HomeMy WebLinkAbout8833RESOLUTION NO. 8833
A RESOLUTION APPROVING A CONTRACT BETWEEN THE CITY
OF PUEBLO AND THE STATE OF COLORADO, DEPARTMENT OF
TRANSPORTATION RELATING TO THE WIDENING OF THE BRIDGE
ON WM. WHITE BLVD AT PUEBLO AIRPORT INDUSTRIAL PARK
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that:
SECTION 1
The Contract between the City of Pueblo and the State of Colorado, Department of
Transportation, identified as Contract No. BRO CO20 -001, Design and Construction of
Improvements for the Wm. White Bridge, a copy of which is attached hereto and made a part
hereof, having been approved as to form by the City Attorney, is hereby approved.
SECTION 2
The President of City Council is authorized to sign and deliver the Contract in the name of
the City of Pueblo and the City Clerk is directed to affix the seal of the City thereto and attest same.
SECTION 3
The total cost of the design and construction improvements to the bridge is estimated to be
$452,410.00. The City's matching share is 20% of all costs eligible for federal participation and
100% of all non - participating costs. It is estimated that this share will be $90,810.00. The City is
eligible for reimbursement for 80% of eligible participating costs up to $354,368.00.
1
SECTION 4.
Funds for said project shall be from the 'h Cent Sales Tax Fund.
INTRODUCED October 25 , 1999
By Rich Golenda
Councilperson
APPROVED:
--
President of City Council
[SEAL;
ATTEST:
6 City Clerk
2
I o
• T
(FMLAWRK)
BRO CO20-011,12856
Pueblo R- 2, /(reo)
CONTRACT
Rev ? /98
99 HA2 00095
THIS CONTRACT, made this � day of , 19'�? by and between the
State of Colorado for the use and benefit of THE COLORADO DEPARTMENT OF
TRANSPORTATION, hereinafter referred to as the State or CDOT, and CITY OF PUEBLO, a
Municipal Corporation, STATE OF COLORADO, P.O. BOX 1427, PUEBLO, CO 81002 - 14227,
FEIN: 846000615, hereinafter referred to as the Local Agency, or the contractor.
FACTUAL RECITALS.
1. Authority exists in the law and funds have been budgeted, appropriated and otherwise made
available and a sufficient unencumbered balance thereof remains available for payment of project
and Local Agency costs in Fund Number 400, Appropriation Code 010, Organization Number 9991,
Program 2000, Functions 3015 & 3988 & 3301, Objects 2312 1P for Design and Utility and Object
2311 1 P for Construction, Phases D & U & C, Reporting Category 2210, Contract Encumbrance
Number 12865, (Contract Encumbrance Amount: $442,960.00).
2. Required approval, clearance and coordination has been accomplished from and with appropriate
agencies.
3. Pursuant to Title I, Subtitle A, Section 1108 of the Transportation Equity Act for the 21 st Century
of 1998 (TEA -21) and to applicable provisions of Title 23 of the United States Code and
implementing regulations at Title 23 of the Code of Federal Regulations, as may be amended,
(collectively referred to hereinafter as "the federal provisions "), certain Federal funds have been and
will in the future be, allocated for highway projects requested by Local Agencies and eligible under
the Surface Transportation Program that has been proposed by the State and approved by the Federal
Highway Administration (FHWA), hereinafter referred to as the program.
-1-
♦ r
• 4. Pursuant to § 43 -1 -223, C.R.S. and to applicable portions of the federal provisions, the State is
responsible for the general administration and supervision of performance of projects in the program,
including the administration of federal funds for a program project performed by a local agency
under a contract with the State.
4.5 The Local Agency has requested that a certain local highway project be funded as part of the
program, and by the date of execution of this contract the Local Agency (and/or the State) has
completed and submitted a preliminary version of CDOT form #463, or Scope of Work, describing
the general nature of that project work. The Local Agency understands that, before the project work
is actually started, the description of the project work in that CDOT form #463, or Scope of Work,
will likely be revised as a result of design changes made by CDOT, in conjunction and coordination
with the Local Agency, in its internal review process. The Local Agency desires to agree to perform
the project work as described in the Form #463, or Scope of Work, as it may be revised in that
Process.
5. Federal -aid funds have been made available for project, BRO CO20 -011, for design and
construction of improvements for the William White Bridge as more specifically described in
Exhibit A (the Form #463 and/or a "Scope of Work "), in, Pueblo, Colorado, hereinafter referred to
as "the project" or "the work ".
6. The matching ratio for this federal -aid project is 80% federal -aid funds to 20% Local Agency
funds, it being understood that such ratio applies only to such costs as are eligible for federal
participation, it being further understood that all non - participating costs shall be borne by the Local
Agency at 100 %.
7. The Local Agency desires to comply with the federal provisions and other applicable
requirements, including the State's general administration and supervision of the project through this
contract, in order to obtain federal funds for the project.
8. The Local Agency has estimated the total cost of the Work and is prepared to provide its match
share of the cost, as evidenced by an appropriate ordinance or resolution duly passed and adopted
by the authorized representatives of the Local Agency, which expressly authorizes the Local Agency
to enter into this contract and to expend its match share of the Work. A copy of this ordinance or
resolution is attached hereto and incorporated herein as Exhibit B.
-2-
%-
t F, .
. 9. This contract is executed under the authority of Sections 29 -1 -203, 43 -1 -110, 43 -1 -116,
43- 2- 101(4)(c) and 43 -2 -144, C.R.S., as amended, and the Local Agency ordinance /resolution.
10. The parties hereto desire to agree upon the division of responsibilities with regard to the project.
11. The Local Agency is adequately staffed and suitably equipped to undertake and satisfactorily
complete some or all of the Work.
12. The State certifies that such work can be more advantageously performed by the Local Agency.
NOW, THEREFORE, it is hereby agreed that:
I. STANDARD FORM CONTRACT
This is a standard form contract that is designed to efficiently contract for and administer 2 types of
program projects: 1) program projects which include the same basic work elements (design;
construction; construction administration by local agency; right -of -way; utilities; etc.); and, also,
2) program projects with specific differences in those basic work elements (ems, a specific project
may include design but no construction, or it may include design and construction but the State will
do the construction administration, etc.)
The form contract accommodates both types of projects by using qualifying language to condition
the application of particular contract requirements, based on whether specific work elements are
included in the project. For instance, where the contract provides ... "If the Work includes
engineering /design services, the Local Agency shall perform the following requirements ... ", the
Local Agency need perform those requirements only if engineering /design services are expressly
included in the project, as defined in the Scope of Work. (Conversely, notwithstanding that language
is in the contract, the Local Agency can ignore those "requirements" if engineering /design services
are NOT expressly included in the Scope of Work.)
The Local Agency shall interpret such qualifying language in that manner. By using such language,
the form contract can apply to both the general and the specific types of projects, thus making it
easier to administer and saving the State and the Local Agency time and expense.
-3-
II. PROJECT DESCRIPTION
"The project" or "the Work" under this contract shall consist of design and construction of
improvements for the William White Bridge, hereinafter referred to as "the project" or "the
Work" in Pueblo, Colorado, as more specifically described in Exhibit A, attached hereto and
made a part hereof (the Form #463 and/or a "Scope of Work ") as it may be revised by the parties
in the design review process before the project work is actually started.
III. INCORPORATION BY REFERENCE
All federal and state statutes, regulations, specifications, administration checklists, directives,
procedures, documents, and publications that are specifically identified and/or referenced in this
contract, together with all exhibits and attachments and addenda to this contract, are incorporated
herein by this reference as terms and conditions of this contract as though fully set forth.
IV. WORK RESPONSIBILITY
The Local Agency shall be responsible to perform (all design and/or right -of -way and/or utility
and/or construction and/or construction administration tasks required to complete) the Work, and
the Local Agency shall comply with all applicable terms and conditions of this contract in
performing the Work, including those process and task responsibilities addressed in the Pre -
Construction and Construction Administration Checklists attached hereto and made a part hereof.
The responsible party shall perform all such tasks in accordance with applicable requirements
and standards, including those in this contract and in applicable law.
V. PROJECT FUNDING PROVISIONS
A. The Local Agency has estimated the total cost the Work to be $452,410.00 which is to be
funded as follows:
-4-
a. Federal participating funds:
(80% of $452,000.00) $361,600.00
b. Local Agency participating share:
(20% of $452,000.00) $ 90,400.00
C. Local Agency Matching
for CDOT - incurred non participating costs: $ 410.00
Total Funds:
$452,410.00
B. The matching ratio for the federal participating funds for this project is 80% federal -aid funds
(CFDA 420 2050) to 20% Local Agency funds, it being understood that such ratio applies only
to the $452,000.00 that is eligible for federal participation, it being further understood that all
non - participating costs are borne by the Local Agency at 100 %. If the total participating cost of
performance of the Work exceeds $452,000.00, and additional federal funds are made available
for the project, the Local Agency shall pay 20% of all such costs eligible for federal participation
and 100% of all nonparticipating costs; if additional federal funds are not made available, the
local agency shall pay all such excess costs. If the total participating cost of performance of the
Work is less than $452,000.00, then the amounts of Local Agency and federal -aid funds will be
decreased in accordance with the funding ratio described herein. The performance of the Work
shall be at no cost to the State.
C. The maximum amount payable to the Local Agency under this contract shall be $354,368.00,
unless such amount is increased by an appropriate written modification to this contract executed
before any increased cost is incurred. It is understood and agreed by the parties hereto that the
total cost of the Work stated hereinbefore is the best estimate available, based on the design data
as approved at the time of execution of this contract, and that such cost is subject to revisions (in
accord with the procedure in the previous sentence) agreeable to the parties prior to bid and
award.
D. The parties hereto agree that this contract is contingent upon all funds designated for the
project herein being made available from federal and/or state and/or Local Agency sources, as
applicable. Should these sources, either federal or Local Agency, fail to provide necessary funds
as agreed upon herein, the contract may be terminated by either party, provided that any party
-5-
• between the parties hereto, the Local Agency agrees that at the request of the State, the State
Treasurer may withhold an equal amount from future apportionments due the Local Agency from
the Highway Users Tax Fund and to pay such funds directly to the State. Interim funds, until the
State is reimbursed, shall be payable from the State Highway Supplementary Fund (400).
2. If the Local Agency fails to make timely payment to the State as required by this section
(within 45 days after the date of each bill), the Local Agency shall pay interest to the State at a
rate of one percent per month on the amount of the payment which was not made in a timely
manner, until the billing is paid in full. The interest shall accrue for the period from the required
payment date to the date on which payment is made.
D. The Local Agency will prepare and submit to the State monthly charges for costs incurred
relative to the project. The Local Agency will prepare project charges in accordance with the
State's standard policies, procedures, and standardized billing format attached hereto and made a
part hereof.
VII. STATE COMMITMENTS
A. The State will provide liaison with the Local Agency through the State's Region Director,
Region 2, 905 Erie Avenue, Pueblo, Colorado 81002, (719) -546 -5452. Said Region Director
will also be responsible for coordinating the State's activities under this contract. Said Region
Director will also issue a "Notice to Proceed" to the Local Agency for commencement of the
Work. All communication relating to the day -to -day activities for the work shall be exchanged
between representatives of the State's Transportation Region 2 and the Local Agency. Until
changed by notice in writing, all such notices and correspondence shall be addressed as follows:
If to State:
Bassam Issa
CDOT Region 2
905 Erie Avenue
Pueblo, CO 81002
(719) 546 -5729
If to the Local Agency:
Tom Cvar
City of Pueblo
211 E. D Street
Pueblo, CO 81003
(719) 543 -2860
B. The State will reimburse the Local Agency for the federal -aid share of the project charges, as
provided in Section VI(A).
-7-
Ir
t
• a 1
C. If the Work includes construction, the State, at its discretion, will review construction plans,
special provisions and estimates and will cause the Local Agency to make those changes therein
that the State determines are necessary to assure compliance with State and FHWA requirements.
D. The State will perform a final project inspection prior to project acceptance as a Quality
Control activity. When all project work has been satisfactorily completed, the State will sign the
FHWA form 1212.
VIII. LOCAL AGENCY COMMITMENTS
A. DESIGN.
If "the Work" includes preliminary design, or final design (a.k.a. "construction plans "), or design
work sheets, or special provisions and estimates (collectively referred to as "the Plans "), the party
that is responsible under Section IV (either the Local Agency or the State) for the Plans \design shall
comply with the following requirements, as applicable:
1. perform or provide the Plans, to the extent required by the nature of the Work.
2. prepare final design ( "construction plans ") in accord with the requirements of the latest
edition of the American Association of State Highway Transportation Officials (AASHTO)
manual.
3. prepare special provisions and estimates in accord with the State's Roadway and Bridge
Design Manuals and Standard Specifications for Road and Bridge Construction.
4. include details of any required detours in the Plans, in order to prevent any interference
of the construction work and to protect the traveling public.
5. stamp the Plans produced by a Colorado Registered Professional Engineer.
6. if the Local Agency is the responsible party, it shall afford the State ample opportunity
to review the Plans and make any changes in the Plans as directed by the State to comply
with FHWA requirements.
7. provide final assembly of the Plans and contract documents.
8. be responsible for the Plans being accurate and complete.
-8-
9. if the Local Agency is the responsible party, it may enter into a contract with a consultant
to do all or any portion of the Plans and/or of construction administration. Provided,
however, that if federal -aid funds are to participate in the cost of such work to be done by a
consultant, the Local Agency shall ensure that its procurement of that consultant contract
(and the performance /provision of the Plans under that contract) complies with all applicable
requirements of Title 23, Code of Federal Regulations (CFR), Part 172, (concerning the
Administration of Engineering and Design Related Service Contracts), and with any
procedures implementing those requirements as provided by the State. Those requirements
and procedures include, without limitation:
a) the Local Agency /Contractor shall submit any design consultant subcontract to CDOT
for approval prior to its execution by the Local Agency /Contractor, as required by section
172.5 (d);
b) all changes in the contract shall be by written supplemental agreement and must have
prior approval of the State and FHWA. As soon as the contract with the consultant has been
awarded by the Local Agency, one copy of the executed contract shall be submitted to the
State. Any amendments to such contract shall be similarly submitted;
c) all consultant billings under that contract shall comply with the State's standardized
consultant billing format. Examples of the billing formats for the various methods of
contract payment are attached hereto and made a part hereof;
d) the Local Agency /Contractor shall also use the CDOT procedures as described in
Attachment #1 to administer that design consultant subcontract, to comply with sections
172.5(b) and (d);
e) to expedite any CDOT approval, the Local Agency /Contractor's attorney, or other
authorized representative, may also submit a letter to CDOT certifying Local
Agency /Contractor compliance with those CDOT Attachment #1 procedures and with the
requirements of sections 172.5(b) and (d).
f) the Local Agency shall ensure that its consultant contract contains the following
language verbatim:
1) "The design work under this contract shall be compatible with the requirements
of a separate contract between the Local Agency and the State (which is incorporated
herein by this reference) for the design/construction of the project. The State is an
intended third party beneficiary of this contract for that purpose."
2) "Upon advertisement of the project work for construction, the consultant shall
make available services as requested by the State to assist the State in the evaluation
of construction and the resolution of construction problems that may arise during the
construction of the project."
3) "The consultant shall review the construction contractor's shop drawings for
conformance with the contract documents and compliance with the provisions of the
State's publication, "Standard Specifications for Road and Bridge Construction ", in
connection with this work."
10. Following award of the construction contract(s) for the project, no further changes shall
be made in the Plans except by agreement in writing between the parties. The Plans shall be
considered final when approved and accepted by the parties hereto, and when final they shall
be deemed incorporated herein.
B. CONSTRUCTION.
If "the Work" includes construction, the party that is responsible under Section IV (either the Local
Agency or the State) for the construction/construction administration shall comply with the
following requirements, as applicable:
1. administer the construction in accord with the project's Pre - construction and Contract
Administration Checklists. Such administration shall include project inspection and
testing; approving sources of materials; performing required plant and shop inspections;
documentation of contract payments, testing, and inspection activities; preparing and
approving pay estimates; preparing, approving, and securing the funding for contract
modification orders (CMOs) and minor contract revisions (MCRs); processing contractor
claims; construction supervision; and, meeting the Quality Control (QC) requirements of the
FHWA/State stewardship program, all as more fully described in the project's Pre -
construction and Contract Administration Checklists.
-10-
T '
2. if the Local Agency is the responsible party, it shall appoint a qualified professional
engineer, licensed in the State of Colorado, as the Local Agency Project Engineer (LAPE),
to perform that administration. The LAPE shall administer the project in accordance with
this agreement, the requirements of the construction contract, and applicable State
procedures. The LAPE may be an employee of the Local Agency or may be a consultant.
If the LAPE is an employee of the Local Agency, the LAPE shall be in responsible charge
of the construction of the project (as provided in Section 12 -25 -102 C.R.S. as amended),
notwithstanding any exception described in Section 12 -25 -103, C.R.S., as amended.
3. if the Local Agency is the responsible party, and if bids are to be let for the construction
of the project, the Local Agency shall (in conjunction with the State) advertise the call for
bids and (upon concurrence by the State) award the construction contract(s) to the low
responsive, responsible bidder(s).
a) In advertising and awarding the bid for the construction of a federal -aid project, the
Local Agency shall comply with applicable requirements of 23 U.S.C. § 112 and 23 C.F.R.
§ § 633 and 635. Those requirements include, without limitation, . that the Local
Agency /Contractor shall physically incorporate the entire "Form 1273" (which, if relevant
to this contract, is attached) verbatim into any subcontract(s) for those services as terms and
conditions thereof, as required by 23 CFR 633.102(e).
b) The Local Agency has the option to accept or reject the proposal of the low bidder for
work on which competitive bids have been received. The Local Agency must declare the
acceptance or rejection at the award conference or within 3 working days after said bids are
publicly opened, whichever occurs later.)
c) By indicating its concurrence in such award at the award conference, the Local Agency
acting by or through its duly authorized representatives, agrees to provide additional funds,
subject to their availability and appropriation for that purpose, if required to complete the
Work under this project if no additional federal -aid funds will be made available for the
project.)
4. In the event that all or part of the construction work is to be accomplished by Local
Agency personnel i.e., by "force account "), rather than by a contractor pursuant to a contract
-11-
e
with the Local Agency, the Local Agency will insure that all such force account work is
accomplished in accordance with the pertinent State specifications and requirements and
with 23 C.F.R. Part 635, Subpart B, "Force Account Construction ".
a) Such work will normally be based upon estimated quantities and firm unit prices
agreed to between the Local Agency, the State and the FHWA in advance of the Work, as
provided for in Section 635.204(c). Such agreed unit prices shall constitute a commitment
as to the value of the Work to be performed.
b) An alternative to (a) is that the Local Agency may agree to participate in the Work
based on actual costs of labor, equipment rental, materials supplies and supervision necessary
to complete the Work. Where actual costs are used, eligibility of cost items shall be
evaluated for compliance with Federal Acquisition Regulations (FAR), 48 C.F.R. Part 31.
c) Rental rates for publicly owned equipment will be determined in accordance with
Section 109.04 of the State's "Standard Specifications for Road and Bridge Construction ".
d) All force account work shall have prior approval of the State and/or FHWA and shall
not be initiated until the State has issued a written notice to proceed.
C. ROW ACQUISITION/RELOCATION.
If "the Work" includes right of way acquisition and/or relocation, the party that is responsible under
Section IV (either the Local Agency or the State) for the right of way acquisition and/or relocation
shall comply with the following requirements, as applicable:
If acquisition and relocation assistance is required for the project, the Local Agency will be
responsible to perform the acquisition and relocation assistance, as required by Sections 24 -56 -101,
et seq., C.R.S. Prior to this project being advertised for bids, the Local Agency will certify in
writing to the State that all right of way has been acquired in accordance with the applicable State
and federal regulations, or that no additional right of way is required.
D. UTILITIES.
The Local Agency will be responsible for obtaining the proper clearance or approval from any utility
company which may become involved in this project, by separate agreement between the Local
-12-
� r
, Agency and the utility, if necessary. Prior to this project being advertised for bids, the Local Agency
will certify in writing to the State that all such clearances have been obtained.
E. RAILROADS.
In the event the project involves modification of a railroad company's facilities at a railroad grade
crossing whereby the Work is to be accomplished by railroad company forces, the Local Agency
shall make timely application to the State Public Utilities Commission requesting its order providing
for the installation of the proposed improvements and not proceed with that part of the work without
compliance. The Local Agency shall also establish contact with the railroad company involved for
the purpose of complying with applicable provisions of 23 Code of Federal Regulations 646, Subpart
B, concerning federal -aid projects involving railroad facilities, including:
1. Executing an agreement setting out what work is to be accomplished and the location(s)
thereof, and that the costs of the improvement shall be eligible for federal participation.
2. Obtaining the railroad's detailed estimate of the cost of the Work.
3. Establishing future maintenance responsibilities for the proposed installation.
4. Prescribing future use or dispositions of the proposed improvements in the event of
abandonment or elimination of the grade crossing.
5. Establishing future repair and/or replacement responsibilities in the event of accidental
destruction or damage to the installation.
F. ENVIRONMENTAL.
In its performance of the Work, the Local Agency shall comply with the applicable provisions of the
State's approved Action Plan concerning federal environmental requirements, including all federal
directives contained therein by reference. Copies of the applicable provisions may be requested from
the Office of Environmental Services, Colorado Department of Transportation, 4201 E. Arkansas
Avenue, Rm. 284, Denver Co 80222.
G. RECORD KEEPING.
The Local Agency shall maintain all books, documents, papers, accounting records and other
evidence pertaining to costs incurred and to make such materials available for inspection at all
reasonable times during the contract period and for 3 years from the date of final payment to the
Local Agency. Copies of such records shall be furnished by the Local Agency if requested.
-13-
The Local Agency shall, during all phases of the Work, permit duly authorized agents and employees
of the State and the FHWA to inspect the project and to inspect, review and audit the project records.
H. MAINTENANCE.
The Local Agency will maintain and operate the improvements constructed under this contract, at
its own cost and expense during their useful life, in a manner satisfactory to the State and FHWA,
and will make ample provision for such maintenance each year. Such maintenance and operations
shall be in accordance with all applicable statutes and ordinances, and regulations promulgated
thereunder, which define the Local Agency's obligation to maintain such improvements. The State
and FHWA will make periodic inspections of the project to verify that such improvements are being
adequately maintained.
I. FEDERAL REQUIREMENTS.
The Local Agency /Contractor shall at all times during the execution of this contract strictly adhere
to, and comply with, all applicable federal and state laws, and their implementing regulations, as
they currently exist and may hereafter be amended, which are incorporated herein by this reference
as terms and conditions of this contract. The contractor shall also require compliance with these
statutes and regulations in subgrant agreements permitted under this contract. A listing of some of
the federal and state laws that may be applicable, depending on the Local Agency /Contractor work
responsibilities under this contract, are described in ADDENDUM A.
- J. DBE REQUIREMENTS
"If the Local Agency desires to use its own DBE Program to implement and administer the DBE
provisions of Title 49 CFR Part 23 under this contract, it must submit a copy of its program's
requirements to CDOT for review and approval before the execution of this contract. If the Local
Agency uses it's program for this contract, the Local Agency shall be solely responsible to defend
that DBE Program and its use of that Program against all legal and other challenges or complaints,
at its sole cost and expense. Such responsibility includes, without limitation, determinations
concerning DBE eligibility and certification, adequate legal and factual bases for DBE goals, and
good faith efforts. CDOT approval (if any) of the Local Agency's DBE Program does not waive or
modify the sole responsibility of the Local Agency for its use as described above."
-14-
K. LOCAL AGENCY FUNDS
The Local Agency shall provide its match share and indirect cost funds for the work as outlined in
Section V.B.
IX. GENERAL PROVISIONS
A. Notwithstanding any consents or approvals given by the State for the Plans, the State will
not be liable or responsible in any manner for the structural design, details or construction of any
major structures that are designed within the Work of this contract.
B. If the Work involves construction, the State shall have the authority to suspend the Work,
wholly or in part, by giving written notice thereof to the Local Agency, due to the failure of the
Local Agency or its construction contractor to correct project conditions which are unsafe for the
Workmen or for such periods as the State may deem necessary due to unsuitable weather, or for
conditions considered unsuitable for the prosecution of the Work, or for any other condition or
reason deemed by the State to be in the public interest.
C. This contract may be terminated as follows:
(a) Termination for Cause. If, through any cause, the Local Agency shall fail to fulfill,
in a timely and proper manner, its obligations under this contract, or if the Local Agency shall
violate any of the covenants, agreements, or stipulations of this contract, the State shall thereupon
have the right to terminate this contract for cause by giving written notice to the Local Agency of
its intent to terminate and at least ten (10) days opportunity to cure the default or show cause why
termination is otherwise not appropriate. In the event of termination, all finished or unfinished
documents, data, studies, surveys, drawings, maps, models, photographs, and reports or other
material prepared by the Local Agency under this contract shall, at the option of the State, become
its property, and the Local Agency shall be entitled to received just and equitable compensation for
any services and supplies delivered and accepted. The Local Agency shall be obligated to return any
payment advanced under the provisions of this contract.
Notwithstanding above, the Local Agency shall not be relieved of liability to the State for any
damages sustained by the State by virtue of any breach of the contract by the Local Agency.
If after such termination it is determined, for any reason, that the Local Agency was not in default,
or that the Local Agency's action/inaction was excusable, such termination shall be treated as a
-15-
. termination for convenience, and the rights and obligations of the parties shall be the same as if the
contract had been terminated for convenience, as described herein.
(b) Termination for Convenience. The State may terminate this contract at any time the
State determines that the purposes of the distribution of funds under the contract would no longer
be served by completion of the project. The State shall effect such termination by giving written
notice of termination to the Local Agency and specifying the effective date thereof, at least twenty
(20) days before the effective date of such termination.
(c) Termination Due to Loss of Funding. The parties hereto expressly recognize that the
Local Agency is to be paid, reimbursed, or otherwise compensated with federal and/or State funds
which are available to the State for the purposes of contracting for the project provided for herein,
and therefore, the Local Agency expressly understands and agrees that all its rights, demands and
claims to compensation arising under this contract are contingent upon availability of such funds to
the State. In the event that such funds or any part thereof are not available to the State, the State may
immediately terminate or amend this contract.
D. Notwithstanding anything herein to the contrary, the parties understand and agree that
all terms and conditions of this contract and attachments hereto which may require continued
performance or compliance beyond the termination date of the contract shall survive such
termination date and shall be enforceable by the State as provided herein in the event of such failure
to perform or comply by the Local Agency.
E. This contract is subject to such modifications as may be required by changes in federal
or State law, or their implementing regulations. Any such required modification shall automatically
be incorporated into and be part of this contract on the effective date of such change as if fully set
forth herein. Except as specifically provided otherwise herein, no modification of this contract shall
be effective unless agreed to in writing by both parties in an amendment to this contract that is
properly executed and approved in accordance with applicable law.
F. To the extent that this contract may be executed and performance of the obligations of the
parties may be accomplished within the intent of the contract, the terms of this contract are
severable, and should any term or provision hereof be declared invalid or become inoperative for any
reason, such invalidity or failure shall not affect the validity of any other term or provision hereof.
-16-
The waiver of any breach of a term hereof shall not be construed as a waiver of any other term, or
the same term upon subsequent breach.
G. This contract is intended as the complete integration of all understandings between the
parties. No prior or contemporaneous addition, deletion, or other amendment hereto shall have any
force or effect whatsoever, unless embodied herein by writing. No subsequent novation, renewal,
addition, deletion, or other amendment hereto shall have any force or effect unless embodied in a
written contract executed and approved pursuant to the State Fiscal Rules.
H. Except as herein otherwise provided, this contract shall inure to the benefit of and be
binding upon the parties hereto and their respective successors and assigns.
I. The Local Agency represents and warrants that it currently has no interest, and shall not
acquire any interest, direct or indirect, that would conflict in any manner or degree with the
performance of the Local Agency's obligations under this contract. The Local Agency's further
covenants that, in the performance of this contract, it will not employ any person or firm having any
such known interests.
J. This contract shall become "effective" only upon the date it is executed by the State
Controller, or designee. The term of this contract shall begin on the date first written above and shall
continue through the completion and final acceptance of this project by the State, FHWA and Local
Agency.
K. The Special Provisions, Attachment LO (Certification for Federal -Aid Contracts), and
Appendix B (DBE requirements) attached hereto are hereby made a part of this contract. The Local
Agency shall comply with all applicable terms and conditions of such attachments.
L. If a conflict occurs between the provisions of this contract proper and the attachments
hereto, the priority to be used to resolve such a conflict shall be as follows:
1. The Special Provisions and the attachments enumerated in Section VI, paragraph K,
above; and
2. This contract proper;
3. Other contract attachments and exhibits, in their respective order.
M. It is expressly understood and agreed that the enforcement of the terms and conditions
of this contract, and all rights of action relating to such enforcement, shall be strictly reserved to the
-17-
, parties hereto, and nothing contained in this contract shall give or allow any such claim or right of
action by any other or third person on such contract. It is the express intention of the parties that any
person or entity other than the parties receiving services or benefits under this contract be deemed
to be an incidental beneficiary only.
N. The Local Agency assures and guarantees that it possesses the legal authority to enter
into this contract. The Local Agency warrants that it has taken all actions required by its procedures,
by -laws, and/or applicable law to exercise that authority, and to lawfully authorize its undersigned
signatory to execute this contract and to bind the Local Agency to its terms. The person(s) executing
this contract on behalf of the Local Agency warrants that they have full authorization to execute this
contract.
O. The Local Agency and the State may use one or all of the Contract Modification Tools
contained in ADDENDUM B, in order to more expeditiously change and amend the terms of this
contract, if such use is warranted by the circumstances as described and authorized therein.
sum
IN WITNESS WHEREOF, the parties hereto have executed this contract the day and
year first above written.
ATTEST:
STATE OF COLORADO
BILL OWENS, GOVERNOR
By
Chief Clerk
ARTHUR L. BARNHART
State Controller
M WL�Izl .
. By
cutive irector
DEPARTMENT OF TRANSPORTATION
APPROVED:
KEN SALAZAR
Attorney General
By
BARRY B. RYAN
Assistant Attorney General
Civil Litigation Section
ATTEST: (SEAL)
•
Title City Clerk
CITY PUEBLO, COL RADO
Y
Title President of the Coun
Federal Employer Identification
Number: 846000615
-19-
.JUN -14 -1999 13 =38 (719)546 -5414 719 546 5414 P.02102
1
City of Pueblo
William White Bridge Widening
Scope of Work
EXHIBIT A
The William White Bridge (PUEWFMT.-.4 -HAR) widening project is being undertaken
primarily to improve the substandard width of the bridge for the four lanes of traffic on it_ In
addition, future traffic projections for this bridge, located on the only road accessing the airport
park, indicate a substantial increase in traffic which will make the problem of limited roadway
width more ctitieal.
Based on the problems noted above the widening/rehabilitation project proposed will include the
following major items of work:
I. The existing roadway would be widened to provide for four 12 foot travel lanes,
appropriate shoulders and a median. Widening would take place on both sides of
the bridge including required substructure and scour protection.
2_ A sidewalk would be added to the south side of the bridge and the existing
sidewalk would be widened to eight feet to enhance pedestrian safety.
3. The bridge and approach guard tail systems would be upgraded to meet current
standards.
4. Associated work on the approaches w the bridge, such as approach slabs and
pavement widening to provide a safe transition to the newly widened bridge
would be constructed.
5_ Utilities carried on the bridge will be resupported.
6. Both the bridge and approach roadways need to be repaved.
HCO?Ai A WdDEMUS- DEV%99pop%9r59%Scoptdoc ^ A^'^^
TOTAL P.02
PRE- CONSTRUCTION ADMINISTRATION CHECKLIST
Region: 02 Project Code #: 12856
Local Agency: City of Pueblo Project #: BRO 0020 -011
Design Project Manager: Location: William white Bridge
Resident Engineer: Robert Burch Description: Str. PUE WHITE -4HAR
The following checklist shall be utilized to establish the PRE - CONSTRUCTION
ADMINISTRATION CHECKLIST responsibilities of the individual parties to this
agreement.
RESPONSIBLE PARTY
LOCAL
NO.
DESCRIPTION OF TASK
AGENCY
CDOT
1.
Transportation Improvement Program(T.I.P.) ..........
x
2.
Design Data (CDOT Form #463) ........................
x
x
3.
Funding Authorization ...............................
x*
4.
LA /CDOT Project Agreement ...........................
x
x
5.
Utility, Railroad, and Consultant Agreements ........
x
6.
Consultant Selection . ...............................
x
7.
Field Inspection Review (FIR) .......................
x
8.
Public Hearings ...... ...............................
x
9.
Environmental Processes .............................
x*
10.
Design Approval ...... ...............................
x
x
11.
Final office Review (FOR) ...........................
x
12.
Force Account .Justification .........................
x
x
13.
Proprietary Item justification ......................
x
x
14.
Davis -Bacon wage Rates ( x Yes _NO) .................
x
15.
Design Exceptions .... ...............................
x
RESPONSIBLE PARTY
Preliminary Checklist
Revised Checklist
Final Checklist
Date:
Date:
Date:
*Requires FHWA concurrence /involvement.
04/29/96
LOCAL
NO.
DESCRIPTION OF TASK
AGENCY
CDOT
16.
Rights -of Way ........ ...............................
x*
17.
Plans, Specifications and Construction Cost Estimates
x
18.
EEO /DBE Requirements . ...............................
X*
19.
Advertising Less Than Three weeks ...................
x
20.
LA Ad and Award ...... ...............................
x
x
21.
Construction Administration .........................
x
Preliminary Checklist
Revised Checklist
Final Checklist
Date:
Date:
Date:
*Requires FHWA concurrence /involvement.
04/29/96