HomeMy WebLinkAbout09133RESOLUTION NO. 9133 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT FOR THE SOUTHWEST STORM SEWER EMERGENCY REPAIR PROJECT, AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, proposals for THE SOUTHWEST STORM SEWER EMERGENCY REPAIR PROJECT have been received and examined; and WHEREAS, the proposal of K.R. SWERDFEGER CONSTRUCTION, INC., of PUEBLO, Colorado, was the lowest of those bids determined to be responsible; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that: �FC`TIC�N 1 A contract for the Southwest Storm Sewer Emergency Repair Project be, and the same is hereby awarded to said bidder in the amount of $76,400.00. SECTION 2 The Purchasing Agent be, and she is hereby authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3 In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. 1 Contingencies and Additional Work --- $15,000.00 SECTION 4 Funds for said project shall be taken from the Undesignated Fund Balance and paid out of the Capital Improvement Fund. INTRODUCED Octo ber 10 1 2000 By RchWe CounciW on APPROVED 14 l7 IG �- -� President of City Council ATTEST: City Clerk 2 Council Agenda Ar TITLE : A Resolution AuOtefiz4g a Construction Contract for The Southwest Storm Sewer Emergency Repair Project DEPARTMENT: Public Works ISSUE AGENDA ITEM # --- DATE : October 10, 2000 Should the City Council award a construction contract for the Southwest Storm Sewer Emergency Repair Project to K.R. Swerdferger Construction for $76,400. RECOMMENDATION Approval of this Resolution BACKGROUND The Southwest Storm Sewer, located east of Pueblo Blvd. beneath the bicycle trail, from Northern Avenue to the Arkansas River was installed in 1973. A section of this storm sewer, approximately 340 feet in length, and 10 feet in diameter consists of corrugated metal pipe. Over the years the bottom of this pipe has been eroded by abrasion and corroded by rust, resulting in numerous holes in the pipe. This condition allows soils around the pipe to be drawn into the pipe during high flows, thus creating voids which result in subsidence at the surface. The settlement of a portion of the bike trail and a section of curb and gutter at the street edge alerted the Public Works Department to the problem. In the interest of time, four heavy construction contractors were contracted to submit bids for the emergency repair work. Two of those contractors submitted bids, with K.R. Swerdferger Construction, Inc. submitting the lowest bid. A copy of both bids is attached for information. The repair work will consist of placing a six inch thick reinforced concrete slab in the bottom of the pipe approximately 6' -5" wide, the full length of the damage section. (see typical section attached) FINANCIAL IMPACT Funds from this project will be taken from the undesignated Fund Balance and paid out of the Capital Improvement Fund. o � 0