HomeMy WebLinkAbout09391RESOLUTION NO. 9391
A RESOLUTION APPROVING SUPPLEMENTAL
AGREEMENT NO. 1 BETWEEN THE CITY OF PUEBLO
AND BLACK & VEATCH CORPORATION FOR
PROFESSIONAL SERVICES ASSOCIATED WITH THE
HEADWORKS RENOVATION AT THE WASTEWATER
TREATMENT PLANT
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
Supplement Agreement No. 1 dated July
dated March 28, 2001, by and between Pueblo,
Veatch Corporation, a copy of which is attached
hereby approved.
SECTION 2.
23, 2001 to the original agreement
a Municipal Corporation and Black &
hereto and made a part hereof, is
Funds for said professional services in the amount of $24,042.00, shall be paid
from Account No. 525 - 4110 - 432.30 -01.
SECTION 3
The President of the City Council is hereby authorized to execute said
Agreement in the name of Pueblo, a Municipal Corporation, and the City Clerk shall affix
the seal of the City thereto and attest the same.
INTRODUCED: September 24, 2001
IL PERSON
APPROVED:
ITY COUNCIL
ATTESTED BYE— _
�TY CLERK
ED
0
Background Paper for Proposed
RESOLUTION
AGENDA ITEM # A
DATE: SEPTEMBER 24, 2001
DEPARTMENT: WASTEWATER
Tom Cvar
TITLE
A RESOLUTION APPROVING SUPPLEMENTAL AGREEMENT NO. 1 BETWEEN
THE CITY OF PUEBLO AND BLACK & VEATCH CORPORATION FOR
PROFESSIONAL SERVICES ASSOCIATED WITH THE HEADWORKS
RENOVATION AT THE WASTEWATER TREATMENT PLANT
ISSUE
Should the City Council approve a Resolution supplementing an existing agreement for
professional services related to the renovation of the Headworks at the City's wastewater
treatment plant?
RECOMMENDATION
Approval of Resolution
BACKGROUND
The Wastewater Department recently completed a master plan for the City's wastewater
treatment plant. The first objective of the master plan was to assess the capacity of the
existing facilities. The second was to develop a phased set of improvements to keep pace
with growth and regulatory requirements.
Proposals for engineering services were solicited from qualified firms and the contract for
the design phase of the Headworks Renovation Project was awarded to Black & Veatch
by Resolution. Subsequently, a final clarifier at the Wastewater Treatment Plant suffered
damage from the effects of higher than normal ground water which we believe is
associated with the deposition of sand and gravel from the Fountain River into the
Arkansas River channel. The tank was de- watered for repair work when the hydrostatic
pressure exerted by the ground water caused the concrete floor of the tank to fail. The
supplemental agreement would authorize Black & Veatch to include the engineering
services for the repair of the damaged clarifier, in the existing agreement. This
supplement would utilize existing competitively developed fees for engineering services
associated with the repair of the clarifier such as, plant visits, specifications, bidding and
plans. In addition the inclusion of the repair work would leverage the existing services
for the Headworks portion of the project such as combining site visits and other services.
FINANCIAL IMPACT
The prior maximum sum of $167,232 for the design phase of the Headworks Renovation
Project, would be increased by $24,042 to provide for the additional engineering services
for the clarifier repair project. This adjustment increases the top limit of the contract to
$191,274.00, not including construction phase services, which will be negotiated at the
completion of the bidding phase.
Funds for the additional services shall be paid from the Wastewater Treatment Plant's
professional services Account No. 525- 4110- 432.30 -01.
SUPPLEMENTAL AGREEMENT NO. 1
TO THE
AGREEMENT FOR PROFESSIONAL SERVICES
DATED
MARCH 28, 2001
The Agreement for Professional Services between the City of Pueblo, Colorado (Client) and Black
& Veatch Corporation (Consultant), dated March 28, 2001, is revised as follows. The effective date
of Supplemental Agreement No. 1 shall be July 23, 2001.
SECTION 1. GENERAL SCOPE OF SERVICES
Consultant shall satisfactorily perform the additional professional services described in Schedule 1-
1, attached hereto and incorporated into the "Basic Services" described in the original agreement.
All other provisions of SECTION 1 remain unchanged and in effect.
SECTION 2. CONSULTANT'S RESPONSIBILITIES
This section remains unchanged and in effect.
SECTION 3. FEES FOR SERVICES; PAYMENT
The prior maximum sum of $167,232 is hereby increased by $24,042.00, as set forth in Schedule 1-
2. This adjustment increases the top limit to $191,274.00, not including construction phase
services, which will be negotiated at the completion of the bidding phase. All other provisions of
SECTION 3 remain unchanged and in effect.
SECTIONS 4 THROUGH 11
All of these sections remain unchanged and in effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Supplemental
Agreement No. 1 as of th0ay and year written above.
CITY OF PUEBLO, A MUNICIPAL CORPORATION
Attest:
City Clerk
SA -1- 1
By: Black & Veatch Corpo
Name: 1,7
L ,
Title: Pier � /'U /e
Balance of Appropriate Exists for this
Contract and Funds are Available
By: `
Direc r o inance
Approved as to Form:
By:
City Attorney
SA -1- 2
SCHEDULE 1 -1
ADDITIONAL PROFESSIONAL SERVICES
FOR
SUPPLEMENTAL AGREEMENT NO. 1
Basic Services
(Scope of Work)
Project: Secondary Clarifier Repair at the WWTP
Design /Bidding Phase
The following tasks are included in the design and bidding phase for repair of the secondary
clarifier at the WWTP:
• Preliminary investigation of record drawings and equipment manufacturer's data.
• Detailed field investigation following dewatering ( dewatering by Owner)
• Develop Design Memorandum for repair work (incorporated in Headworks Renovation
Design Memo)
• Design Memorandum review (30 %)
• Preliminary clarifier repair design drawings (incorporated in Headworks Renovation
Design drawings)
• Level 1 design review workshop (50 %)
• Complete design drawings and documents (incorporated in Headworks Renovation
design drawings)
• Level 2 design review workshop (90 %)
• Finalize drawings & documents (100 %)
• Advertise for bids
• Review bids and recommend award
* Unless the City negotiates directly with contractor(s) to complete the clarifier repairs as
emergency work. In which case, Consultant will provide the technical drawings and
specifications needed by the City to negotiate prices for the repair work.
Consultant shall provide the drawings and specifications needed for City review and bidding by
prospective contractors. Text shall be prepared using Microsoft (MS) Word software and drawings
shall be completed in AutoCad 13 format.
Construction Phase
To be negotiated at the end of the bidding phase.
SA -1- 3
Schedule 1 -2
City of Pueblo, Colorado
SECONDARY CLARIFIER REPAIR ADDITION TO
WWTP HEADWORKS RENOVATION PROJECT
Engineering Fee
23-Jul-01
I. Resident Engineer cost is based on 20 tours per week on -site inspection for 12 months.
STAFF
-HOURS
COST
PROJECT TASK SERIES
Project Project staff
Manager
Electrical
Architect
Instrument Mechanical Resident
Technican
Total Staff
Clerical
Total B&V
BaV
Billf Rate
Weer Engineer
Engineer
Engineer Engineer En inesr
Hours
Labor Cost
Expenses
Subcontracts
Total Fee
138.00 132.00 102.00
.00 105.00
105.00 90.00 5.00
5.00
.00
Design and Bidding Phases
Detailed Design
24 60 320
96 160
100 120
460
108 1,448
$125.312
$20,000
$145,312
Geotech Subcontract
Clarifier Repair
4 20 140
4
4
$7,000
$7,000
48
20 240
$22,392
$1,650
$24,042
Bidding
fl 8 80
6
8
40 152
$13.920
$1.000
$14,920
Subtotal
36 88 $40
96 172
112 120
608
168 1,8110
$161,624
$22,660
$7,000
$181,274
Construction Phase
Project Administration
40
60
384
24
80
32
64
24
708
$73,344
Resident Inspection
$73,344
1.040
1,040
$6,000
$s4.40o
Subtotal
10
60
384
24
80
32
6+
,0
24
1,748
L$188.400
$8,000
$167,7M
OURS /FEE
NOTES:
120
252
144
184
1 040
508
192
3,588
$28 650
$7,000
$359 018
I. Resident Engineer cost is based on 20 tours per week on -site inspection for 12 months.