall be incorporated in and become a part of the Boulevard Park Development Agreement ( "Agreement ") of even date herewith between the City of Pueblo and Developer and enforceable as provided in said Agreement. 1. Developer will develop the land described in Exhibit "A" attached to the Agreement (the "Subdivision ") in separate phases to be identified herein as follows: 2. Phase I shall consist of the following lots within the Subdivision: Lot 20, Block 8, Lots 1 - 20, Block 9 and Lots 1 - 18, Blockl0. All improvements are complete. 3. Phase II, Phase II1, Phase IV, Phase V, Phase VI, Phase VII, Phase VIII, Phase IX, Phase X and Phase XI shall consist of the following lots within the Subdivision: Phase II - 30 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 9; 21 - 28, Block 10; 1 - 20, Block 19; 1 - 8, Block 20: 15 - 20, Block 9; and vacated portion of Perry Ave. (1 Lot). Phase III - 46 buildable R -2 Lots, consisting of platted Lots: 28 - 40, Block 26; 21 - 40, Block 27; 21 - 40, Block 28; 1 - 20, Block 37; and l - 20, Block 38. Phase IV - 52 buildable R -2 Lots, consisting of platted Lots: 8 -20, Block 26; 28 - 40, Block 16; 1 - 20, Block 27; 21 -40, Block 17; 21- 40, Block 18; and 1 - 20, Block 28. Phase V - 52 buildable R -2 Lots, consisting of platted Lots: 27 - 40, Block 6; 8 - 20, Block 16; 21 - 40, Block 7, 1 - 20, Block 17; 21 - 40, Block 8; and 1 - 20, Block 18. Phase VI - 40 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 19; 21 - 40, Block 20; 1 - 20, Block 29, and 1 -20, Block 30. Phase VII - 40 R -2 Lots, consisting of platted Lots: 21 - 40, Block 29; 21 - 40, Block 30; 1 - 20, Block 39; and I - 20, Block 40. Phase VIII - 40 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 39; 21 - 1421809 Page: 28 of 31 01/23/2002 11:33F ChrisC.Munoz PuebloCtyClkBRec AGREE R 155.00 D 0.00 40, Block 40; 1 - 20, Block 49, and 1 - 20, Block 50. Phase IX - 29 buildable R -2 Lots, consisting of platted Lots: 21 - 40, Block 37; 21 - 40, Block 38; and 1 - 20, Block 48. Phase X - 56 buildable R -3 Lots, consisting of platted Lots: 21 - 40, Block 48; 21 - 36, Block 49; and 21 - 40, Block 50, Phase XI - 24 R -4 Lots, consisting of platted Lots: 7 - 20, Block 6; 1 - 20, Block 7; and 1 - 18, Block 8, 4. Prior to the issuance of a building permit within any Phase, construction plans for all Required Public Improvements within the Phase, and those that serve the Phase as determined by the Director of Public Works ( "Director ") must be approved by the Director. All construction plans must be prepared under the direct supervision of a Professional Engineer registered in the State of Colorado and certified accordingly. Detailed construction quantities and cost estimates of the Required Public Improvements within the Phase, and those that serve the Phase, certified by the Professional Engineer, must also be submitted. These cost estimates will take precedence over Exhibit "B" cost estimates in the Agreement with respect to the Required Public Improvements for such Phase. Developer shall construct and install all of the Required Public Improvements in the manner and as described in the Agreement needed and required to serve the lots with each Phase. 6. For purposes of determining the extent and timing of the Required Public Improvements, each Phase shall be considered separately and an event requiring completion of the improvements in one Phase will not require completion of improvements in the other Phases. 7. After completion of the Required Public Improvements for any Phase and approval thereof by the Director, the City will release the lots in that Phase from the Agreement and this Addendum 8. The Agreement as amended by this Addendum shall remain in full force and effect and the covenants of this Addendum shall run with the land within the Subdivision and shall extend to, be binding upon, and inure to the benefit of the City and Developer and their respective heirs, personal representatives, successors, and assigns. 1421809 Page: 29 of 31 01/23/2002 11:339 ChrisC.Munoz PuebloCtyCI Mec AGREE R 155.00 D 0.00 Executed at Pueblo, Colorado as of ) '�:' - L /— Midwest Construction Corp. s r J rr ale envier, President STATE OF COLORADO) ) ss. COUNTY OF PUEBLO ) The oregoing instrument was acknowledged before me this day of 2001, by Midwest Construction Co .,a Nevada corporation, Developer. My Commission Expires: / d Z2�� PRA M�Ch� �y'•AC/ �G : o0 O My Commission Expiies ;,v i u20U i Notary Public CITY OF PUEBLO, a Municipal Corporation By: President of the City Council 3 1. ­­,l 110111 1421809 Page: 30 of 31 ChrisC.Munoz PuebloCtyCl Mec AGREE R 155.001 /23D20.0011:33F (DETENTION FACILITY MAINTENANCE) ADDENDUM TO BOULEVARD PARK DEVELOPMENT AGREEMENT This Addendum shall be incorporated in and become a part of the Boulevard Park Development agreement of even date ( "Agreement ") for the land described in Exhibit "A" attached to the Agreement and enforceable as provided in the Agreement. 1. Developer will construct and install as part of the Required Public Improvements for the Subdivision the detention facility and associated improvements in accordance with the plans and specifications prepared by Developer, approved by, and on file with the City. Developer shall replace the top soil after construction of the detention facility and revegetate by seeding the entire area with a drought tolerant grass mix approved by the City. Developer will provide a temporary irrigation system for, and irrigate the revegetated area after planting until the grasses are well established. Developer will be responsible for all costs associated with the construction of the detention facility and associated improvements as well as the temporary irrigation system, revegetation, and irrigation including fees payable to the Board of Water Works and charges for water. 2. Developer will maintain in good condition and repair the detention facility, associated improvements and revegetation (including irrigation and mowing) until (i) the detention facility, associated improvements and revegetation are accepted for maintenance in writing by the City's Director of Public Works (the "City's Acceptance ") and (ii) Developer pays the Maintenance Contribution to the City. 3. Developer will pay to City the sum of $ 9,755. 00 as a one -time contribution for future detention facility maintenance (the "Maintenance Contribution ") on or before the earlier of (1) the date of City's Acceptance in writing by the City's Director of Public Works, or (ii) the date Developer requests release from the Agreement for the last lot or lots in the Subdivision, or (iii) the date of issuance of a Certificate of Occupancy for the last structure in the Subdivision. 4. Developer will be released from all obligations tender this Addendum after City's Acceptance in writing by the City's Director of Public Works and receipt by City of the Maintenance Contribution. Thereafter, City will assume the obligation to maintain the detention facility, associated improvements and revegetation. 5. The Agreement as amended by this Addendum shall remain in full force and effect and the covenants of this Addendum shall run with the land within the Subdivision and shall extend to, be binding upon, and inure to the benefit of City and Developer and their respective heirs, personal representatives, successors, and assigns. 14218 @9 Page: 31 of 31 01/23/2002 11:330 ChrisC.Munoz Pueb1oCtyC1k &Rec AGREE R 155.00 D 0.00 Executed at Pueblo, Colorado as of Developer i -- By. STATE OF COLORADO ) COUNTY OF PUEBLO of t forego g instrument was acknowledged before me on this n day 2001 by /— Developer. My Commission Expires / [SEA 1] D \G,rp. T Mq ® y9 F e .� r °r - ATTESP Commission Ex{ ;Wr , w zuuj Not ry Public CITY, , UEBLQ, A Municipal Corporation By: ehl of City Council City rk STATE OF COLORADO ) COUNTY OF PUEBLO The foregoing instrument was acknowledged before me on this 14th day of January 2002 by Michael Occhiato as President of City Council, and Gi na Dtrtrher , as City Clerk SA City of Pueblo, Colorado. f`,�, •O•• �� y Commission Expires: 8 -21 -2003 � L % ry _ �S E.o R otary Public My Cc�;q�ission Expires 08121/200